I Activité de R&D: vers une cavité RF équipée 'made in France' Construire une cavité ILC Eacc = 40 MV/m Q0 = 2e10 équipée et testée en cryostat vertical.

Slides:



Advertisements
Présentations similaires
What is your connection to the REAL network and why is the REAL Network important to your association? ?
Advertisements

Research Issues at the Boundary of Competitive Dynamics and Market Evolution Written by: David Soberman and Hubert Gatignon.
French 3 & 4 October 17, When I was teaching in France, most of my students had all of their classes with the same group of people. How would this.
CEA DSM Irfu LP – TPC: MicroMegas Panels 08/04/2008Franck SENÉE Visite SPCI1 D. Attié, D. Calvet, P. Colas, C. Coquelet, X. Coppolani, E. Delagnes, F.
Avoir - Has / haveEtre - Am / is / are Il y a - There is / There are The bedroom has…The bedroom is… In the bedroom, there is / are… The bed has a blue.
Accord Technique No.2, SPL 4eme CSP, 25 novembre 2010
Cryomodules A et B SPIRAL 2
9eme CSP, CNRS-LAL 1er juillet 2013
Accord technique dexécution N°3 Contribution aux projets de nouveaux aimants supraconducteurs Point sur les activités de Saclay.
By Torie Herdt. Voila l Afrique La Tunisie est un pays francophone.
Le cryomodule SPL : Prototype d’une collaboration
Conception du cryomodule supraconducteur d’IFMIF-EVEDA
Etude de l’interaction thermique entre la cavité supraconductrice 700 MHz et son coupleur de puissance (150kW continu) M. SOULI, M. FOUAIDY, H. SAUGNAC,
Start with verb ? in the ? tense Start with verb ? in the ? tense Change the ? of my participe passé with ? Change the ? of my participe.
SOLEIL - Super-3HC (SLS et ELETTRA)
Cryomodules A et B SPIRAL 2 Résultats des tests Etat des lieux
ILC Paul Colas. Historique 1981 Proposition par B. Richter er workshop à Sarisälka Conceptual Design Report TESLA 2001 TESLA+XFEL 2003.
Design Thermique des Coupleurs de Puissance
CMS ATLAS LHCb CERN Tier 0 Centre at CERN National Centres Lab a Russia Lab c Uni n Lab b Manno Canada Uni y Uni x Tier3 physics department  Ge  Germany.
Objectif: Comment employer un exposant?. Objective: How to use an exponent?
January 26 th 2015 European Organization for Nuclear Research CLIC WORKSHOP 26/01/2015 CLIC WORKSHOP 2015, Geneva, Switzerland Optics Design and Beam Dynamics.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Specifications du faisceau de Proton de MHYRRA
Bref résumé du GDE de Pékin Guy Wormser 13 Février 2007.
Demonstrator Studies (More informations with Julien - results) Convection effect: no variation in time, simulated T° corresponding to tests determination.
Anitha sivaganesh foyer 140
Irregular Adjectives Not all adjectives are made the same.
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables How to plan grid investments smartly? Moulin de Beez, Namur.
CSP Meeting 1 – Linac4 Accord Technique #1 M. Vretenar, CERN O. Napoly, CEA Y. Gomez, CNRS-LPSC A. Variola, CNRS-LAL.
Halloween By p6b. Explain Halloween is on the 31 st of October and is on the streets. Kids like to go and say “trick or treat”. − Halloween se passe le.
R. Aleksan Saclay Fevrier 24, 2015 Informations générales CECP Prochain RV.
ROLE-PLAY 1 ARRIVING AT A HOTEL Say helloBonjour Say you want to book a double bedroom from the 14th to the 16th of may, on the ground floor if possible.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Problématique « utilisation » Fonctionnalités Performance Consommation Fiabilité Prix du produit Sept ,000.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
Vue 3D du RFQ ground fréquence MHz énergie d'entrée 45 keV énergie de sortie 3 MeV courant dans l'impulsion ≤ 80 mA Cycle utile ≤ 10 % longueur
Cryomodules prototypes à Cavités SPOKE et Elliptiques pour ESS Journées accélérateurs octobre 2015 Roscoff Franck PEAUGER (CEA) pour l’ensemble.
Journées Accélérateurs de la SFP
1CSP 26_11_2010 K.Schirm, CERN Accord Technique No 4, CLIC K. Schirm CERN, Geneva, Switzerland.
Accord Technique No.2: Contribution au développement du SPL V.Parma (CERN), P.Duthil (CNRS), P.Bosland (CEA) 1.Le SPL 2.Contenu de la contribution 3.Résumé.
Journees de prospective LAL/ Seillac 2012
Gilles OLIVIER Orsay, le 18 décembre CRYOMODULE ESS ELLIPTIQUES CRYOMODULE ESS CAVITES ELLIPTIQUES Réunion CEA / IPNO ORSAY, le 18 décembre 2013.
Gilles OLIVIER Orsay, le 18 février CRYOMODULE ESS ELLIPTIQUES CRYOMODULE ESS CAVITES ELLIPTIQUES Réunion CEA / IPNO ORSAY, le 18 février 2015 Unité.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Contractions with the Prepositions à and de. Differences and Similarities Faire du vélo Faire de la vidéo Jouer au golf Jouer aux cartes Each verb takes.
RozoFS KPI’s edition /04/2014. © Fizians Ce document ne peut être reproduit ou communiqué sans autorisation écrite. 2 RozoFS high level architecture.
YGM 11/02/2008 Journées Coupleur IN2P3 Page 1 But Coupleur de Spiral 2 Conception RF.
1CEA/ Saclay/ SACM CARE/SRF/WP11 BPM à cavité réentrante Claire Simon, Michel Luong, Stéphane Chel, Olivier Napoly, Jorge Novo, Dominique Roudier, Nicoleta.
Tests en faisceau à DESY de la TPC Micromegas D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J.-P. Martin, T. Matsuda, M. Riallot, F. Senée, Y-H.
1 La Contribution Française à l’accélérateur ESS (European Spallation Source) Journées Accélérateurs de Roscoff – 6 Octobre 2015 Pierre Bosland et Sébastien.
O. Napoly, Réunion P2I8 juin Grande Salle Blanche de l’Irfu à Saclay O. Napoly, CEA-Saclay, Irfu/SACM.
Technologie pour les accélérateurs De quoi est composé un accélérateur linéaire? Que peut faire le LAL InjecteurDiagnosticsEléments magnétiques Sections.
By Brandon Heuton. La Tour Eiffel a été construite pour célébrer le centième anniversaire de la Révolution française. A fallu deux ans pour construire.
Wilfrid da Silva (MCF) et Frédéric Kapusta (CR1) Activité ILC ( Futur Collisionneur Linéaire) Premiers en France à étudier la technologie sub-micron pour.
1 Activité faisceau longue distance: développement prototype de détecteur 5 juillet 2013 programme de R&D sur la technologie LAr pour détecteur lointain.
Accélérateur laser – plasma
PRODUCT BREAKDOWN STRUCTURE OF ESS ELLIPTICAL CRYOMODULES FIRST DRAFT 23/03/2016 F. PEAUGER.
Activités de l’IPNL en préparation pour le prototype Un d é tecteur de 1 m2 é xsite d é j à IHEP produira les 40 GRPC n é cessaires Mais : 1- Il faut les.
 Components have ratings  Ratings can be Voltage, Current or Power (Volts, Amps or Watts  If a Current of Power rating is exceeded the component overheats.
CSTS/SPP sur les futurs collisionneurs:
Où? d’Unité 3, leçon 6.
Vocab Test French to English English to French L’argent Racism
Les évolutions sur ILC F. Richard LAL/Orsay.
Pierre Bosland - pour l’équipe ESSI (ESS Irfu)
Réunion ILC-France lundi 13 juin 2005
Indirect Object Pronouns
Réunion GDE France LAL/Orsay
Making Sentences Negative in French
Ordinal Numbers D’Accord 1 Leçon 7B.
Transcription de la présentation:

