Brief overview on Cabling and Optical Fibre activities With particular accent on Optical Fibre working method D. Ricci, on behalf of EN-EL-CF section EDMS.

Slides:



Advertisements
Présentations similaires
OUR LAND – OUR WEALTH, OUR FUTURE, IN OUR HANDS Second Regional Preparation Workshop for the GEF Strategic Investment Program for Sustainable Land Management.
Advertisements

Les pronoms compléments
The implementation of the « Trames Vertes et Bleues » The example of the « biological corridors contracts » Alain CHABROLLE Vice –President « Health-Environment »
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
Revenir aux basiques !. 1 Revenir aux basiques Processus Nécessité daméliorer la Maîtrise les Offres et Projets: lanalyse des causes racines montre un.
Correspondance commerciale. Unsolicited offers =offres non solicitées. 1. we have just launched a new product……… 2.We are the leading manufactures of.
Haïti. HAITI Le Mouvement est présent à travers le pays entier. The Movement is present in the whole country. Haïti.
Time with minutes French II Le 30 Octobre.
French 3 & 4 October 17, When I was teaching in France, most of my students had all of their classes with the same group of people. How would this.
Cliquez et modifiez le titre Cliquez pour modifier les styles du texte du masque Deuxième niveau Troisième niveau Quatrième niveau Cinquième niveau 23/01/2014©
Status report SOLEIL April 2008
1 Roadmap to Achieve RBM Targets: COMORES January 2011 – December 2011 [Planning Template]
Repair of the Aortic dissection with surgical glue. P Menu, T Sais, P Corbi, M Rahmati, C Jayle, JM Charrière.
1 Découverte des Outils SI de Cadence Ecole dElectronique Numérique IN2P3 Roscoff 2006 Découverte des Outils dAnalyse dIntégrité du Signal de Cadence ®
Coopération/Distribution DEA Informatique Nancy. Content 4 Introduction - Overview 4 Coordination of virtual teams : –explicit interaction model –explicit.
Defence R&D Canada R et D pour la défense Canada Novel Concepts for the COP of the Future Denis Gouin Alexandre Bergeron-Guyard DRDC Valcartier.
C RIMINALITY I N F RANCE By Louis Lépinette. S TATISTICS Damage to goods Voluntary attempt to a persons physical integrity Financial fraud 1.
1 of 46 2 of 46 UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS.
2014 CIPAC/FAO/WHO Meeting Liège, Belgium 17 – 26 June 2014
Le niveau de vie des étudiants en Europe The standard of living of the students in Europe Observatoire de la vie étudiante / France Padoue Ronan.
Safety at CERN La sécurité au CERN
1 of of 40 UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS.
Party for Volunteers.
EUROPEAN ASSOCIATION OF DEVELOPMENT RESEARCH AND TRAINING INSTITUTES ASSOCIATION EUROPÉENNE DES INSTITUTS DE RECHERCHE ET DE FORMATION EN MATIÈRE DE DÉVELOPPEMENT.
Fire prevention in Luxembourg Performance based fire prevention (Project of Fire engineering Guidelines) Guy Weis Service dIncendie et dAmbulance de la.
Mardi 20 Novembre 2012 Recap I can
BURDET Georges CORRIGNAN Yoann GALLOIS Jean Claude
Rethinking language education, a challenge to tradition Repenser l'éducation aux langues, un défi à la tradition H. G. Widdowson University of Vienna -
Centre de compétence 1 Professionalisation of the tourist guides Innoguide tourism – Mercredi 1 er février 2012 – BIP Centre de compétence.
Magnets fiche projet / project sheet IAFACTORY THE MAGNETIC FACTORY magnets. IAFACTORY | conseil en architecture de linformation | |
Astroparticle Physics European Coordination between European Funding Agencies: France, Germany, Italy, United Kingdom, The Netherlands, Spain, Greece,
