« Chargés de consignation » & projet de-câblage

Slides:



Advertisements
Présentations similaires
Year 8 French - Le Petit Déjeuner WALT To talk about what you eat and drink for breakfast WILF To describe in detail what you eat & drink (level 4) To.
Advertisements

10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
Civil engineering for LIU – PS
Lycée dAltitude Briançon Projet « Horloges dAltitude » D : Agencements F.
Brief overview on Cabling and Optical Fibre activities With particular accent on Optical Fibre working method D. Ricci, on behalf of EN-EL-CF section EDMS.
Risques specifiques electricite
EN LS1 CV/ACCESS/Cabling Work co-activities February 5th, 2013 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CV/ACCESS/Cabling Work co-activities EDMS
TDC2/TCC2 Réunion de chantier In SharePoint: workspace/tcc2wg/LS1%20worksite%20meeting/
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
Procédure identification/déconnexion Pour le groupe de travail dédié.
Localisation des cables dans le booster. Objectifs Extraire depuis les DEC un fichier qui reprend toutes les données qui permettent de renseigner différentes.
Verification des DEC Comparaison des nombre de câbles dans les DEC et valeurs du Dashboard Vérification dans les DEC de l’existence de doublons Vérification.
SPS Cables identification BA3 / BA5 Erwan Harrouch.
Diffusion des Notes de coupure au CERN Barbara Brugger – 9 octobre 2015.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL Emmanuel SAID BE-CO 20/11/2015 General De-cabling Project Meeting #5.
TT2 consolidation Partie câblage DC P. Lelong / EN-EL-FC.
Procédure identification/déconnexion Pour le groupe de travail dédié.
Point de situation BE-CO sur l'identification des câbles les tests Emmanuel SAID Herve Cornet.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.
EN TSO Workshop nd June 2016; 14th June 2016; 30th June 2016 Purpose: Share a common vision amongst the EN safety actors Involve the TSOs in defining.
EHN1 – EN/EL T. OCTAVE 01/09/16. SOMMAIRE BESOINS DES UTILISATEURS MODIFICATION INSTALLATION DE CHANTIER ECLAIRAGE + PRISES TABLEAU ELECTRIQUE SOUS STATION.
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
SPS préparation travaux LS2
Questionnaire B2L-B2VL-BCL
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 2nd June 2016.
ALERTE ACCIDENT ELECTRIQUE
EYETS Activités Systèmes d’Alarmes LHC
De-cabling strategy during YETS August 2017
Extension EHN1 Travaux Câblage (EL-FC) Guillaume Gros.
Frédéric Galleazzi EN/ACE/INT
Frédéric Galleazzi EN/ACE/INT
EN TSO Workshop nd June 2016; 14th June 2016; 30th June 2016
Calendrier scolaire Premier/dernier jour
EHN1 – EN/EL T. OCTAVE 25/08/16.
Injectors de-cabling Project General information June 2017 INDICO:
Activités LHC pour BE/ICS Systèmes d’Alarmes YETS et LS2
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016.
EHN1 Extension Safety Organization Scheme
Comment améliorer la pratique des opérateurs sur le terrain
LIU Intégration «Feuille de route» _A.Kosmicki_edms#
EHN1_NP : Campagnes de câblage et planning
Activités EN/EL-FC EYETS16-17
71th EAs integration and coordination meeting - EHN1 extension
EHN1 – EN/EL Avancement T. OCTAVE 24/03/16.
SPS EYETS 2016/2017 Planning meeting (No.12) 25/01/17
Activités EN/EL-FC EYETS16-17
70th EAs integration and coordination meeting - EHN1 extension
1 Prévision d’une série chronologique par lissage exponentiel Michel Tenenhaus.
67th EAs integration and coordination meeting - EHN1 extension
TABLEAU DES COMBINAISONS ALPHANUMÉRIQUES DES SYMBOLES D’HABILITATION RETENUES DANS LA PUBLICATION UTE C VERSION 2011, POUR CHAQUE NIVEAU D’HABILITATION.
EYETS Activités Systèmes d’Alarmes LHC
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
TE-EPC internal review of the ELENA project
SPS YETS 2015/2016 Planning meeting (No.11) 13/01/16
LIU 355_ _A.Kosmicki_edms#
Thème 06 : Addition de nombres relatifs Séance 2
Shut-down
SPS YETS 2015/2016 Planning meeting (No.12) 20/01/16
ACTIVITES EN/EL-CF YETS15/16
EYETS Détection Incendie et Evacuation PSR - TT2 -Booster - Linac2
72th EAs integration and coordination meeting - EHN1 extension
LA REGLEMENTATION ELECTRIQUE A L’ONEE-BE Références de la réglementation à l’one CDP pour manœuvres et travaux électriques hors tension - 1 ère édition.
AP. Bernardes /SSO injecteurs, K. Boonroy/HSE-OHS, G. Cumer/EN-ACE, H
Safety aspects for activities
Safety aspects for activities
Safety aspects for activities
Safety aspects for activities
Transcription de la présentation:

