13/11/2018 Les activités CTA au sein du service électronique Réunion de service electronique Mardi 22 novembre 2016 Entrez votre nom.

Slides:



Advertisements
Présentations similaires
Copyright © 2010 Systematic Présentation des enjeux Europe et International 1 Jean-Luc Beylat, Vice-Président International Systematic.
Advertisements

DETECTORS EPFL / CERN Visible and invisible light Lumière visible et invisible High energetic: Violet is the highest energetic light our eye can see. UV.
TM.
EUROPEAN ASSOCIATION OF DEVELOPMENT RESEARCH AND TRAINING INSTITUTES ASSOCIATION EUROPÉENNE DES INSTITUTS DE RECHERCHE ET DE FORMATION EN MATIÈRE DE DÉVELOPPEMENT.
Une petite lettre à Père Noël…. A. Blondel, G. Prior, S. Borghi,R.Sandström, E.Gschwendtner, A. Cervera, P. Bene, J.-P. Richeux, S. Gilardoni.
SOLAR ORBITER: Extreme Ultraviolet Imager 12 avril 2005 PNST, IAP.
ANR NECTAr Camera New Electronics for the Cherenkov Telescope Array Conseil de laboratoire 19 décembre 2012 Julie Prast.
SOLAR ORBITER: Visible-Light Imager and Magnetograph 12 avril 2005 PNST, IAP.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
Présentation du nouveau Site Hercules. Plan Nouvelle ergonomie Nouvelle base de données Nouvelle procédure d’inscription Nouveaux outils d’administration.
Journees de prospective LAL/ Seillac 2012
Réunion service électronique 20 juin /20/2013Reunion service électronique, Julie Prast1.
Plan de développement – Démonstrateur Baseline MST project time scale: first camera expected in summer 2015 It means: NECTArCam final demonstrator in 2013.
Jan 2012 Total : 148 personnes + 28 stagiaires LPNHE 1 Laboratoire de Physique Nucléaire et de Hautes Energies CNRS/IN2P3, Univ Pierre et Maric Curie and.
SWA Café – Suivi des engagements pris par la France lors de la RHN de 2014, en consultation avec la Société Civile Céline Gilquin (Agence Française de.
The relationship between the different FEB projects The first MainBoard and its Processing DaughterBoard will be developed for 3-in-1, but keeping the.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
Activités de l’IPNL en préparation pour le prototype Un d é tecteur de 1 m2 é xsite d é j à IHEP produira les 40 GRPC n é cessaires Mais : 1- Il faut les.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
1 Case Study 1: UNIX and LINUX Chapter History of unix 10.2 Overview of unix 10.3 Processes in unix 10.4 Memory management in unix 10.5 Input/output.
Traffic Sign Recognition Jacob Carlson Sean St. Onge Advisor: Dr. Thomas L. Stewart.
DIFFERENTIATION NO ONE CAN COMPEL A STUDENT TO LEARN. (MEIRIEU)
TP4
Réunion carte(s) HVPA+ interface
Cours sur l'organisation et la mise en œuvre d'une infrastructure réglementaire nationale chargé du contrôle des sources de rayonnements.
Cadre intégré de classification de la sécurité alimentaire (IPC)
Physical principle Ultrapurification Single pixel detector Electronics
Le calorimètre électromagnétique de l’expérience PANDA
Dans ma maison il y a… In my house there is…
Collecte de données CAPI
WP5 : Initial design of the glider
La mise en oeuvre du Plan d’Investissement pour l’Europe
The nation now known as The Democratic Republic of Congo was at one time the personal property of the King of Belgium.
Mon enfance Quand tu étais petit, tu étais comment?
AUG Risk Analysis.
Réunion service Instrumentation Activités CMS-Traces
Les Prépositions.
Projet eXtreme DataCloud XDC
Quantum Computer A New Era of Future Computing Ahmed WAFDI ??????
Theory of Relativity Title of report Encercle by Dr. M.Mifdal Realized by ZRAR Mohamed.
Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics.
Québec energy sector Frédéric Tremblay Québec Government Office in Washington September 22, 2016.
Mercredi 15 Novembre Français PreAP-AP
CRG TM for YETS November 6th 2017.
Scenario d’intégration du pixel alpin
About INTEGRA The Integrated community, probation and prison services radicalisation prevention approach strives to improve the transition process between.
Préparation de la pré-revue du 6 et 7 mars
Phase-Locked Loop Design S emiconducto r S imulation L aboratory Phase-locked loops: Building blocks in receivers and other communication electronics Main.
P&ID SYMBOLS. P&IDs Piping and Instrumentation Diagrams or simply P&IDs are the “schematics” used in the field of instrumentation and control (Automation)
1 ISO/TC 176/SC 2/N1219 ISO 9001:2015 Revision overview - General users July 2014.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 1-1 Chapter 1 Introduction and Data Collection Basic Business Statistics 10 th Edition.
September ’18www.ikaros-solar.eu1 ITH & EL imaging for PV May 2018 This presentation and the contents thereof are strictly confidential and may only be.
High-Availability Linux Services And Newtork Administration Bourbita Mahdi 2016.
La grille EGEE dans le monde et à Orsay
Camera Slow Control for LST and Nectar cameras
Technologies SoPC (System On Programmable Chip)
The NEB and Public Confidence: The Need for Informed Reform
Au LAPP David Sanchez Réunion CTA 1/12/2014.
REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE MINISTERE DE L ’ ENSEIGNEMENT SUPERIEUR ET DE LA RECHERCHE SCIENTIFIQUE Universit é Mohamed Kider Biskra.
Definition Division of labour (or specialisation) takes place when a worker specialises in producing a good or a part of a good.
Shop Stewards Pour parler correctement des Délégués de Service au sein du Syndicat du BIT, il faut d’abord se pencher sur le texte de définition dans les.
Vulnerability Analysis by : Wail Belhouchet Dr Djouad Tarek 1.
QA/QC implementation Is the report the final issue of this task ?
POWERPOINT PRESENTATION FOR INTRODUCTION TO THE USE OF SPSS SOFTWARE FOR STATISTICAL ANALISYS BY AMINOU Faozyath UIL/PG2018/1866 JANUARY 2019.
C021TV-I1-S4.
IRFU /DEDIP Eric DELAGNES 22/09/2017 Minos Clas12 CTA
FROM THE NEAR FIELD OF NANO- ANTENNAS TO THE FAR FIELD OF METASURFACES Thesis Supervisor: Dr. Yannick De Wilde Co-supervisor: Dr. Patrick Bouchon.
Reporting on national biodiversity strategies,
INS Tunisia, Towards a fully SDMX compliant Information system
Transcription de la présentation:

13/11/2018 Les activités CTA au sein du service électronique Réunion de service electronique Mardi 22 novembre 2016 Entrez votre nom

Plan de la présentation Qu’est ce que CTA ? Qu’est que NectarCAM et LSTCAM Responsabilités du service electronique du LAPP 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

CTA = Cherenkov Telescope Array 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (J. Knödlseder) CTA consortium CTA Consortium members status 1281 members 413 FTE CTA Consortium members come from 31 countries 91 parties 194 institutes The Cherenkov Telescope Array (J. Knödlseder)

The Cherenkov Telescope Array (Julie Prast) CTA sites 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (Julie Prast) The CTA Observatory SST (4m) MST (12m) LST (23m) South North 1 km Characteristics 2 sites (north & south) 3 telescope size classes About 120 telescopes in total 3 km 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Detecting VHE gamma rays 2° 10 km Area ~ 50000 m2 Opening angle: 1-2 degrees 100 blue photons m-2 within few ns at 1 TeV 200 – 300 m 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (Julie Prast) Large size telescopes Science drivers Lowest energies (< 200 GeV) Transient phenomena DM, AGN, GRB, pulsars Characteristics Parabolic design 23 m diameter 370 m2 effective mirror area 28 m focal length 1.5 m mirror facets 4.5° field of view 0.11° PMT pixels active mirror control Carbon-fibre arch structure (fast repointing) Array layout South site: 4 LST North site: 4 LST Status Some elements prototyped First full telescope under construction in La Palma 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Medium size telescopes Science drivers Mid energies (100 GeV – 10 TeV) DM, AGN, SNR, PWN, binaries, starbursts, EBL, IGM Characteristics Modified Davies-Cotton design 12 m diameter 90 m2 effective mirror area 1.2 m mirror facets 16 m focal length 8° field of view 0.18° PMT pixels Array layout South site: 25 MST North site: 15 MST Status Telescope prototyped (Berlin-Adlershof) Prototype cameras under construction (2 types: NectarCAM & FlashCam) 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

