S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM 04.03.2014 In sharepoint: https://espace.cern.ch/sba- workspace/tcc2wg/LS1%20worksite%20meeting/

Slides:



Advertisements
Présentations similaires
Échanger connaissances et techniques sur les routes et le transport routier 1 The PIARC Website.
Advertisements

Risk analysis : - Splitters replacement - TCSC replacement WG TDC2/TCC2 18 th June 2013 E. HARROUCH EN/MEF.
TDC2/TCC2 Réunion de chantier
Section HE-HH. Section HE-HH Heavy Handling in Meyrin 2013 LS1 a commencé en printemps PS: rénovation système de ventilation (désamiantage), échange.
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
EHN1 – visiting point at the OD2013 Ilias Efthymiopoulos, Adrian Fabich, MEF-LE ENMB, 9 th September 2013.
TDC2/TCC2 Réunion de chantier
S.Evrard - EN-MEF XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)
TDC2/TCC2 Réunion de chantier
TDC2/TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
TDC2/TCC2 Réunion de chantier 2
Worksite meeting 09/05/2014. Travaux réalisés Bunker XTAX monté Survey géomètres Tests palonnier motorisé XTAX Pose de léclairage dappoint sur la passerelle.
S. EVRARD, EN-MEF XTAX table repair Agenda 2 - Sébastien EVRARD Problème ressorts spiralés Plusieurs solutions envisagées: Ressort h60mm Ressort.
Splitters 2 Chambre à remplacer durant la campagne vide 1 mSv/h 4 mSv/h 6 mSv/h Aimants MDLV et MDLV à retirer Aimant MDLV à retirer.
PH SPace Overview Board Space POlicy Board A. Petrilli, May 19, 2011.
Removal procedure: work dose planning optimization TAN study group : Meeting #5 16/11/2012.
TDC2/TCC2 consolidation Worksite meeting 29/08/2014.
Meeting 2015#1 Linac4 Coordination of Installation January 2015 – schedule follow-up EDMS J. Coupard EN-MEF1 week 3.
ECS activities Xavier Vilasís-Cardona Calorimeter Meeting - Xvc.
Association belge de la Route Belgische Wegenvereniging Belgian Road Association ABR - BWV.
1 Welcome to LAPP ATF2 meeting in Annecy October 9 to 11, 2006.
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
SEPA: Introduction Axelle Waterkeyn - National Bank of Belgium Programme Management Office.
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting Update on Q1 TAS REGION (18 to 22m), layouts.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
J-B. Lallement, B. Mikulec
Ch. VUITTON BE-BI mai Les moniteurs dans le SPS Instruments BI. Ex : -Ligne TDC2/TCC2 - Zone d’extraction (LSS2) Nos interventions. Documentation.
UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS; A CONTRACT.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
Ce document est la propriété intellectuelle de DASSAULT AVIATION. Il ne peut être utilisé, reproduit, modifié ou communiqué sans son autorisation. DASSAULT.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
XTAX Repairs Bilan dosimetrique.
RECOMMENDATION FROM GrACQ PRECONISATIONS DU GrACQ
Hydraulic Engineering. Water Hammer Phenomenon in pipelines.
Slide 1 of Slide 2 of 37.
EN LS1 CV/ACCESS/Cabling Work co-activities February 5th, 2013 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CV/ACCESS/Cabling Work co-activities EDMS
YETS preparation S. Girod, EN-MEF EATM
Johann Collot, 10/10/ IBL-Phase0 au LPSC. Johann Collot, 10/10/ Contributions LPSC Mécanique (WG3) Ingénierie de l'extraction du tube à vide.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Formation RSSO : Mise en oeuvre du principe ALARA
Journal, le 22 septembre Qu’est-ce que tu as fait ce week-end? 5 phrases complètes (1 être verb) Boot up your netbooks!!
EN-CV Progress EHN1 Extension Project
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
Dashboard 2 October 2015 PH SO1. PREVENTION INCIDENT MANAGEMENT COMMUNICATION.
2008 General Meeting Assemblée générale 2008 Toronto, Ontario 2008 General Meeting Assemblée générale 2008 Toronto, Ontario Canadian Institute of Actuaries.
Gilles OLIVIER Orsay, le 18 février CRYOMODULE ESS ELLIPTIQUES CRYOMODULE ESS CAVITES ELLIPTIQUES Réunion CEA / IPNO ORSAY, le 18 février 2015 Unité.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
10 février 2016 Informatique et Réseaux – Domaine de responsabilités.
M-ECCTD LIAISON CLOCHE/TUBE DISQUE RUPT. Tube cloche D267x273 (Ep. 3)
LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
NA YETS: schedule week by week S. Evrard.
EP/DT-DI Meeting MCP Magnet Control Project. ATLAS Réparation des soufflets endommagés sur ECTC Préparation au réchauffage, décablage complet de la turret.
Faites-le maintenant BUT: En quelle classe es-tu?.
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
PPE’s Personal Protective Equipments. PPE’s The equipment which save you & your body from any hazard called Personal Protective Equipment (PPE’s).
1 LUND March 16 th, 2016 INSULATION VACUUM SEALS M-ECCTD STATUS Bell flange Elastomer Coupler flange Helicoflex He valve (x2) Elastomer Pumping port (x2?)
De-cabling strategy during YETS August 2017
Injectors de-cabling Project General information June 2017 INDICO:
TERM 1 (20%) Competencies targeted Evaluation Methods
Interventions BE-BI LS2
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
AUG Risk Analysis.
North area S. Girod, EATM,
Reporting on national biodiversity strategies,
Transcription de la présentation:

S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/ workspace/tcc2wg/LS1%20worksite%20meeting/

Outline 2 - Sébastien EVRARD  2014 schedule  Worksite progress  Dedicated working groups

2014 Schedule 3 - Sébastien EVRARDOctober 14th, 2013ALARA L3 Committee

Removal of hot items  Removal of hot items from the worksites:  TCSC removed first and brought to B.955  3 splitter2 magnets and 2 MDLV removed and stored in TDC2  Many beam monitors, BLM and vacuum beam pipes

3 splitter2 magnets 2 MDLV magnets Removal of hot items

Splitters

MDLV

Beam instrumentation 8 - Sébastien EVRARDOctober 14th, 2013ALARA L3 Committee

Chilled pipes exchange 9 - Sébastien EVRARDOctober 14th, 2013ALARA L3 Committee

Secondary beam line vacuum maintenance 10 - Sébastien EVRARD  Nous avons remplacé l’huile des pompes à palettes et remplacer 4 pompes à vide dans le cadre de la rénovation.  Apres contrôle par PVSS il reste à contrôler le vide sur place au niveau de chaque pompe à vide  Placer une plateforme pour déplacer les deux pompes du M2, (fabrication à l’atelier 887)  détection de fuite October 14th, 2013ALARA L3 Committee

Dedicated working groups 11 - Sébastien EVRARD  LV systems and Cabling  XTAX repair October 14th, 2013ALARA L3 Committee

Cabling detailed study 12 - Sébastien EVRARDOctober 14th, 2013ALARA L3 Committee

Cabling EN-EL schedule 13 - Sébastien EVRARD  31/3 WDP assessment for Alara level  31/3-21/4 preparation Dry Run presentation  22/4 Dry Run discussion within CF Section  28/4 ENTM Dry Run  12/5 Alara Committee (if the study confirms to be a level III) October 14th, 2013ALARA L3 Committee

Life expired equipment LV systems

Solutions VérinNouvelle tête de vérin Nouveau soufflet (Plus grande course) Remplacement des pattes de guidage par une surface d’appui complète Poussoir a ressort (maintient de la coupelle pendant le levage) Coupelle de positionnement XTAX repair