North area S. Girod, EATM, 22-03-2016.

Slides:



Advertisements
Présentations similaires
Objective: WILF:by the end of the lesson is for all of you to be able to sing the song with actions. This is because:if you sing something you are 10 times.
Advertisements

Dans ma région il y a… Le but: In this lesson you will learn how to say what facilities are in your area.
Ecoute bien! Test your listening skills! On each slide you will see a sound icon. Click on this to hear a French number. Then click on the word for the.
French 3 & 4 October 17, When I was teaching in France, most of my students had all of their classes with the same group of people. How would this.
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
EHN1 – visiting point at the OD2013 Ilias Efthymiopoulos, Adrian Fabich, MEF-LE ENMB, 9 th September 2013.
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 14/04/2011 Activities TS week 13 Production for test area On-going.
Jeudi le 7 novembre. F 3 DUE: Virtual tour in LMS by 7:30 for the 70! DUE: Flashcards also for the 70 today (50 Friday) 1. Poem practice Le dormeur du.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
Les pronoms objets indirects.  Peux-tu identifier les règles des ‘pronoms objets indirects’ en regardant les exemples suivants?
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
Questions: -W-W-W-What are their main tasks? - What skills should laboratory technicians have? (quote at least 6) -W-W-W-Why is it important for a lab.
Vendredi le 5 septembre 2014
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Year 10. Bon appetit unit. Introducing ‘en’. ‘en’ – ‘some of it’ or ‘some of them’ ‘En’ is a small but important word in French that is commonly used.
Notes le octobre ÊTRE (to be) je suis (I am)nous sommes (we are) tu es(you are)vous êtes (you (plural) are) il/elle est (he/she is)ils/elles sont.
Chèvre, cheval, mouche, chauve-souris
Les pronoms démonstratifs
Unité 5 Pronoms de Complement Direct Le—la—l’—les.
YETS preparation S. Girod, EN-MEF EATM
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Verb  a word that show action or a state of being.  Examples: run, jump, play, talk, listen  In English, we just the verb “to be” to describe how people.
EN-CV Progress EHN1 Extension Project
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
French 1 Chapter 2 Grammar 2
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
Français 10/12/15 Ouvrez vos livres á la page 40. Faites #6. Two flies are on a porch: which one is the actor? Se dépêcher – to hurry. Dépêche – toi. Hurry.
LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
PDMS casting station The casting station consist of a spin coater, a dessicator and a hot plate. All instruments are installed in a fume hood. The main.
Nouvelles d’ATF2 au Japon Suite à une réunion ATF2 qui s’est tenue la semaine dernière au Japon (8 heures de décalage horaire!) A.Jeremie-17/01/12- service.
NA YETS: schedule week by week S. Evrard.
O. Napoly, Réunion P2I8 juin Grande Salle Blanche de l’Irfu à Saclay O. Napoly, CEA-Saclay, Irfu/SACM.
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
The imparfait can be translated several ways into English.
Status ATF2 Andrea JEREMIE. 4 ATF2 ATF2 extraction line 4.
PIPE SUPPORTS 1 Pipe supports inside the compression station and pumping stations AUGUST 2014.
SEW Maintenance Series ReplacingaStator SEW-EURODRIVE—Driving the world.
Travaux alimentation électrique SLX8 (3852)
Les robots de la maison Je mets la table.
Update on shielding for the ALFA detectors
K. Foraz on behalf of OSS members
L’objectif To use prepositions to describe my home To use comparatives
Les pronoms démonstratifs
Interventions BE-BI LS2
Biggest Diamond Mining Unit...a true wonder!!
AUG Risk Analysis.
Notes le 28 octobre ÊTRE (to be) je suis (I am) nous sommes (we are)
Frédéric Galleazzi EN/MEF/INT
CRG TM for YETS November 6th 2017.
SPS YETS 2015/2016 Planning meeting (No.12) 20/01/16
P&ID SYMBOLS. P&IDs Piping and Instrumentation Diagrams or simply P&IDs are the “schematics” used in the field of instrumentation and control (Automation)
nTOF air and concrete activation
Budget Meeting Saturday Oct 29, 2016 à 1:30PM at the CLUB HOUSE
Budget Meeting Saturday Oct 29, 2016 à 1:30PM at the CLUB HOUSE
Budget Meeting Saturday Oct 29, 2016 à 1:30PM at the CLUB HOUSE
Test your listening skills!
Smart antennas (also known as adaptive array antennas, digital antenna arrays, multiple antennas and, recently, MIMO) are antenna arrays with smart signal.
Bienvenue Au monde des Pronoms.
Vulnerability Analysis by : Wail Belhouchet Dr Djouad Tarek 1.
5 Whys A technique for getting past first impressions and finding the root cause of a problem.
Safety Talk EN DSO & EROS
Réflexifs.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

North area S. Girod, EATM, 22-03-2016

Calage des aimants zone nord Calages en cours: TCC2: 7 aimants TT81 - TT82 - EHN1: 11 aimants TT83: 2 aimants De nombreux elements faisceaux a deplacer, remettre en place, aligner, reconnecter…. Details: https://edms.cern.ch/document/1584695/ S. Girod, 22/03/2016 2

TCC2 - All XTAX are out of chains for maintenance and tests 2 collimators replaced: XCSH 022.068 & XCSV 041.047 (Abou) BBS 1245 & vacuum chamber removed (upstream T6) Water leaks on magnets are being repaired S. Girod, 22/03/2016 3 3

TCC2 Work notification with new matrix request to be done Replacement of XTAX in interlock chains: H2-H4 : TAX 021023 TAX 1001 TAX 021025 TAX 1002 (not used) TAX 022023 TAX 1003 (not used) TAX 022025 TAX 1004 H6-H8 : TAX 042018 TAX 1005 TAX 042020 TAX 1006 (not used) P0: TAX 043018 P4 TAX 1007 TAX043020 P4 TAX1008 TAX 062052 P6 TAX 1009 TAX062054 P6 TAX 1010 M2: TAX 061052 TAX 1011 (not used) TAX 061054 TAX 1012 Work notification with new matrix request to be done S. Girod, 22/03/2016 4 4

H4 Setup pour NA63 zone PPE134: 2 MBPL gap 140mm + vacuum Ø273 S. Girod, 22/03/2016 5 5

H6 XFFV.041.451 et XDWC 488 à réinstaller et aligner Chambre à vide à déposer zone 146 en aval de XCET505 pour utilisateur S. Girod, 22/03/2016 6 6

détails: https://edms.cern.ch/document/1572394/ H8 Dépose faisceau H8 VLE terminé Installation / reconfiguration du faisceau zone PPE148 en cours détails: https://edms.cern.ch/document/1572394/ S. Girod, 22/03/2016 7 7

K12 Target T10 repaired T10 upstream shielding installed Survey on beam line to be done. S. Girod, 22/03/2016 8 8

K12 He Exhaust piping works next 2 weeks Double air wall to be closed big fisc installation / alignment S. Girod, 22/03/2016 9 9