« Chargés de consignation » & projet de-câblage LS2C, 24th June 2016 Marzia Bernardini On behalf of Gerard Cumer, de-cabling project leader

Marzia Bernardini, LS2C 24th June 2016 Besoin d’identifier les chargés de consignations !!! LS2C on 27th May 2016 Marzia Bernardini, LS2C 24th June 2016

Link persons projet de-cablage PMP - EDMS 1686408   PS BOOSTER PS SPS Group Group leader Link person BE/BI R. Jones J. Tassan-Viol R. Ruffieux – F. Domingues Sousa P. Lavanchy, T. Bogey S. Thoulet BE/CO E. Hatziangeli E. Said (B. Ninet) M. Bjork (H. Cornet) BE/RF E. Jensen M. Haase (High Level) A.J. Findlay (Low Level) M. Haase V.D. Desquiens C. Renaud G. Cipolla HSE/RP D. Forkel-Wirth D. Perrin (A. Day) EN/CV M. Nonis H. Sabri V. Koutcheroff EN/EL N. Bellegarde S. Delarue R. Necca M. Szewczyk EN/STI S. Gilardoni J. Lendaro BE/ICS P. Sollander J-F. Juget (D. Chapuis) J-F.Juget (D. Vaxelaire) IT/CS T. Cass L. Borakiewicz M. Da Costa TE/ABT B. Goddard A. Antoine TE/EPC J-P. Burnet S. Pittet Y. Gaillard C. Mutin TE/MSC L. Bottura A. Newborough D. Bodart J. Bauche TE/VSC P. Chiggiato J. De La Gama Serrano TE/MPE A. Siemko R. Mompo Marzia Bernardini, LS2C 24th June 2016

Decabling Project Overview Procédure de consignation phase de dépose des cables Chargé de travaux EN-EL (H2/B2) Pilote du groupe resp. des travaux Chargé de consignation HC/BC X Exécutants électriciens (H1/B1) Y Z W Attestations de consignations pour travaux (d’ordre electrique) Marzia Bernardini, LS2C 24th June 2016

  PS BOOSTER PS SPS Group Group leader Chargé de consignation BE/BI R. Jones BE/CO E. Hatziangeli BE/RF E. Jensen HSE/RP D. Forkel-Wirth EN/CV M. Nonis EN/EL N. Bellegarde EN/STI S. Gilardoni BE/ICS P. Sollander IT/CS T. Cass TE/ABT B. Goddard TE/EPC J-P. Burnet TE/MSC L. Bottura TE/VSC P. Chiggiato TE/MPE A. Siemko ? ? ? Deadline Fin Aout 2016  envoyer les noms a G. Cumer et A. Berjillos Marzia Bernardini, LS2C 24th June 2016