Politique japonaise Collaboration ILD Tracking et aimant PDAP et rapport LCB Highlights de LCWS15 Réunions 2016 P. Colas NOUVELLES DE L’ILC 16/11/2015P.

Slides:



Advertisements
Présentations similaires
Mardi 20 Novembre 2012 Recap I can
Advertisements

1 Technical Design, Accélérateur &Détecteurs 2012.
Core Module 10 Advocacy: Engaging the Public Association des conseils scolaires des écoles publiques de l’Ontario (ACÉPO) Association franco-ontarienne.
ROLE PLAY The role play is about communication and exchange of information. It is not the time for a LONG conversation! You can get full marks for very.
Numbers, Months, Days, Dates
Transition Unit Personal Information Lesson 1
ILC Paul Colas. Historique 1981 Proposition par B. Richter er workshop à Sarisälka Conceptual Design Report TESLA 2001 TESLA+XFEL 2003.
Fédération canadienne des étudiants et étudiantes en génie | Canadian Federation of Engineering Students Facilitateur | Facilitator: Justin Bertagnolli,
 The compound past tense (past indefinite), more commonly known as the passé composé, refers to an action or event completed in the past.  The word “compound”
Faith and Light International Formation Session 2010 Energizing Meetings
January 26 th 2015 European Organization for Nuclear Research CLIC WORKSHOP 26/01/2015 CLIC WORKSHOP 2015, Geneva, Switzerland Optics Design and Beam Dynamics.
THE ADJECTIVES: BEAU, NOUVEAU AND VIEUX 1.
Forming questions in French
Booking a hotel room WALT: booking accommodation WILF: describing type of accommodation you want to book and creating/performing a role play (3-4) WILF:
Les Mots Interrogatifs
ANR RADIA (ex-RADEC) Desintegrations radiative des particules belles.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
FREE HEALTH CARE AND RISK OF MORTALITY ON UNDER 5 YEARS OLD CHILDREEN IN BURKINA FASO : EVIDENCE FROM SAPONE HDSS By Malik LANKOANDE Msc Demography Projet.
Le poisson d’avril.
ÉCOLE POLYTECHNIQUE CONCOURS 2010 Workshop NSERC scholarship application 23 avril 2015 École Polytechnique.
Les verbes réfléchis au passé composé
Activities for the first week of the École 1 unit.
Lucia - LAPP Phi* meeting - 3 novembre Correcting back to the electrons after FSR So far C Z defined w.r.t. electrons before FSR Z status = 3 and.
EU Joint Programming: Belgium Expert meeting on EU Joint Programming April 26th 2013.
Irregular Adjectives Not all adjectives are made the same.
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables How to plan grid investments smartly? Moulin de Beez, Namur.
Bienvenue and Welcome to Our French II Live Lesson! We will begin shortly!
Le octobre. L’emploi du temps Qui est présent? Résumons Les accords/desaccords.
Welcome everyone.
Slide 1 of Slide 2 of 35.
Object pronouns How to say “him”, “her”, “it”, “them”
Les noms et les articles
Slide 1 of Slide 2 of 37.
FAIR platforms Mats Wilhelmsson Meeting 12 May 2015.
R. Aleksan Saclay Fevrier 24, 2015 Informations générales CECP Prochain RV.
Planification stratégique Strategic Planning Saturday, May 5, 2012 / Samedi, le 5 mai, 2012.
LES QUESTIONS Etre ou ne pas être... Telle est la question.
1. Est-ce que Est-ce que, literally translated "is it that," can be placed at the beginning of any affirmative sentence to turn it into a question: Je.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Orientation 2006 by Pierrette Guimond Asssistant Director Graduate Programs School of Nursing.
4 th European narcolepsy Day in Madrid « One for All, All for One » Alexandre Dumas What’s news since Bologna ? The 3rd day was the occasion: -To make.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
Présentation du nouveau Site Hercules. Plan Nouvelle ergonomie Nouvelle base de données Nouvelle procédure d’inscription Nouveaux outils d’administration.
1CSP 26_11_2010 K.Schirm, CERN Accord Technique No 4, CLIC K. Schirm CERN, Geneva, Switzerland.
Journees de prospective LAL/ Seillac 2012
1 1. Linac4 – 2012 Progress New 2.8MW klystron H- source DTL CCDTL RFQ.
Flash-on-flash-off! You will see some French text in a minute but it will only be on the board for a minute then it will disappear.
French 1 Chapter 2 Grammar 2
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Français 10/12/15 Ouvrez vos livres á la page 40. Faites #6. Two flies are on a porch: which one is the actor? Se dépêcher – to hurry. Dépêche – toi. Hurry.
QUELLE HEURE EST-IL? (What time is it?) Pages Nicole Fecteau, Timothy Edwards Middle School, December 2015.
Negative sentences Questions
Tests en faisceau à DESY de la TPC Micromegas D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J.-P. Martin, T. Matsuda, M. Riallot, F. Senée, Y-H.
ILC physics case LHC 8->14 TeV 300 fb-1, 3 ab-1 ILC 235 ->500 GeV 1 ab-1.
French web site for the Linear Collider Some news to start the discussion… (  Question mark in red)
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
R. Aleksan Saclay Février 23, Visite collègues chinois de IHEP et Tsinghua  décembre  3 personnes  GOA Yuanning, QI Huirong, RUAN Manqi.
Paul Colas, CEA/Irfu. Groupe SPP/ILC P. Colas, M. Titov (temps partiel) M. Besançon, C. Royon (temps très partiel) P. Lutz (retraité) Etudiants: W. Wang.
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
Le Verbe Avoir L’Objectif: to learn the verb avoir in the present tense and to be able to use it in context By: B. Antoniazzi DDE French 1 U1 L2C AVOIR.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
Les endroits I can talk about places.
Resource allocation: what can we learn from HPC? 20 janvier 2011 Vincent Breton Crédit: Catherine Le Louarn.
Nouvelles du LC P. Colas. Le LC en France et dans le monde Partant du constat que seul un collisionneur linéaire (et non circulaire) permettrait d’aller.
Wilfrid da Silva (MCF) et Frédéric Kapusta (CR1) Activité ILC ( Futur Collisionneur Linéaire) Premiers en France à étudier la technologie sub-micron pour.
C’est mercredi!! Pour être prêt: 1. Trouvez un livre et lisez p. 313 Note Culturelle: Les sports d’hiver 2. Sortez: 1. le devoir: Fanfold; p. 311 # 3 2.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
CSTS/SPP sur les futurs collisionneurs:
Transcription de la présentation:

Politique japonaise Collaboration ILD Tracking et aimant PDAP et rapport LCB Highlights de LCWS15 Réunions 2016 P. Colas NOUVELLES DE L’ILC 16/11/2015P. Colas - Nouvelles d'ILC1

Planning by Japan Yasuhiro Okada (KEK) LCWS 2015, November 5, 2015 October 2012: Japanese HEP community proposed to host the ILC in Japan as a global project. Statements on ILC hosted in Japan The European Strategy for Particle Physics Update 2013 ACFA/AsiaHEP Statement on the ILC (September 2013) P5 report (May 2014) ICFA statements (January and July 2014) September 2013: Science Council of Japan (SCJ) sent Report on the ILC Project to MEXT. May 2014: MEXT set up ILC Advisory Panel with two WGs (Physics, TDR Validation) After the 4 th meeting in June 2015, ILC Advisory Panel disclosed “Summary of ILC Advisory Panel’s Discussions to Date” in August Recent Developments on Promotion of the ILC Project in Japan

From KEK DG M. Yamauchi’s presentation at this workshop 3

4 En France: co-optation de Marc Winter pour représenter la communauté et être l’interlocuteur des gouvernements et des collègues japonais. Olivier nommé ‘liaison projet’ par la direction de Saclay. Action intense de Maxim Titov envers différentes instances. L’action des français a été positivement remarquée à LCWS 2015

16/11/2015P. Colas - Nouvelles d'ILC5 5/10: Visite du comité NRI (Nomura) mandaté par le MEXT au SACM – Rencontre du SACM et de 3 compagnies (inox, Air Liquide, …) 8/10 : Visite des physiciens Y. Okada (direction KEK) et T. Yamashita (U. Tokyo): message « le gouvernement japonais travaille beaucoup, communique peu » Le rapport de NRI sera remis au MEXT en février.

We now have a realistic (though unofficial) estimate of the schedule (S. Komamiya, Lepton-photon 2015) : Start 2016? 2018? 2033 ? Tracking: Vertex detector TPC Silicon → (no one working on SET?) Magnet P. Colas - Nouvelles d'ILC616/11/2015

t0 = Ground Breaking ? The yoke and the solenoid have to be assembled on surface site very early (start Y3) The remaining of the tracker is for end of Y8 P. Colas - Nouvelles d'ILC After Y. Sugimotos 16/11/2015

P. Colas - Nouvelles d'ILC8 LHC

ILD tracking Physique PDAP meeting and LCB report ILD meeting P. Colas - Nouvelles d'ILC916/11/2015

Anti DID Recent evolution : -Quadrupole re-design might allow reducing the crossing angle ( mrad) (B. Parker at Oshu, 9/2014) -Anti-DID might be around the beam pipe -Disaligning the two halfs of the solenoid might play the role of the anti-DID -Re-estimation 2013 of the cost : 131 MILCU (including yoke) P. Colas - Nouvelles d'ILC DBD 1016/11/2015

