Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016.

Slides:



Advertisements
Présentations similaires
Procédure identification/déconnexion Pour le groupe de travail dédié.
Advertisements

Verification des DEC Comparaison des nombre de câbles dans les DEC et valeurs du Dashboard Vérification dans les DEC de l’existence de doublons Vérification.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL Emmanuel SAID BE-CO 20/11/2015 General De-cabling Project Meeting #5.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.
EHN1 Extension Bilan période 4 au 15 juillet... et future période 15 aout au 6 sept. ! 59th EAs integration meeting - EHN1 extension / 17th EHN1 detector.
Cas des arrêts techniques LHC-TS coordination meeting APPLICATION DES REGLES «Travaux et Prestations de services» Olivier Prouteau – Unité HSE – EDMS xxxxxxx.
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
Dépose tuyauterie Obsolète Booster Ligne de transfert et injection IMPACT – Travail effectué du 22 au 27 janv 16 (Jacpat) -120m de DN50 en Inox déposé.
Traffic Sign Recognition Jacob Carlson Sean St. Onge Advisor: Dr. Thomas L. Stewart.
Update on Edge BI pricing January ©2011 SAP AG. All rights reserved.2 Confidential What you told us about the new Edge BI pricing Full Web Intelligence.
SPS préparation travaux LS2
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 2nd June 2016.
Past Tense (Past Perfect)
Cours sur l'organisation et la mise en œuvre d'une infrastructure réglementaire nationale chargé du contrôle des sources de rayonnements.
Business Case Title Company name
De-cabling strategy during YETS August 2017
Extension EHN1 Travaux Câblage (EL-FC) Guillaume Gros.
Frédéric Galleazzi EN/ACE/INT
Reference Document Document de référence
Injectors de-cabling Project General information June 2017 INDICO:
[Insérez le nom du programme]
Activités LHC pour BE/ICS Systèmes d’Alarmes YETS et LS2
French is spoken by approximately 120 million people in Africa.
Frédéric Galleazzi EN/ACE/INT
Djibouti is the only francophone country on the eastern coast of Africa. The capital of Djibouti is Djibouti.
Détermination des coûts et établissement du budget pour la mise en oeuvre des activités conjointes de lutte contre la tuberculose et le VIH Document No.
EHN1_NP : Campagnes de câblage et planning
Cas des arrêts techniques TS coordination meeting
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
The country now known as Democratic Republic of Congo was formerly the personal property of the King of Belgium.
The nation now known as The Democratic Republic of Congo was at one time the personal property of the King of Belgium.
Mesures et tests de sonorisation
EHN1 – EN/EL Avancement T. OCTAVE 24/03/16.
Activités EN/EL-FC EYETS16-17
Cas des arrêts techniques TS coordination meeting
Contrat S133 LS1 : mars 2013-septembre janvier 2013
Reference Document Document de référence
French is spoken by approximately 120 million people in Africa.
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
Djibouti is the only francophone country on the eastern coast of Africa. The capital of Djibouti is Djibouti.
AUG Risk Analysis.
Preparation of the EIROFORUM presentation Lisbon
« Chargés de consignation » & projet de-câblage
Titres visés en BT : BR – B1(V) - B2(V) - BC
Séminaire du Conseil Académique
Résumé CB WLCG du 3 février 2005
CRG TM for YETS November 6th 2017.
YETS Systèmes d’alarmes SPS
Djimon Hounsou, who has twice been nominated for Academy Awards® for best supporting actor, was born in Benin.
EYETS Détection Incendie et Evacuation PSR - TT2 -Booster - Linac2
YETS / LS2 Systèmes d’alarmes LHC PSB – PS – TT2 – LINAC 2-3
1 ISO/TC 176/SC 2/N1219 ISO 9001:2015 Revision overview - General users July 2014.
High-Availability Linux Services And Newtork Administration Bourbita Mahdi 2016.
EDHEC OPEN INNOVATION - Season 8 - Company LOGO Business Case Title.
12 Safe Maintenance Rules
Réunion plénière Groupe régional de coordination sur l’ODD4-Education 2030 en Afrique de l’Ouest et du Centre (GRC4-AOC) Mardi 10 octobre 2017, 9h-13h15.
LITHIUM BATTERIES.
Travail de cloche Quelle est votre station de ski préférée?
One important document and tool for SUPERVISORS. Plenty of sanctions.
Safety Talk EN DSO & EROS
Le Passé Composé (Perfect Tense)
Safety Talk EN DSO & EROS
AP. Bernardes /SSO injecteurs, K. Boonroy/HSE-OHS, G. Cumer/EN-ACE, H
Safety aspects for activities
Safety aspects for activities
EDHEC OPEN INNOVATION - Season 9 - Company LOGO Business Case Title.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016 G. Cumer, EN/ACE/OSS