NectarCAM on MST Telescopes Weight: 1. 93 tons Size: 2.8 x 2.9 x 1.15 m Field of view: 8o Active part: 1855 pixels 265 modules 15 Institutes ~50 active members 3 countries (France, Spain, Germany) 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (Julie Prast) Basics of NectarCAM Nectar analogue memory ASIC Modular camera with 265 7-dynode PMTs modules -Nectar chip based module (2 gains/channel) => realizes the capture and digitization of data. -Mechanics, service, trigger elements, etc in common with LSTCAM. -Interfaces to structure similar to FlashCAM. The Cherenkov Telescope Array (Julie Prast) 22/11/2016

Subcomponent Prototyping (2011-2015) Module Focal plane instrumentation Trigger Interface Board Embedded camera controller Module holder Thermal prototype 5 module Cluster 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (Julie Prast) Pre-Production Module Holder Mini-Camera avec 19 modules 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Responsabilités au niveau du LAPP Service electronique : Développement d’un système pour la sécurité et le contrôle des cameras NectarCAM et LSTCAM (Nadia, Jean-Luc, Julie) Ingénierie système pour NectarCAM (Julie) Management systèmes auxiliaires pour LST (Eric, Armand) Développement d’un ASIC de lecture pour SiPM (Richard, Fatima) Et aussi : Conception des arches du LST et du Drive (Guillaume, Nicolas G, Ino, …) Software de contrôle LST (Thierry, JL) Groupe DATA pour exploitation et le stockage des données (Giovanni Nadine, and co) Responsabilité France CTA IN2P3 (Jean-Pierre) 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Systeme de sécurité et slow control Organe intelligent qui assure la sécurité de la camera nuit et jour. Prépare la camera avant les observations Met en sécurité la camera en cas de problème. Surveillance des paramètres environnementaux de la camera (T°, P, R. humidité, consommation …) et du statut des différents éléments de la camera (états des portes, des alims…). Contrôle des systèmes auxiliaires (alimentation, système de calibration du télescope et de la camera, refroidissement, …) Résistance aux vibrations, chocs, t° : [-20 ; +70] Basé sur un compact RIO Processeur temps réel basé sur un système d’exploitation Linux FPGA Zynq (Xilinx) Modules d’E/S : 8 slots Communication avec le système de contrôle de la camera via l’interface standard OPCUA 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

ECC Box Implementation Study of the ECC box internal implementation is ongoing. Room available ~32*64 cm2 plate Quite little for all features. Power units (stepper drive) of the 3 reflective target motors will need to be placed outside. cRIO crate Extension crate for RT modules Stepper drive 2 PSU (including redundancy) SubD37 interface modules 16 ch reference LED controller board 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (Julie Prast) Reflective Target Courtesy Carlos Diaz Fine alignment of the mirrors. Monitoring of the optical performances of the telescope. Camera calibration at single p. e- level. At the focal plane of the telescope, 26 mm above the entrance of the cones, behind the Plexiglas window. 40*40cm, ~5 kg Driven by 3 stepper motors NEMA23XL Remotely controlled from the Embedded Camera Controller (ECC) compact RIO. 5kg load End-course sensor cRIO crate 2*50 cm axis equipped with stepper motors 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Ingénieur systeme NectarCAM Fait partie management du projet (3 personnes). Assure cohérence technique du projet. Gestion des interfaces internes et externes. Suivi des spécifications. 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

The Cherenkov Telescope Array (J. Knödlseder) CTA Calendar Dates are only indicative! Critical Design Review, Site Decision Headquarters decision, Engagement of Funding Agencies Construction Early Science Key Science Projects Open Program 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 … The Cherenkov Telescope Array (J. Knödlseder)

Merci de votre attention. Des questions ?? Back up slides Merci de votre attention. Des questions ?? 22/11/2016 The Cherenkov Telescope Array (Julie Prast)

Astronomy with VHE gamma rays SNRs Starbursts Binaries AGN Pulsars/PWN Jets Accretion Shocks Diffusion Shocks Diffusion Jets Winds Cosmic rays GRBs Dark matter Jets Shocks Intergalactic medium VHE gamma rays probe Particle acceleration and propagation Cosmic rays Highest energy processes in a large variety of objects Intergalactic medium Dark matter and fundamental physics EBL IGM 22/11/2016 The Cherenkov Telescope Array (Julie Prast)