Installation of the detectors LHCb EA 39/2005 B.Chadaj
LHCb EA 39/2005 B.Chadaj Purpose of the Muon towers
identical 1 st part: Assembly of the chariot, mounting support beams according to LHBTMM_ on LHBTMM_056 2 nd part: Mounting of different floors according to LHBTMM_ together with the electronic and gas racks (2 racks/level). 3 rd part: Mounting of the muon station support beams according to LHBTMM_ between the the muon filters and the support structure.
Delivery LHCb EA 39/2005 B.Chadaj 26/27/28 Sep.
Installation step 1: base and level 1 LHCb EA 39/2005 B.Chadaj WEIGHT 2 Electronics racks level 1
LHCb EA 39/2005 B.Chadaj Installation step 2: level 2 and 3 2 Gas racks Level 3 2 Electronics racks level 2
Where we install Materiel access
PPSPS LHCb EA 39/2005 B.Chadaj Plan Particulier de Sécurité et de Protection de la Santé TRAVAUX DE : Installation des Structures de Support pour le Système Muon de LHCb Date prévue du début des travaux :