Seite 1 Présentation Guinée Réunion Task Force CQ/SQI, Eschborn CONCOURS QUALITE IN GUINEA Context and perennity Dr Mohamed Lamine.
IAFACTORY | conseil en architecture de linformation | | |
PURCHASING PHASE REVIEW Cornerstones of Purchase baseline
L’ensemble microcanonique
Présentation dun modèle dinterface adaptative dun système de diagnostique et dintervention industriel: ADAPTS (Adaptive Diagnostics And Personalized Technical.
1. Les structures de documentation pour la division ST. 2. Les types de document dans la division ST. 3. Linterface informatique. Lundi 8 Mai 2000 ST Quality.
ST Operation Committee Résumé du au Évènements (3) Computer Security ST Controls Working Group.
1 ISBN John Wiley and sons. 2 IntroductionIntroduction Chapter 1.
NTof Civil engineering Status -5 July 2013 EDMS approval procedure for « Execution drawings » launched on 24/05/2013. Drawings approved on 10/06/2013 CERN.
Civil engineering for LIU – PS
Donnez l’heure “Time”… it’s a ticking!.
The social construction of the adoptive relationship Parental experiences of adopting older children abroad Anne-Marie Piché, s.w, m.s.w, Doctoral candidate.
1. 2 Objective  Know the roles and responsibilities for helping units deploy Comprendre les rôles et les responsabilités d’aider unité à déployer.
Modifications of working conditions in the host states Report on the AT Board held on 18 April 2000 New minimum wages in Switzerland Impact of the 35-hour.
16-Oct-00SL-BI and QAP Presented to QAWG on 23/10/2000Slide 1 Quality Assurance in SL/BI Jean-Jacques GRAS (SL-BI)
AVEC LE SOUTIEN DE LA COMMISSION EUROPÉENNE WITH SUPPORT OF THE EUROPEAN COMMISSION 1 JUMELAGE/TWINNING BENEVOLAT ET CITOYENNETE INTERCOMMUNALE VOLUNTARY.
Double/multiple degree agreement ALMA MATER STUDIORUM – UNIVERSITÀ DI BOLOGNA Université D’Evry-Val-D’Essonne Ludwig-Maximilians-Universität in München.
KM-Master Course, 2004 Module: Communautés virtuelles, Agents intelligents C3: Collaborative Knowledge construction & knowledge sharing Thierry NABETH.
Belgian Breast Meeting Senator F. Roelants du Vivier 13th october.
Français 2, 29 Septembre 2014 Ouvrez vos livres à la page 20. Faites #26. Why is it important to be on-time for work if you're a computer security specialist?
1 Journées prospective In2p3 - Irfu Giens 2-5 avril 2012 Crédit CERN Prospective In2p3 – Irfu et stratégie européenne 5/6/2012 S. Loucatos, DSM-Irfu.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
Vision Globale Domaine d’application Objectif
BENCHMARK JOBS Marie-Laure Rivier – January 2015.
EPRUS Etablissement de Préparation et de Réponse aux Urgences Sanitaires.
Training in BE 16 March 2015 BEMB. Centrally defined trainings TrainingDurationWhoBefore Language Integration 60 hours 10 weeks MPE MPA contract > 6 months.
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
WINS Windows Internet Name Service. What is WINS?  It does name resolution (?!) DNS resolves IP numbers and FQDN ARP resolves IP numbers and MAC addresses.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
SPS préparation travaux LS2
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
CRG TM for YETS November 6th 2017.
Definition Division of labour (or specialisation) takes place when a worker specialises in producing a good or a part of a good.
BRMS Implementation Status Update Template designed by 18-July-2015.
Safety Talk EN DSO & EROS
Asset Management Inventorial Assets: Stand-Alone equipment items that have a cost of $2,000 or more and a useful life of one year or more Artwork & Collections.
M’SILA University Information Communication Sciences and technology
Transcription de la présentation:

Brief overview on Cabling and Optical Fibre activities With particular accent on Optical Fibre working method D. Ricci, on behalf of EN-EL-CF section EDMS

What’s Cabling ? 2  Cabling = copper cables (CTRL+DC) + optical fibres:  ~ km copper cables  ~ km of optical fibres  The activity includes:  Installation of cabling for CERN accelerators, general infrastructure and experiments  Collaborate in the definition of the cable cross-sections, connectors and optical fibre types  Operation and maintenance of the optical fibre infrastructure  Design, reconfiguration, maintenance (all CERN users)  Qualify and procure radiation resistant optical fibres (2400 km for LS1)  Procure and standardise cables, optical fibres and connectors for CERN users  233 orders in 2012 – Average investment per year: 3.5MCHF  managing cable parc: ~4200 drums for LS1  Operation and maintenance of the cable tray infrastructure (350 km)  Monitor aging and steer the cable/fibre replacement campaigns  ~1MCHF/machine point November 6th, 2013D. Ricci, S. Machado – CF overview for IT

Cabling and Optical Fibre section (EN-EL-CF) 35 staff contractors during LS1 peak Projects  same working method November 6th, 2013D. Ricci, S. Machado – CF overview for IT3

EN-EL-CF functional model  Work: punctual activity. Taken at charge by a Section member following from a User’s request.  Project: activity with the following characteristics:  A “Project Leader” is assigned among the CERN’s Users  A project “Technical Coordination” is put in place  A project “planning coordination” is put in place  Strong interactions with central/periferals study offices (Integration) Interaction with ~600 users for all CERN departments/groups November 6th, 2013D. Ricci, S. Machado – CF overview for IT4

The LS1 challenge: the important numbers  37 main projects to carry on + day-by-day installation works (Some examples: R2E, LHC cabling campaigns, WCC hose consolidation, SPS campaigns & irradiated cables TS1+, new SPS fibre infrastructure (BI & others), PSS, LINAC4 & Meyrin campaigns, Computer Centre extension B513, LHC-Experiments fibre upgrade)  Overall estimated budget ~15 MCHF  ~1000 km of copper and optical cables being installed during LS1 November 6th, 2013D. Ricci, S. Machado – CF overview for IT5 of 25

The strategy 6  Example1: anticipate qualification and procurement of material  Some special cables/fibres require 6 months to be procured  Early processing of the user’s needs (deadline June 2012)  orders placed  All cables/connectors defined by Oct 2012  last orders finalised November 6th, 2013D. Ricci, S. Machado – CF overview for IT Procurement copper cables & connectors + fibres… Qualification of RRF More than 20 irradiation tests 2400 km procured in 2012/13  LHC consolidation + upgrade  SPS new Beam Instrumentation For more details see LSC presentation June 2013

The strategy 7  Example2: anticipate contractors’ workload and optimize planning time-slots  Negotiation of working time slot with machine & project coordinators since Sep 2012  Optimal shaping of workload curves for contractors w.r.t. co-activity constraints  Work organized by geographical campaigns November 6th, 2013D. Ricci, S. Machado – CF overview for IT For more details see LSC presentation June 2013

Infrastructure: current situation 8November 6th, 2013D. Ricci, S. Machado – CF overview for IT Overloaded areas SPS: class1976 (36 years old)PS: class 1959 (53 years old) Rest of PS-complex and Meyrin technical galleries Gallery TP9 Intersection Linac2-Linac4-PSB Gallery TP9 Intersection Linac2-Linac4-PSB Cables installed before ’80s are with halogens (risk in case of fire accidents) PS ring centre Galleries Shafts

EN-EL-CF UTILISATEUR Unité Fibres Optiques – Méthode de travail contrat C202/EN DIF Demande Installation Fibres DIF Demande Installation Fibres Accusé de réception CONTRACTANT Préparation dossier complémentaire Vérification des données Etude de la demande Préparation du dossier technique Commande de matériel Envoi du OSVC (Ordre Service Valant Commande) Signature Préparation du dossier administratif Envoi de l’OE (Ordre Exécution) PREPARATIONPREPARATION Fibres supplémentaires Modifications éventuelles Contrôle de l’installation Remise de l’installation EXE CUT ION Remise de l’installation Fiche de retour Contrôle des métrés Réunion de planification/présentation des travaux Etude des passages, cheminements, etc. - VIC Production du matériel Estimation financière Devis Préparation procédures de sécurité (AOC, VIC, IMPACT, etc.) Installation (pose tubes/câbles, terminaison, test) Fiche de modification Fiche de réception Réception/reprises Préparation chantier, transport du matériel REC EPTI ON TRA NS MI SS ION D. Ricci – EDMS Updated: 5 Nov 2013 Remise des métrés Métrés

10 Backup slides November 6th, 2013D. Ricci, S. Machado – CF overview for IT

The strategy 11  Facing technical challenges: optimize work organisation and resource distribution by working by geographical campaigns November 6th, 2013D. Ricci, S. Machado – CF overview for IT Campaign Booster Campaign SPS-BA1 Campaign LHC-Point1 PROJ 1 Various works for TE/ABT PROJ 2 LIU PROJ n Various works for BE/BI Campaign SPS-TS1+ PROJ x Repl. Irradiated cables TS1+ Campaign LHC-Point 5 Campaign LHC-Point 8 Campaign LHC-Point 1 PROJ y R2E Case 1 Case 2 Case 3 ~700 cables/fibres work orders for LS1