CSTS/SPP sur les futurs collisionneurs:

Slides:



Advertisements
Présentations similaires
CEA DSM Irfu LP – TPC: MicroMegas Panels 02/04/2008Franck SENÉE Réunion électronique AFTER1 D. Attié, D. Calvet, P. Colas, C. Coquelet, X. Coppolani, E.
Advertisements

TPC Large Prototype: Vers les 7 modules Micromegas
Etude de la mécanique dans le cadre européen AIDA Déformations selon : -Matériaux -Géométrie (3 ou 4 anneaux) Intégration dans laimant de lILD à côté des.
CEA DSM Irfu LP – TPC: MicroMegas Panels 08/04/2008Franck SENÉE Visite SPCI1 D. Attié, D. Calvet, P. Colas, C. Coquelet, X. Coppolani, E. Delagnes, F.
P. Colas. Situation: on vient de tester la chaine complète avec 1 des 7 modules New detector : new routing to adapt to new connectors, lower anode resistivity,
Une petite lettre à Père Noël…. A. Blondel, G. Prior, S. Borghi,R.Sandström, E.Gschwendtner, A. Cervera, P. Bene, J.-P. Richeux, S. Gilardoni.
FCC Design Study General News
Z SILICON DRIFT DETECTOR IN ALICE When a particle crosses the thickness of SDD electrons are released. They drift under the effect of an applied electric.
1 Technical Design, Accélérateur &Détecteurs 2012.
Overview %%%%%%%%%%%% %%%%%%%%%%%% %%%%%%%%%%%% %%%%%%%%%%%% %%%%%%%%%%%% %%%%%%%
ILC Paul Colas. Historique 1981 Proposition par B. Richter er workshop à Sarisälka Conceptual Design Report TESLA 2001 TESLA+XFEL 2003.
I Activité de R&D: vers une cavité RF équipée 'made in France' Construire une cavité ILC Eacc = 40 MV/m Q0 = 2e10 équipée et testée en cryostat vertical.
David Attié & Marc Riallot Réunion FCC, Saclay Modification du Prototype de TPC 8 décembre 2014.
Activités LC au LAPP et ressources humaines en 2012 Équivalent Temps Plein total : 5.6 physiciens, 8 ingénieurs et 2.2 techniciens Étude de canaux de physique.
R. Aleksan Saclay Fevrier 24, 2015 Informations générales CECP Prochain RV.
ASPIC Front-end CCD Readout Circuit For LSST camera
St. Theresa Province – Uganda La Province de Ste. Thérèse – Ouganda.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Tests en faisceau à DESY de la TPC Micromegas D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J.-P. Martin, T. Matsuda, M. Riallot, F. Senée, Y-H.
O. Napoly, Réunion P2I8 juin Grande Salle Blanche de l’Irfu à Saclay O. Napoly, CEA-Saclay, Irfu/SACM.
ILC physics case LHC 8->14 TeV 300 fb-1, 3 ab-1 ILC 235 ->500 GeV 1 ab-1.
Paul Colas, CEA/Irfu. Groupe SPP/ILC P. Colas, M. Titov (temps partiel) M. Besançon, C. Royon (temps très partiel) P. Lutz (retraité) Etudiants: W. Wang.
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
Nouvelles du LC P. Colas. Le LC en France et dans le monde Partant du constat que seul un collisionneur linéaire (et non circulaire) permettrait d’aller.
Wilfrid da Silva (MCF) et Frédéric Kapusta (CR1) Activité ILC ( Futur Collisionneur Linéaire) Premiers en France à étudier la technologie sub-micron pour.
1 Activité faisceau longue distance: développement prototype de détecteur 5 juillet 2013 programme de R&D sur la technologie LAr pour détecteur lointain.
Accélérateur laser – plasma
Implication LPNHE-ATLAS dans la R&D SLHC CS LPNHE 2 Octobre 2007.
