2. The Sahelian dust transect = 3 stations on the main pathway of Saharan and Sahelian dust toward the Atlantic Ocean Banizoumbou, Niger Cinzana, Mali M'Bour, Senegal mm.yr-1 Longitude (°) Latitude (°) (Marticorena et al., 2010) _ The stations are operational since 2006
Total and wet deposition mass flux 2. The Sahelian dust transect DEPOSITION FLUX MEASUREMENTS Total deposition collector (Inverted freesbee + aerodynamic disc + marbles) Wet deposition automatic collector (MTX) Collection with water Decantation Drying Weighting Total and wet deposition mass flux (insoluble)
4. Results : average annual fluxes Cinzana 119 g.m-2.yr-1 M’Bour 92 g.m-2.yr-1 Banizoumbou 133 g.m-2.yr-1 Ghana (dry season) 42 g.m-2.yr-1 Lybia 129 g.m-2.yr-1 Spain 5.3 g.m-2.yr-1 Corsica 11.2 g.m-2.yr-1 Turkey 13 g.m-2.yr-1 Kriti 11-23 g.m-2.yr-1 _ Our measurements (average 2006-2012) are consistent with data from the litterature _ Deposition fluxes decrease from the sources to the transport regions in all directions
3. Monthly PM10 concentrations The concentrations are extremely high (>100 µg.m-3 in monthly means) They exhibit a typical seasonal cycle (max in June-July min in Sep-Oct) An east-to west gradient (Niger > Mali > Senegal) Les concentrations sont monitorées à 5 min depuis 2006; Elles sont très fortes compérées à nos standards; les normes françaises et EU sont dépassées au moins 75% du temps, elles sont respectées uniquement en Juillet Auot et Septembre. Le cycle saisonner est marqué par un max au printemps (mars-avril), liée au transport d’aérosols sahariens en basse couche, mais aussi de fortes valeurs au début de saison des pluie à Bani et Cinzana en raison d’ émissions locales par les systèmes convectifs de méso-échelle.
4. Results : Seasonal cycle On a des cycles saisonniers déphasés des concentrations, pluies et dépôt. Le max de dépôt est intercalé entre celui des concentrations et des pluies : les forts dépots sont enregistrées quand les concentrations sont encore forte et que les pluies commence. Au max de pluie, les concentrations sont trop basses pour faire de gros dépôts. PM10 concentrations are maximum in spring (March) Précipitation are maximum in summer (August) ↔ minimum concentration High concentrations + précipitation ↔ wet deposition maximum in June
4. Results : Seasonal cycle East West Higher [PM10] Lower precipitation : 505 mm -> wet deposition = 52% of total deposition Precipitation 735 mm = 62% of total deposition Lower [PM10] Lower precipitation : 594 mm = 8 % of total deposition Par rapport à Cinzana, on a un cycle comparable à celui de Cinzana, mais avec un% de wet plus faible par il y a moins d’évènement pluvieux; le total reste plus élévé car les concentrations sont plus fortes. Ce cycle n’est pas visible à M’Bour on a a majoritairement du dépôt sec : il pleut quand les concentrations sont faibles et on ‘enregistre pas de passage de MCS avec de fortes émissions locales et des pluies juste derreière.
4. Results : Multiannual pattern Banizoumbou (Niger) Cinzana (Mali) M’Bour (Senegal) The year to year variability is maily due to wet deposition; it results from the phasing between precipitation and concentrations associated with convective activity in Niger and Mali In Senegal, there is not such convective systems producing high dust concentrations and wet deposition fluxes, the variability of deposition is driven by the concentrations Les dépôs totaux sont en noir et les wet en gris . Au Niger et au Mali, ce sont les dépôts humides qui constituent les évènements de dépôts les plus forts; ils diminuent au cours de la saison des pluies car les concentrations (notamment celles liées au émissions locales par les Systèmes Convectifs de méso-échelle, diminue.
PI : S. Basart, Barcelona Supercomputing Center, Spain A contribution to the WP1 (Dust observations for model evaluation) of the Dust-Clim Project funded by the European ERA4CS Joint Call for Transnational Collaborative Research Projects 2016 DustClim Dust Storms Assessment for the development of user-oriented Climate Services in Northern Africa, Middle East and Europe PI : S. Basart, Barcelona Supercomputing Center, Spain Partners : BSC, Spain; AEMET , Spain; LISA, France; CNR-DTA, Italy, FMI, Finland September 2017 – August 2020