Top quark P. Colas - Nouvelles d'ILC1116/11/2015

Top quark P. Colas - Nouvelles d'ILC1216/11/2015

Top quark P. Colas - Nouvelles d'ILC1316/11/2015

Top quark P. Colas - Nouvelles d'ILC1416/11/2015

Top quark P. Colas - Nouvelles d'ILC1516/11/2015

Micro-Channel Cooling on ultra-thin Silicon sensors Low cost mono-phase fluid: H 2 O Low volumetric flow (~1l/h) and low pressure (< 1bar) are enough to dissipate the heat in the front end Good agreement with the FE simulation inside an error area of 10% Thermal Figure of Merit (TFM) of ~ 1 K·cm 2 /W 6W H2OH2O Micro-channel pattern in handle wafer Standard etching procedure 3D-printed adaptor Peek tube See talk in Vertex/Tracking session on Tuesday Advanced vertex detector cooling concepts: from air flow to micro-channel cooling M.A. Villarejo, I. Garcia (IFIC Valencia) P. Colas - Nouvelles d'ILC1616/11/2015

R&D on microstrips: ILGAD Sensors material dominant contribution to the material budget. Internal signal amplification in the sensor allows for thinner sensor preserving the SNR. Developing strip-like Low Gain Avalanche Detectors (reach-trough avalanche photodiode with n++ / p+/p-/p+ structure) with typical signal gain < 20 with reduced excess noise. PAD layout Electron readout Amplification observed in pad and strip like LGAD with segmented amplification region and electron readout To cope with spacial non-uniformities in the amplification: new prototypes with non-segmented amplification region Inverted-LGAD (with hole readout) Manufacturing CNM ongoing. See talk by I. Vila at Wednesday afternoon tracking session RD50 P. Colas - Nouvelles d'ILC1716/11/2015

TPC New resistive layer tested in March 2015 : Diamond-like carbon. Results as good as with Carbon- loaded kapton. More robust and easier procurement P. Colas - Nouvelles d'ILC1816/11/2015 GraphiteDiamond

GridPix progress Wafer-based post-processing to add a protection layer and a mesh on pillars on top of the chips (107 chips at a time) March 2015, there was a successful test with 3 modules (96 chip each) partially equipped : 160 chips! This shows that this technique is applicable to large areas This opens the way for ultimate dE/dx resolution P. Colas - Nouvelles d'ILC1916/11/2015

PDAP Detector Advisory Panel Light-weight review led by P. Grannis, with Jungi Haba and Sandro Palestini. Also present: LCB (Hitoshi Yamamoto, Maxim Titov –by phone, Jan Strube) Message from ILD: we are ready with proof of principle and part of integration work, we need funds to make engineering design. We feel that a green light from Japan is needed for this. Hitoshi insists on ‘running in front’ improving the design. Next review not before 1 and ½ years, or about 1 year after the ‘go’. P. Colas - Nouvelles d'ILC2016/11/2015

PDAP LCB Report Discussion on the status : several partial contributions Plan was not clear : by institute or by technology? Signatories?... To be sorted out in the coming days by/with the conveners. Present status: drafts by Bonn, Carleton, DESY and Saclay. P. Colas - Nouvelles d'ILC2116/11/2015

Construction de la collaboration ILD Création d’une ‘Institute Assemblee’. Election de Jan Timmermans comme président, chargé de monter la collaboration. 68 instituts Election de Ties Behnke come spokesman I.A. :No quorum (31 whereas 35 was necesssary) -> vote électronique Nomination of Tohru Takeshita (deputy chair of IA), and Kawagoe (deputy spokesperson), K. Fujii (Physics), F. Gaede (software) 4 nouveaux instituts (2 n’assistaient pas) Appel à nominations pour 2 membres de l’ Executive Board (sans rôle defini pour l’instant). 2 autres vont suivre 16/11/2015P. Colas - Nouvelles d'ILC22

Réunions LC 2016 CLIC Janvier ILD integration mars à KEK JCL Paris fin mars FJPPL ECFA LCWS (30 mai – 5 juin) Santander LCWS2016 en Asie (Japon? Viet Nam? En octobre?) 16/11/2015P. Colas - Nouvelles d'ILC23

16/11/2015P. Colas - Nouvelles d'ILC24

16/11/2015P. Colas - Nouvelles d'ILC25

16/11/2015P. Colas - Nouvelles d'ILC26

16/11/2015P. Colas - Nouvelles d'ILC27

16/11/2015P. Colas - Nouvelles d'ILC28