Réunion groupe 18/1/12 Nouvelles et dates. Appels d'offre - P2IO R&D ATF2: Accepte - P2IO R&D Ecal: Refuse et en attente de la justification Par conversation.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
Activités de l’IPNL en préparation pour le prototype Un d é tecteur de 1 m2 é xsite d é j à IHEP produira les 40 GRPC n é cessaires Mais : 1- Il faut les.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
PIPE SUPPORTS 1 Pipe supports inside the compression station and pumping stations AUGUST 2014.
16/11/ Moyens –Humains –Matériels –Logiciels Compétences Projets Service Mécanique.
Traffic Sign Recognition Jacob Carlson Sean St. Onge Advisor: Dr. Thomas L. Stewart.
Template Provided By Genigraphics – Replace This Text With Your Title John Smith, MD 1 ; Jane Doe, PhD 2 ; Frederick Smith, MD, PhD 1,2 1.
L’Electronique Back-End du Détecteur SciFi
Réunion groupe 18/1/12 Nouvelles et dates.
Physical principle Ultrapurification Single pixel detector Electronics
EDR disk - Agenda Introduction
Acquisition des données
IGTMD réunion du 4 Mai 2007 CC IN2P3 Lyon
1 S Transmission Methods in Telecommunication Systems (4 cr) Transmission Channels.
Réunion service Instrumentation Activités CMS-Traces
La comptine des mois.
TPC Introduction D. Attié, M. Chefdeville*, P. Colas, S. Turnbull, M. Titov (DAPNIA/SPP) X. Coppolani, C. Coquelet, E. Delagnes, E. Ferrer-Ribas, A. Giganon,
Réunion ILC-France lundi 13 juin 2005
ABAQUS I Summary Program Capability Components of an ABAQUS Model Elements, Materials and Procedures Modules (analysis, pre and post processing) Input.
Le détecteur ATLAS Nicolas Massol.
Quantum Computer A New Era of Future Computing Ahmed WAFDI ??????
COMMENT PRÉPARER UN GÂTEAU MICHELIN A*
Reconstruction of HR1 events taken in test beam
CRG TM for YETS November 6th 2017.
Scenario d’intégration du pixel alpin
Projets en Physique des Particules en 2010
INVERTER LOAD SPEED CONTROLLER Power demand Speed reference ENGINE 230/400V 50Hz/60Hz PMGPMG 1 f = Hz Speed =var Island Operation of the Adjustable.
Blaise Pascal Father of Modern Calculators Pascal’s works in Mathimatics Pascal’s works in Physics Pascal’s works in Philosophy.
Integrated Gasification Combined Cycle Plant By Abhijit Kumar Prasad Submitted to Dr. B.Paul Assistant Professor MNNIT Allahabad.
“Confidential –Internal Halliburton Use Only. © 2004 Halliburton. All Rights Reserved.” Stimulation Techniques Fracturing Fluids Proppants.
R&D SLHC-CPPM 28 juin 2006 A.Rozanov
Connaissez-vous la France ?
 were generally much smaller in size than the 2nd and 1st generation computers. This is because these newer computers made us of integrated circuits.
BRMS Implementation Status Update Template designed by 18-July-2015.
IRFU /DEDIP Eric DELAGNES 22/09/2017 Minos Clas12 CTA
University : Ammar Telidji Laghouat Faculty : Technology Department : Electronics 3rd year Telecommunications Professor : S.Benghouini Student: Tadj Souad.
Reunion preparatoire GDI-ILC
FROM THE NEAR FIELD OF NANO- ANTENNAS TO THE FAR FIELD OF METASURFACES Thesis Supervisor: Dr. Yannick De Wilde Co-supervisor: Dr. Patrick Bouchon.
Transcription de la présentation:

CSTS/SPP sur les futurs collisionneurs: ILC Paul Colas

Historique 1981 Proposition par B. Richter 1991 1er workshop à Sarisälka. 1996-1997 Conceptual Design Report TESLA 2001 TESLA+XFEL 2003 : 1700 scientifiques signent pour l’ILC 2004 Beijing Technical Review Committee : recommande la solution ‘froide’ supraconductrice TESLA 2005 Création du Global Design Effort (dir.: B. Barish) 2009 : IDAG sélectionne ILD et SiD 2012: Linear Collider Collaboration (machine et détecteurs) Dir: L. Evans – Proposition japonaise

F. Le Diberder M. Titov O. Napoly

Evolution rapide de la situation politique en faveur de l’ILC (2ème priorité pour la stratégie européenne: e+e- upgradable à haute énergie, proposition japonaise, recommandation P5) Bon positionnement de Saclay et de la France dans les R&D et dans les structures Bon positionnement de Saclay sur le XFEL et sur les techno SRF

Il ne faut pas disperser nos efforts Evolution rapide de la situation politique en faveur de l’ILC (2ème priorité pour la stratégie européenne: e+e- upgradable à haute énergie, proposition japonaise, recommandation P5) Bon positionnement de Saclay et de la France dans les R&D et dans les structures Bon positionnement de Saclay sur le XFEL et sur les techno SRF Il ne faut pas disperser nos efforts

ILC Saclay M. Besançon, P. Colas, S. Ganjour, Ch. Royon, M. Titov au SPP (et Pierre Lutz, retraité) Etudiants: W. Wang (soutenance juin 2013, R&D TPC) A. Chaus (soutenance septembre 2014, TPC pixels et matière noire) D.S. Bhattacharya (soutenance janvier 2016, R&D TPC et couplages du Higgs) D. Attié (chef de projet, SEDI) et I. Giomataris, D. Calvet, I. Mandjavidze, A. Le Coguie, X. Coppolani (SEDI),… Avis d’experts E. Delagnes, P. Baron,…

ILC Saclay R&D TPC: collaboration LC-TPC. Micromegas avec revêtement résistif-capacitif. Reprise MAPS? (actuellement dans ALICE avec AIDA) Animation scientifique, étude du physics case LC days Nov. 2013 Thèses 4 réunions du Club Physics case (matière noire, couplages du Higgs)

2002-2005 : feasibility study, 1000 channel TPC in 2T at Saclay 2005-2007: beam tests at KEK, with and without resistive foil 2008-2011: Large Prototype, 1 module at a time at the center 2012-2013: 6 and 7 modules covering the TPC.

February 2014: 2-phase CO2 cooling (see D February 2014: 2-phase CO2 cooling (see D. Attié’s talk) Improved pad connection Improved zero suppression Module size: 22 cm × 17 cm 24 rows × 72 columns Readout: 1726 Pads Pad size: ~3 mm × 7 mm

Intégration de l’électronique Protection enlevées Chips ‘wire-bonded’, sans packaging Nouveau backend 0.25 X0, 3 connections (HV, LV, Signal)

Events in the Large Prototype

Distortions from the Large Prototype

A Possible Schedule of ILC in Japan As presented in the 2013 ILD meeting in Cracow 26/05/2014 Final Design of ILD TPC

26/05/2014 Final Design of ILD TPC

300 W compressor purchased by KEK at Nikhef 2-phase CO2 cooling Principle : CO2 has a much lower viscosity and a much larger latent heat than all usual refrigerants. The two phases (liquid and gas) can co-exist a room temperature (10-20°C at P=45-57 bar). Very small pipes suffice and hold high pressure with low charge loss. Results from a test at Nikhef 300 W compressor purchased by KEK at Nikhef 26/05/2014 Final Design of ILD TPC

Final Design of ILD TPC 26/05/2014

Tests with 1 module were performed at Nikhef in December 2013, and tests with 7 modules at DESY in February 2014 2-phase CO2 cooling 26/05/2014 Final Design of ILD TPC

Analysis and software ‘Software week’ in Saclay, where we work on the track reconstruction and analysis. (Kalman filter in multi-module configuration)

Distortions from the Large Prototype

Distortions from the Large Prototype Inhomogeneity of the Electric field near the edges of the modules induces distortions (even at B=0) Also induces ExB effects Changes in E also changes the drift velocity Add up to mechanical misalignment Detailed module edge layout

Distortions from the Large Prototype Inhomogeneity of the Electric field near the edges of the modules induces distortions (even at B=0) Also induces ExB effects Changes in E also changes the drift velocity Add up to mechanical misalignment Calculations by S. Mukhopadhyay

Longer term Prepare for the technology choice in 2-3 years (Micromegas / double GEM / triple GEM…) Simulations for the case: 2-track separation, pad size optimization, effect of resistive foil Complement ILD design Continue R&D toward other resistive coatings, make a larger prototype with smaller pads (but with which electronics?) prepare for an ion backflow distortion test (UV lamp with nominal time structure) Work on ILD TPC electronics design (65 nm?)

SID ou ILD? Il est temps de choisir un concept pour participer au montage des proto-collaborations

Nous demandons Des forces pour des études de physique, des encadrants pour un ou deux postdocs/étudiants Environ 60 k€ par an,voire un peu plus Des missions en croissance avec le groupe