LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.

Slides:



Advertisements
Présentations similaires
Civil engineering for LIU – PS
Advertisements

Slide 1 of 39 Waterside Village Fête ses 20 ans.
Meeting 2015#1 Linac4 Coordination of Installation January 2015 – schedule follow-up EDMS J. Coupard EN-MEF1 week 3.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
1 avril 2003ST Workshop 2003 Thoiry1 L’ AOC informatisé: C.Jacot, E.Sanchez-Corral, L. Symons un moyen de prévention et de management Avec la complicité.
The Passé Composé The past tense in French is referred to as the passé composé. It is made up of two parts! You must always have these two parts to create.
Building 867 Controlled facility for the repair of radiated material 1 Betty Magnin TE-MPE-EMRadWG 05/12/12.
J-B. Lallement, B. Mikulec
BENCHMARK JOBS Marie-Laure Rivier – January 2015.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
Cultural Comparison 1 minute for directions (in English and French, spoken consecutively): You will make an oral presentation to your class on a specific.
EPRUS Etablissement de Préparation et de Réponse aux Urgences Sanitaires.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
What is this role and why are we all concerned? Palluel Julien - BE/CO meeting, Dec 2011.
MPE Workshop 14/12/2010 Building 867 A controlled facility for the repair of radiated material Betty Magnin TE-MPE-EM 1.
Welcome everyone.
Proposals/Propositions Organisation of Union Events together with National Events Members will recall that in recent years, the level of participation.
Slide 1 of Slide 2 of 35.
Session : Modele plan d’action Template Action Plan
African Centre for Statistics United Nations Economic Commission for Africa Session : Etapes de mise en oeuvre du SCN 2008 Milestones for implementation.
Slide 1 of Slide 2 of 37.
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Orientation 2006 by Pierrette Guimond Asssistant Director Graduate Programs School of Nursing.
EDHEC OPEN INNOVATION 2016 #OpenInno 2016 [Bus. Case title – Company] Company LOGO.
EN-CV Progress EHN1 Extension Project
YETS 2015/2016 Travaux EN/EL [ hors CF ] G. Cumer 22 septembre 2015.
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
1 1. Linac4 – 2012 Progress New 2.8MW klystron H- source DTL CCDTL RFQ.
Dashboard 2 October 2015 PH SO1. PREVENTION INCIDENT MANAGEMENT COMMUNICATION.
DAY 21. Translate the following sentences: 1.Marie is funny and creative. 2.John is strong and nice. 3.Marc and John are timid but generous.
Setting Europe in motion : Favoriser l’intégration Un projet de développement scolaire soutenu par L’Union Européenne Action Comenius 1.3 – 3 eme année.
Play the presentation & note down new vocabulary Complete the activities Le petit déjeuner Breakfast.
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
Procédure identification/déconnexion Pour le groupe de travail dédié.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Français 10/12/15 Ouvrez vos livres á la page 40. Faites #6. Two flies are on a porch: which one is the actor? Se dépêcher – to hurry. Dépêche – toi. Hurry.
Localisation des cables dans le booster. Objectifs Extraire depuis les DEC un fichier qui reprend toutes les données qui permettent de renseigner différentes.
Verification des DEC Comparaison des nombre de câbles dans les DEC et valeurs du Dashboard Vérification dans les DEC de l’existence de doublons Vérification.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL Emmanuel SAID BE-CO 20/11/2015 General De-cabling Project Meeting #5.
Negative sentences Questions
Procédure identification/déconnexion Pour le groupe de travail dédié.
French leve 1 - Homework due on May 2, 2016 – vocabulary  You are given at the beginning of the year the global list of the vocabulary list of BON VOYAGE,
Point de situation BE-CO sur l'identification des câbles les tests Emmanuel SAID Herve Cornet.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
Do now: translate into English 1.Je voudrais une livre du bœuf. 2.Tu aimes le poisson? 3.Vous prenez du poulet avec (with) des pommes de terre? 4.Nous.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 2nd June 2016.
De-cabling strategy during YETS August 2017
Injectors de-cabling Project General information June 2017 INDICO:
Activités LHC pour BE/ICS Systèmes d’Alarmes YETS et LS2
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016.
French is spoken by approximately 120 million people in Africa.
EHN1_NP : Campagnes de câblage et planning
Activités EN/EL-FC EYETS16-17
French is spoken by approximately 120 million people in Africa.
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
AUG Risk Analysis.
« Chargés de consignation » & projet de-câblage
CRG TM for YETS November 6th 2017.
Safety Talk EN DSO & EROS
AP. Bernardes /SSO injecteurs, K. Boonroy/HSE-OHS, G. Cumer/EN-ACE, H
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Scope of the project Organization Master schedule Dashboard after the YETS Nature des travaux (sécurité électrique) Constraints Booster EYETS 2016 : other activities and constraints, master schedule today LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Project scope The De-cabling project scope is to identify and remove obsolete cables within the PSBooster, SPS and PS, until the end of LS2. The activities will be organized according to the following priorities and goals: First priority PSBOOSTER; Second priority SPS; Third priority PS. LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Prioritization The identification of the obsolete cables in the PS Booster is the top priority, because of the needs for new cables for the LIU project, with the following deadlines: Labelling and disconnection during YETS ; Removal of obsolete cables during EYETS and if necessary YETS For SPS5 and SPS3: Identify respectively 50% and 40% of existing cables for removal, because of the congestion of the cable trays and the need to pull new cables. Moreover, the project team will have to closely follow the needs of the LIU project taking into account the availability of resources. For the PS, the project team will identify the obsolete cables. The deadline is: during 2016, the project team will propose possible identification and removal slots, taking into account the availability of resources and further needs of LIU project. LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Master schedule LIU and EL activities meeting 18 mai 2016 If necessary