Decabling Project Overview Scope of the project Organization Master schedule Dashboard Nature des travaux (sécurité électrique) EYETS 2016-2017 : Booster (de cabling) PS and TT2 (identification phase)

Decabling Project Overview Project scope * The De-cabling project scope is to identify and remove obsolete cables within the PSBooster, SPS and PS, until the end of LS2. The activities will be organized according to the following priorities and goals: First priority PSBOOSTER; Second priority SPS; Third priority PS. *IEFC 19-06-2015

Decabling Project Overview Prioritization * The identification of the obsolete cables in the PS Booster is the top priority, because of the needs for new cables for the LIU project, with the following deadlines: Labelling and disconnection during YETS 2015-2016; Removal of obsolete cables during EYETS 2016-2017 and if necessary YETS 2017- 2018. For SPS5 and SPS3: Identify respectively 50% and 40% of existing cables for removal, because of the congestion of the cable trays and the need to pull new cables. Moreover, the project team will have to closely follow the needs of the LIU project taking into account the availability of resources. For the PS, the project team will identify the obsolete cables. The deadline is: during 2016, the project team will propose possible identification and removal slots, taking into account the availability of resources and further needs of LIU project. *IEFC 19-06-2015

Decabling Project Overview Master schedule If necessary If necessary PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016

Decabling Project Overview Organization of the project A Core team project including members of EN/EL - EN/ACE and HSE/RP Project link persons from 14 groups for identification and disconnection phases : BE/BI – BE/CO – BE/RF – BE/ICS – TE/ABT – TE/EPC – TE/MSC – TE/VSC – TE/MPE – HSE/RP – IT/CS – EN/CV – EN/EL – EN/STI EN/EL is the main budget owner (for removal phases) The identification phases are funded by the groups concerned. EN/ACE has a slight budget for the cables without owner.

Decabling Project Overview Organization of the project, documentation Project Management Plan : EDMS 1686408 Project documentation : EDMS CERN-0000167857 Indico : https://indico.cern.ch/category/6591/ Dedicated share point : https://espace.cern.ch/Injector-De-Cabling-Project/SitePages/Home.aspx

Decabling Project Overview Dashboard au 22 sept 2016 Injector de-cabling project _Dashboard Nombre de cables à déposer (hors cables puissances AC et DC) installés nb de cables à deposer hors projet LIU (1) estimation 2015 DEC établies cables orphelins PS BOOSTER ~ 12 000 ~ 3000 2860 SPS5 ~6 500 ~ 3250 3209 SPS3 ~ 8 000 ~3200 3014 PS CENTRE ANNEAU ~22 000   318 TT2 ~3 000 (245) * PS ring - 354 - 150 - 151… ~47 000 (1465) * * Identification during LS1 , It does not include cables of the Intercom System and cables for Access Reminder: cables which are in use now and are targeted to be replaced for future projects are not considered today as obsolete cables. Les 22 000 cables du PS centre anneau seront analyses par les groups proprietaires de Juillet a Novembre 2016

Decabling Project Overview Nature des travaux (sécurité électrique) En application de la norme UTE 18-510, le core team du projet de decâblage des Injecteurs a conduit une analyse de risque sur la nature des travaux et des interventions pour ce projet. En application des recommandations du DSO/EN, du Safety Support Officer du LS2 et des Operational Safety Support Officers, les travaux et les interventions effectués dans le cadre de ce projet ont été classifiés en tant que Travaux de nature électrique.