i Activité de R&D: vers une cavité RF équipée 'made in France' Construire une cavité ILC Eacc = 40 MV/m Q0 = 2e10 équipée et testée en cryostat vertical

i Configurations ILC (~ cavités)

i Configurations ILC (~ cavités)

i

i Double Blindage

i

Cryonomics 05/12/2011O. Napoly7 If I am allowed to extrapolate the 75% increase of Q 0 shown by E. Kako with a double magnetic shielding, to ILC cavities with Eacc = 31.5 MV/m and with the assumptions: grid power = 0,15 € K CoP(2K) = 700 W/W magnetic shield = 1000€ / cavity cryogenics = 1 M€/100 Q0 = (RDR ) € P dyn. = 9.6 P dyn. = 5.5 Q0 = €

i Magnetic Shielding 28 Novem bre O. Napoly, Journées ILC, Saclay Magnetic shields are qualified by the excellent dynamic cryogenic performance of XM-3 Produced by MecaMagnetic from Aperam/Cryophy 1mm sheets

9 J. Sekutowicz, Towards More Flexibility in Operation of the XFEL Linac, DESY, October 25th, 2013 XM-3 cavities: vertical tests at 2K (7 Large Grain +1 Fine Grain cavity) 2. cw and lp operation; 3 experiments c. Dynamic heat load for Large Grain Cryomodule Measured dynamic heat load

i 2 K Blankets by Jehier 28 Novem bre 2013 O. Napoly, Journées ILC, Saclay10

i Proposition de R&D Saclay Construire une cavité prototype pour l’ILC (et LUNEX5-CW) - cavité 9 cellule 1.3 GHz (SDMS ?) courte pour l’ILC (collaboration ILC-HiGrade, ou KEK, ou FNAL) - électropolissage vertical (banc Saclay) - nouveau système d’accord CEA-DESY adapté (collaboration KEK, CERN) - coupleur de puissance (LAL-Orsay) - blindage interne au tank Hélium (collaboration KEK) - blindage externe (type DESY-XFEL) Mesurer ses performances dans un cryostat horizontal (CryHoLab) non-blindé: - à haut gradient 40 MV/m, 1% CU  quel Q0, quelle P cryo ? - à gradient modéré 15 MV/m, 100 % CU  Q0, P cryo ?