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Organization of the project A Core team project including members of EN/EL - EN/ACE and HSE/RP Project link persons from 14 groups for identification and disconnection phases : BE/BI – BE/CO – BE/RF – BE/ICS – TE/ABT – TE/EPC – TE/MSC – TE/VSC – TE/MPE – HSE/RP – IT/CS – EN/CV – EN/EL – EN/STI EN/EL is the main budget owner (for removal phases) The identification phases are funded by the groups concerned. EN/ACE has a slight budget for the cables without owner. LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Organization of the project, documentation Project Management Plan : EDMS EDMS Project documentation : EDMS CERN EDMS CERN Indico : Dedicated share point : LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Dashboard after the YETS LIU and EL activities meeting 18 mai 2016 Bravo à S. Evrard et son équipe !

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Nature des travaux (sécurité électrique) En application de la norme UTE , le core team du projet de De-câblage des Injecteurs a conduit une analyse de risque sur la nature des travaux et des interventions pour ce projet. En application des recommandations du DSO/EN, du Safety Support Officer du LS2 et des Operational Safety Support Officers, les travaux et les interventions effectués dans le cadre de ce projet ont été classifiés en tant que Travaux de nature électrique. LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Nature des travaux (sécurité électrique) En conséquence, les travaux et les interventions liés au projet devront être réalisées par du personnel électricien dûment habilité : Les travaux liés à l’identification et la déconnexion des câbles obsolètes devront être réalisés par des chargés d’intervention des groupes concernés, (avec des câbles à identifier) avec une habilitation BR ; Les travaux de dépose et enlèvement des câbles obsolètes devront être réalisés par des opérateurs électriciens EN/EL avec une habilitation H1/B1, sous la responsabilité d’un chargé de travaux EN/EL habilité H2/B2 ; Le chargé de travaux devra avoir reçu et signé des attestations de consignation pour travaux de la part des Chargés de Consignation des groupes concernés (ayant des équipements installés). LIU and EL activities meeting 18 mai 2016

Injector De Cabling Project Classification des travaux Les travaux et les interventions effectués dans le cadre de ce projet ont été classifiés en tant que Travaux de nature électrique. LIU and EL activities meeting 18 mai 2016

Injector De Cabling Project Procédure de consignation phase de déposes des cables LIU and EL activities meeting 18 mai 2016 Y Z W Attestations de consignations pour travaux (d’ordre electrique) Chargé de travaux “X” (H2/B2) Exécutants électriciens (H1/B1) Chargé de travaux “Y” (H2/B2) DSO departement B Pilote du groupe resp. des travaux DSO departement A Identification, via les DSO, des groupes devant consigner leurs équipements, DRAFT Chargé de consignation HC/BC X

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Booster EYETS 2016 : contraintes et co-activités Systèmes devant rester sous tension, opérationnels pour la sécurité des personnes  Eclairage de sécurité  Désenfumage  Contrôle d’accès  Détection incendie  AUG  Ventilation (en étude avec RP)  Alarmes de niveau 3  Alarmes évacuation  Radmon ? LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Booster EYETS 2016 : contraintes et co-activités Systèmes devant rester sous tension, opérationnels pour les travaux du EYETS  Buffer zone  Ascenseur  Pont roulant  Eclairage Normal  Star-point  Bâtiment 37  Coffrets de prises dans la machine LIU and EL activities meeting 18 mai 2016

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Booster EYETS 2016 : contraintes et co-activités Structures et faux-planchers LIU and EL activities meeting 18 mai 2016 Identify areas which require reinforcement by mapping, securing and strengthening of critical supports which are in close proximity to the racks Follow the procedures and practices set out by C. Bedel during the YETS cable identification campaign. 5 days at the start of EYETS dedicated to corrective interventions on the “Faux Planchers”. En étude avec HSE

De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Booster EYETS 2016 : contraintes et co-activités Autres travaux EYETS : co-activités ( D. Hay ) LIU and EL activities meeting 18 mai 2016  Tests AUG (1 jour en week-end)  BCER:  Consolidation réseau basse tension EN/EL (nouveaux tableaux Machine et alimentations des racks par le haut, déposes des gaines canalis dans les faux planchers) Il y a une synergie à faire cette consolidation en même temps que la dépose des câbles ! (mêmes contraintes de sécurité, mêmes consignations et faux planchers)  Installations de racks et bunker transfo pour TE/EPC (BRF2 + BAT)  dans la Machine Booster  Agrandissement de la trémie pour le PS Booster  Repair or replacement vacuum chamber of bending magnet 151 of PSB (Remove corrector magnets in 15L1 and BE.SMH)  Tirage de câbles ? Ces travaux sont possibles en co-activités avec EN/EL

LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, PS and SPS Booster EYETS 2016 : duration LIU and EL activities meeting 18 mai 2016