EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.

Slides:



Advertisements
Présentations similaires
Mardi 20 Novembre 2012 Recap I can
Advertisements

Modifications of working conditions in the host states Report on the AT Board held on 18 April 2000 New minimum wages in Switzerland Impact of the 35-hour.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
Français 2, 16 mars 2015 We will be doing an enrichment project during Business Week that reviews concepts we have learned. What format would you like.
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
Rénovation ventilation SR2, SR3, SR5, SR6, SR7 Technical Review Y. BODY EN-CV.
EN-CV Progress EHN1 Extension Project
Activités CV Consolidation NA pour YETS2015, EYETS2016 et YETS2017 Jani Lehtinen – 24/09/ Activités CV - Consolidation NA pour YETS2015, EYETS2016.
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
EN TSO Workshop nd June 2016; 14th June 2016; 30th June 2016 Purpose: Share a common vision amongst the EN safety actors Involve the TSOs in defining.
EHN1 – EN/EL T. OCTAVE 01/09/16. SOMMAIRE BESOINS DES UTILISATEURS MODIFICATION INSTALLATION DE CHANTIER ECLAIRAGE + PRISES TABLEAU ELECTRIQUE SOUS STATION.
Democratic Republic of the Congo (DRC) Arsene Binanga FP Programs Country Director
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
SPS préparation travaux LS2
EHN1 EXTENSION PROPOSITION EN/EL ECLAIRAGE DE SECURITE ECLAIRAGE MINIMUM ARRET D’URGENCE T. Octave
EHN1 EXTENSION PROPOSITION EN/EL ECLAIRAGE DE SECURITE ECLAIRAGE MINIMUM ARRET D’URGENCE T. Octave
Travaux alimentation électrique SLX8 (3852)
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 2nd June 2016.
De-cabling strategy during YETS August 2017
ACTSR MEMBERS GENERAL MEETING 8 JUIN 2017 BOBST factory: Mex, Laussane
Résumé wLCG/EGEE Operations Workshop
Calendrier scolaire Premier/dernier jour
EHN1 – EN/EL T. OCTAVE 25/08/16.
Injectors de-cabling Project General information June 2017 INDICO:
EHN1 Extension Infrastructures et planning pour les baraques avec racks refroidis pour NP02 et NP04 G. Cumer EN/ACE Technical meeting 7 Octobre 2016.
Evaluation et Gestion de la Performance au CERN
71th EAs integration and coordination meeting - EHN1 extension
EHN1_NP _ 13 juillet 2017 Liste des actions G. Cumer EN/ACE.
EHN1 – EN/EL Avancement T. OCTAVE 24/03/16.
Activités EN/EL-FC EYETS16-17
70th EAs integration and coordination meeting - EHN1 extension
67th EAs integration and coordination meeting - EHN1 extension
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
AUG Risk Analysis.
Réunion service Instrumentation Activités CMS-Traces
Cross Cutting Mapping Project
Heures de travail spéciales – CA 23
Antitrust as an Endangered Practice: Why we Might not be Around in Ten Years from Now Antoine Winckler.
Les principaux règlements et travaux européens se référant aux groupes
- User case - 3D curve length optimization
66th EAs integration and coordination meeting - EHN1 extension
Reference Document Treasury Board of Canada Secretariat © Her Majesty the Queen in Right of Canada. This information is released under an Open Government.
CRG TM for YETS November 6th 2017.
Prépositions.
Junior Cycle 2009-Written Expression (80)
Routage réseau Incendie Extension EHN1
Copyright 2007 – Biz/ed Globalisation.
72th EAs integration and coordination meeting - EHN1 extension
Leadership Styles Mrs. Keith Main Types of Leadership Styles 1.The Autocratic or Authoritarian Leader 2.The Democratic or Participative Leader.
Six months after the end of the operations
Camera Slow Control for LST and Nectar cameras
Quelle est la date aujourd’hui?
Budget Meeting Saturday Oct 29, 2016 à 1:30PM at the CLUB HOUSE
Test your listening skills!
Quelle est la date aujourd’hui?
Vocabulaire les jours de la semaine
BRMS Implementation Status Update Template designed by 18-July-2015.
Réunion plénière Groupe régional de coordination sur l’ODD4-Education 2030 en Afrique de l’Ouest et du Centre (GRC4-AOC) Mardi 10 octobre 2017, 9h-13h15.
BIENVENUE. Sommaire Maison Intelligente La Domotique ? Qu'est ce que c'est la domotique ? Détails et exemple Ma partie dans ce projet Détails de mon projet.
le Jeudi 11 Avril 2019 toute la journée et
Travail de cloche Translate into French: The cows who give the most milk are those which eat the best grass.
Français II – mardi 31 janvier horaire quotidien
Mercredi 8 mai Français II
3rd February, 2016 Alstom Controlling. © ALSTOM All rights reserved. Information contained in this document is indicative only. No representation.
Safety aspects for activities
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
L’allemand (m.). l’allemand (m.) l’anglais (m.)
Transcription de la présentation:

EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28

Tuyauterie Eau Glacée DN100 Tuyauterie DN25 EG pour climatiseur baraque Passage Tuyauterie Eau Glacée alim fan coil baraques coté Jura Passage derrière gaine ventilation Integration

Poutre GC Tuyauterie DN25 EG + calorifuge pour climatiseur baraque Passage Tuyauterie Eau Glacée alim fan coil baraques coté Jura Integration Issue

Tuyauterie DN25 EG pour climatiseur baraque Passage Tuyauterie Eau Glacée alim fan coil baraques coté Jura Passage devant gaine ventilation Integration Solution

Integration Future works in GHN106 technical gallery : EN-EL and EN-CV activities 3D mock-up review to be done as soon as possible between EL, CV and EA (Week 18 TBC ?)

Miscellaneous EN-CV Tenders: HVAC tender (documents released)  Bidders’ conference done on 19 April 2016  Peers meeting (July) / FC (September) : maybe advanced to June ? COOLING tender (technical specification in circulation)  Specification committee done on 26 April 2016  Contract adjudication: July 2016 Racks cooling issue: 4 solutions studied (see sent on 13 April by JR) Solution Cooling power [kW] Maximum number of racks (18 kW/rack) Budget impactSchedule impact 1724 (max 5)NO (max 20)Minor Some works during EYETS Major Most of the works during EYETS Major Some works during EYETS