Status ATF2 Andrea JEREMIE. 4 ATF2 ATF2 extraction line 4.

Slides:



Advertisements
Présentations similaires
50Hz Literature 2007 Literature Plan. 50 Hz Literature With new Product Introductions … –Applications Manual (part of product catalog) –Submittal Data.
Advertisements

Countryside Paintings by Reint Withaar
LEÇON 101. Écrivez vos devoirs: Continuez de préparer lexamen final. Tout de suite: Sortez vos 1.iPads 2.notes on Marie Antoinette 3.any/all of the sentences.
How many of these flags do you recognise? Work with your partner to see if you know many – write them down - some will crop up shortly!
How many of these flags do you recognise? Work with your partner to see if you know many – write them down - some will crop up shortly!
IB Language B French and German
Start with verb ? in the ? tense Start with verb ? in the ? tense Change the ? of my participe passé with ? Change the ? of my participe.
1 Welcome to LAPP ATF2 meeting in Annecy October 9 to 11, 2006.
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
January 26 th 2015 European Organization for Nuclear Research CLIC WORKSHOP 26/01/2015 CLIC WORKSHOP 2015, Geneva, Switzerland Optics Design and Beam Dynamics.
Commencez Écrivez ta date d’anniversaire et faites la queue en ordre des mois de l’année. [Write your birth date in French on a card and line up according.
Slide 1 of Slide 2 of 35.
Johann Collot, 10/10/ IBL-Phase0 au LPSC. Johann Collot, 10/10/ Contributions LPSC Mécanique (WG3) Ingénierie de l'extraction du tube à vide.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Nouvelles d’ATF2 au Japon Suite à une réunion ATF2 qui s’est tenue la semaine dernière au Japon (8 heures de décalage horaire!) A.Jeremie-17/01/12- service.
Dernières nouvelles d’ATF2 A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier.
Programme LAViSta côté LAPP A.Jeremie 12 décembre 2007 J.P.Baud, B.Bolzon, L.Brunetti, G.Gaillard, N.Geffroy, J.Tassan.
FD relative displacement measurements A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner, D.Schulte, R.Tomas-Garcia B.Bolzon.
The relationship between the different FEB projects The first MainBoard and its Processing DaughterBoard will be developed for 3-in-1, but keeping the.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
IP Multicast Text available on
Year 11 French Homework Devoirs… 2017 – 18 Autumn T1
Travaux alimentation électrique SLX8 (3852)
Supporting Students Mental Health Appuis à la santé mentale des élèves
Traçeur d’outils digital : Trackit !!
Formules en 2 étapes 1MPES4
IGTMD réunion du 4 Mai 2007 CC IN2P3 Lyon
The nation now known as The Democratic Republic of Congo was at one time the personal property of the King of Belgium.
Interventions BE-BI LS2
mardi, le douze septembre
mercredi, le treize septembre
Projet MSS2.
Pistes pour la Muographie
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
Unité 2 Leçon 1 I can describe myself and others
Why is it important to plan ahead for the future?
2.African Situation  African power sector today  Problems and challenges 3.Moroccan situation.
mardi, le douze septembre
Warm-Up: In your notebook, please write the date, the following question (the part in bold), and your answer. Once you know someone, what’s something you.
Present Perfect Simple X Present Perfect Continuous.
North area S. Girod, EATM,
Reconstruction of HR1 events taken in test beam
Mercredi 15 Novembre Français PreAP-AP
Résumé CB WLCG du 3 février 2005
CRG TM for YETS November 6th 2017.
Scenario d’intégration du pixel alpin
Combien coûte? Ça fait combien?
Bienvenue! Welcome to Westside
Leadership Styles Mrs. Keith Main Types of Leadership Styles 1.The Autocratic or Authoritarian Leader 2.The Democratic or Participative Leader.
1. Staircase + focus winter
Room Cool Row Cool Air Distribution Unit Room Cool Row Cool Air Distribution Unit Precision cooling Precision cooling MV PDU LV PDU PQC Transformer Generator.
Camera Slow Control for LST and Nectar cameras
Vendredi 18 mai Français I
Localization problems for an AUV
LE PASSÉ COMPOSÉ 1 This is aimed ay Year 8, to introduce the Perfect tense, first with AVOIR verbs.
Progress check Learning:
beam charge measurements
PROPOSAL FOR THE DELIMITATION OF SURFACE WATER BODIES IN THE FRENCH PART OF THE SCHELDT DISTRICT Dans la Directive Cadre, la qualité écologique est le.
Paul Eluard Dans Paris.
Travail de cloche Write three sentences: the first must use the verb prendre and a type of sandwich as the direct object. the second must use the verb.
Travail de cloche Que buvez vous avec votre dÎner?
Travail de cloche Pensez à un personnage du livre que vous venez de finir. Quel cadeau, que vous pouvez acheter à Amazon.com, voulez-vous lui donner?
Programme de la journée
5.1 Handyperson You’ve been hired to fix several items on a home. You need to climb the ladder to fix each item. You climb the ladder by answering questions.
Reporting on national biodiversity strategies,
Travail de cloche Pensez à l’intrigue de deux livres que vous avez lu pendant ce semestre. Comment sont-ils similaires et comment sont-ils différents?
Travail de cloche Vous avez reçu le permis de l’administration pour établir un nouveau code vestimentaire à LCHS. Quel sont quatre règles de votre code?
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

Status ATF2 Andrea JEREMIE

4 ATF2 ATF2 extraction line 4

Contributions du LAPP à ATF2 Support Final Doublet et mesures de mouvement relatif Générateur de mouvement du sol et participation au commissionning(B.Bolzon) – pas présenté ici Etude d’un feedforward pour CLIC Usinage de la chambre à vide du IP-BPM (L.Journet)

Support Doublet Final ToleranceMesure QD0 Mesure QF1 vertical7 nm (for QD0) 20 nm (for QF1) 4.8 nm6.3 nm perpendic.~ 500 nm30.7 nm30.6 nm parallèle~ 10,000 nm36.5 nm27.1 nm QF1 remplacé: 3x + lourd Mais moins de multi-pôles Nouvelle chambre au IP Vérifier que le Doublet Final répond encore aux tolérances => campagne de mesures à définir Novembre 2008

Achat de 15 capteurs par le LAPP grâce à l’ANR ATF2

Set-up One sensor cabled Other sensors in boxes All cables available NI data acquisition (PXI) Labview program Tti Power supply Power distribution boards FJPPL-FKPPL ATF2 at LAL 10-13/02/ A.Jeremie

Mais… Différences de réponse des capteurs et cohérence mauvaise… à résoudre avant envoi au Japon

Possible plan (under work) Still need to optimize the persons needed for operations: Golden Week and sensor installation and tests Integration (if still needed) and first IP-QF1 relative motion meas. Start testing with beam Today Shipment Tests in Annecy FJPPL-FKPPL ATF2 at LAL 10-13/02/ A.Jeremie Continuous run?