Decabling Project Overview Nature des travaux (sécurité électrique) En conséquence, les travaux et les interventions liés au projet devront être réalisées par du personnel électricien dûment habilité : Les travaux liés à l’identification et la déconnexion des câbles obsolètes devront être réalisés par des chargés d’intervention des groupes concernés, avec une habilitation BR ; Les travaux de dépose et enlèvement des câbles obsolètes devront être réalisés par des opérateurs électriciens (contractant EN/EL) avec une habilitation H1/B1, sous la responsabilité d’un chargé de travaux (contractant EN/EL) habilité H2/B2 ; Le chargé de travaux devra avoir reçu et signé des attestations de consignation pour travaux de la part des Chargés de Consignation des groupes concernés (ayant des équipements installés).

Decabling Project Overview Nature des travaux (sécurité électrique) Habilitation des intervenants pour la phase d'identification et de déconnexion des câbles Obsolètes Les travaux liés à l’identification et la déconnexion des câbles obsolètes devront être réalisés par des chargés d’intervention des groupes concernés, avec une habilitation BR ; Groupes concernés : BE/BI – BE/CO – BE/RF – BE/ICS – TE/ABT – TE/EPC – TE/MSC – TE/VSC – TE/MPE – HSE/RP – IT/CS – EN/CV – EN/EL – EN/STI PS centre anneau Pré VIC realisee 14 septembre 2016 pendant le dernier TS

Decabling Project Overview Nature des travaux (sécurité électrique) Habilitation des intervenants pour la phase de dépose des câbles Obsolètes Les travaux de dépose et enlèvement des câbles obsolètes devront être réalisés par des opérateurs électriciens (contractant EN/EL) avec une habilitation H1/B1, sous la responsabilité d’un chargé de travaux (contractant EN/EL) habilité H2/B2 ; Le chargé de travaux (contractant EN/EL) devra avoir reçu et signé des attestations de consignation pour travaux de la part des Chargés de Consignation des groupes concernés (ayant des équipements installés de tension supérieure a 48V). Les chargés de consignation doivent être habilités BC pour la basse tension et HC si des installations en haute tension Groupes concernés : BE/BI – BE/CO – BE/RF – BE/ICS – TE/ABT – TE/EPC – TE/MSC – TE/VSC – TE/MPE – HSE/RP – IT/CS – EN/CV – EN/EL – EN/STI SPS 5 left et Booster Les groupes n’ayant pas d’équipements ou de cables avec une tension >48V, l’attesteront lors de la VIC de début de EYETS (pas de chargé de consignation)

Decabling Project Overview Classification des travaux Les travaux et les interventions effectués dans le cadre de ce projet ont été classifiés en tant que Travaux de nature électrique.

Decabling Project Overview Booster/SPS5 EYETS 2016 : contraintes et coactivités Systèmes devant rester sous tension, opérationnels pour la sécurité des personnes Eclairage de sécurité Désenfumage Contrôle d’accès Détection incendie AUG Alarmes de niveau 3 Alarmes évacuation RAMSES TETRA

Decabling Project Overview Booster EYETS 2016 : contraintes et coactivités Systèmes devant rester sous tension, opérationnels pour les travaux du EYETS Buffer zone Ascenseur Pont roulant Eclairage Normal Star-point Bâtiment 37 Coffrets de prises dans la machine

Decabling Project Overview Booster EYETS 2016 : contraintes et coactivités Structures et faux-planchers VIC au tout debut du EYETS avec tous les groupes pour la phase de consignation 5 days at the start of EYETS dedicated to corrective interventions on the “Faux Planchers”. Un dispositif mecanique de renforcement des faux planchers a été étudié par EN/ACE et validé par HSE. ~300 pieds seront ainsi équipés pour assurer de facon perenne la stabilité des fx planchers du Booster et du b.368 (budget consolidation) Validé par HSE

Decabling Project Overview _ PS BOOSTER LS2 COMMITTEE – 3rd meeting, 27 May 2016

Decabling Project Overview PS centre anneau b.359-368-353 LS2 COMMITTEE – 3rd meeting, 27 May 2016