TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.

Slides:



Advertisements
Présentations similaires
Primary French Presentation 2 Saying How You Are.
Advertisements

Français La mémoire (2) Les phrases. Nous allons…
Lalignement du CLIC : passé, présent et futur 1 Séminaire TS 2005 TS/SU/MTI - CERN LALIGNEMENT DU CLIC : PASSE, PRESENT, FUTUR Hélène MAINAUD DURAND.
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
EHN1 – visiting point at the OD2013 Ilias Efthymiopoulos, Adrian Fabich, MEF-LE ENMB, 9 th September 2013.
REVUE DES TRAVAUX SURVEY
Meeting 2015#1 Linac4 Coordination of Installation January 2015 – schedule follow-up EDMS J. Coupard EN-MEF1 week 3.
INTERVENTION Z.T.S. INSTALLATION DE 4 ENSEMBLES COMPLETS: SUPPORTS +POUTRES TBM TD26 CLEX /LAB.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
LS1 : ACTIVITES LINAC4.
1 Welcome to LAPP ATF2 meeting in Annecy October 9 to 11, 2006.
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
ELI Nuclear Physics meeting, Bucarest Feb1-2, 2010 Interferometric beam combination Gérard Mourou.
The Green Line in EHN1 A. Fabich. The Green Line Couloir Jura: RDC: Tous les portes vers les zones faisceauet et pont vers couloir central RDC: Cote sud:
LHC progress Friday 10 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
BOITES DE DISTRIBUTION POUR L’ALIMENTATION ELECTRIQUE DU LHC
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
J-B. Lallement, B. Mikulec
Calcul CMS: bilan 2008 C. Charlot / LLR LCG-DIR mars 2009.
D. Pugnat, S. Griffet 18/04/2012 EDMS N° /17 Dimensional control and fiducialisation of TM1 CLIC girder n°DB02E Measurements performed the 29th.
EBP-BIOSOC WP1. Synthesis of methodological issues and proposals for further processing of the data.
(ref : Bray section pages 259 à 266)
27 Apr 2005Jean-Christophe Gayde EDMS: SUMMARY OF ECAL / HCAL SURVEY RESULTS DEMAND FOR SURVEY … LHCb EA MEETING April 27th, 2005.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Demonstrator Studies (More informations with Julien - results) Convection effect: no variation in time, simulated T° corresponding to tests determination.
Unité 2 La vie courante Leçon 3 Bon appétit. Thème et Objectifs Everyday life in France In this unit, you will learn how to get along in France. You will.
BAF3 Civil engineering Status -25 April 2014 EDMS approval procedure for « Execution drawings » launched on 29/07/2013. Drawings approved on 28/08/2013.
Groupe ALICE /Détecteur V0 (1)
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables How to plan grid investments smartly? Moulin de Beez, Namur.
RECOMMENDATION FROM GrACQ PRECONISATIONS DU GrACQ
Hydraulic Engineering. Water Hammer Phenomenon in pipelines.
GSN as a middleware solution for OCARI: GMOCARI
Slide 1 of Slide 2 of 35.
Activités LC au LAPP et ressources humaines en 2012 Équivalent Temps Plein total : 5.6 physiciens, 8 ingénieurs et 2.2 techniciens Étude de canaux de physique.
YETS preparation S. Girod, EN-MEF EATM
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
EN-CV Progress EHN1 Extension Project
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
1CSP 26_11_2010 K.Schirm, CERN Accord Technique No 4, CLIC K. Schirm CERN, Geneva, Switzerland.
Journees de prospective LAL/ Seillac 2012
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
1 1. Linac4 – 2012 Progress New 2.8MW klystron H- source DTL CCDTL RFQ.
Gilles OLIVIER Orsay, le 18 février CRYOMODULE ESS ELLIPTIQUES CRYOMODULE ESS CAVITES ELLIPTIQUES Réunion CEA / IPNO ORSAY, le 18 février 2015 Unité.
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Les collimateurs du LHC BRAINSTORMING 11/12/2015.
LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
RozoFS KPI’s edition /04/2014. © Fizians Ce document ne peut être reproduit ou communiqué sans autorisation écrite. 2 RozoFS high level architecture.
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
Nouvelles d’ATF2 au Japon Suite à une réunion ATF2 qui s’est tenue la semaine dernière au Japon (8 heures de décalage horaire!) A.Jeremie-17/01/12- service.
Etude du glacier de Tete Rousse C. Vincent (1), A. Legchenko (2), S. Garambois (3), E Thibert (4), O. Gagliardini (1) (1)Laboratoire de Glaciologie et.
NA YETS: schedule week by week S. Evrard.
O. Napoly, Réunion P2I8 juin Grande Salle Blanche de l’Irfu à Saclay O. Napoly, CEA-Saclay, Irfu/SACM.
Construction Permit Supplementary surface buildings for CMS experiment – Point 5.
OBJECTIFS: To recognise and repeat at least 4 items of furniture; To use the question ‘où est…?’ to ask where something is; LITERACY - To use at least.
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
Installation of the detectors LHCb EA 39/2005 B.Chadaj.
CAF-11/10/2010Luc1 Squad Report T1 Période 13/09-11/10 Irena, Sabine, Emmanuel.
Programme LAViSta côté LAPP A.Jeremie 12 décembre 2007 J.P.Baud, B.Bolzon, L.Brunetti, G.Gaillard, N.Geffroy, J.Tassan.
1 LUND March 16 th, 2016 INSULATION VACUUM SEALS M-ECCTD STATUS Bell flange Elastomer Coupler flange Helicoflex He valve (x2) Elastomer Pumping port (x2?)
FD relative displacement measurements A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner, D.Schulte, R.Tomas-Garcia B.Bolzon.
North area S. Girod, EATM,
CRG TM for YETS November 6th 2017.
Scenario d’intégration du pixel alpin
Safety Talk EN DSO & EROS
Transcription de la présentation:

TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection Survey Visit1 day2.06 4Dismantling of the shielding blocks (to get the direct access for new equipment) 1 day2.06 5Organizing of free access to CLEX building1day3.06 6Initial measurement of the CLEX2days storage

SURVEY 5-6Initial measurement of the CLEX : Measurement of the existing references Determination of the theoretical beam 2days Action préalable Discussion préalable à avoir avec Tobias Analyser les résultats des dernières mesures effectuées par le contrat Mesure Mesurer l’ensemble des fiducielles du réseau Mesurer les fiducielles des composants +Re-fiducialisation des composants (Wilfried)  plusieurs jours Action post-mesure Analyse Préparation du plan d’implantation des plaques metrologiques Préparation du plan d’implantation des plaques actionneurs

TBM implantation in CLEX 3 TaskDurationDate 6Dismantling of TBTS PB and DB tanks -disconnection of electrical cables and water pipes -disconnection and dismantling of RF network 6.5 days

TBM implantation in CLEX 4 TaskDurationDate 7-dismantling and transport of the TBTS PB Tank to the buffer zone1 day09.06

TBM implantation in CLEX 5 TaskDurationDate 8-dismantling and transport of the TBTS DB Tank and transport to the storage 1 day10.06

TBM implantation in CLEX TaskDurationDate 9-Disconnection of all cables (+ labelling) and pipes in the working area 4.5 days ~ 14 meters

TBM implantation in CLEX TaskDurationDate 10-Removal of the equipment in the working area4 days ComponentPicQuantityComponentPicQuantity Quadrupoles12Supports10 Correctors10 Sector vacuum valves 4 BPMs and diagnostics chambers 8 Pumping ports (including valves and pumps) 5 Flashbox1 Drift Tubes and bellows

TBM implantation in CLEX TaskDurationDate 11-Dismantling of the yellow girders and feet3 days Removal of the cooling distribution (central line)3 days Precise Floor marking before drilling of the holes for installation of the TBM supporting system: 32 holes in total For dimensions: DRAWING CLIATCIN days Drilling of the floor for all the supporting equipment1.5 days TaskQuantity Feet to be removed from area6 Feet to be replaced2 Girders to be removed from area6 Girders to be replaced6 New girders to be manufactured (see on next slides) 3 1 day

SURVEY 13-Precise Floor marking before drilling of the holes for installation of the TBM supporting system: 32 holes in total For dimensions: DRAWING CLIATCIN day Action préalable Avoir fini et validé le plan d’implantation Mesure Implantation des 32 trous Action post-mesure Ø

Supporting Elements for TBM and CLEX Components 2 Feet to be reused in different place (8 holes to be drilled) New girders (x3) TBM supporting benches (24 holes to be drilled for installation) All green feet will not be moved Green girders will be moved by several cm.

TBM implantation in CLEX TaskDurationDate 15-VACATIONS period time reservation30 days Installation of the supporting elements of the TBM and CLEX components  Installation of the new yellow supporting girders (1 day)  Transport and Installation of the TBM extremity benches (1 day)  Geometrical control of the extremity benches (3 days) 5 days TBM installation and assembly See next slides 26 days day 3 days

SURVEY 16-Installation of the supporting elements of the TBM and CLEX components  Installation of the new yellow supporting girders (1 day)  Transport and Installation of the TBM extremity benches (1 day)  Geometrical control of the extremity benches (1 day) 3 days Action préalable Avoir mesuré les plaques métrologique en métrologie Avoir un plan d’implantation pour les plaques métrologiques Mesure Nivelement et ajustement des plaques métrologiques Controle des mesures CMM des plaques métrologiques Action post-mesure Ø

Installation of the TBM supporting system TaskDurationDate 18Installation of the TBM supporting system 5 days Geometrical control of the TBM supporting system 3 days Alignment of the girders (with respect to the existing beam) 1 day Installation of alignment’s device (wire, cable, sensors, data acquisition, …) 2 days Absolute measurement (cWPS sensors vs AT401 tracker) 1 day Test of actuators displacement on 1 mm range (girder unloaded) 1 day Test of the Articulation Point (girder unloaded) 1 day day Tests sous réserve

SURVEY 18Installation of the TBM supporting system 5 days Action préalable Avoir un plan d’implantation pour les plaques actionneurs Software des actionneurs opérationnel Shelter prêt Mesure Installation des câbles actionneurs Nivelement et ajustement des plaques actionneurs Réglage des actionneurs à mi-course Action post-mesure Ø

SURVEY 19Geometrical control of the TBM supporting system 1 day Action préalable Installer des poids sur la poutre Mesure Mesure de l’ensemble des fiducielles 1.5’’ de la poutre et des berceaux) Action post-mesure Valider l’assemblage poutre-berceau

SURVEY 20Alignment of the girders (with respect to the existing beam) 1 day20.08 Action préalable Avoir une position exacte du faisceau existant (dans le réseau général) Mesure Alignement de l’axe des V. par rapport aux faisceaux existants. Action post-mesure Ø

SURVEY 21Installation of alignment’s device (wire, cable, sensors, data acquisition, …) 2 days Action préalable Avoir 20 capteurs calibrés (avec une plaque amagnetique) Protection du fil et du poids prêt Mesure Installation des câbles MCA-8 Installation des câbles Mul-Rad Installation des 4 fils (mise à la masse) Installation de la protection du fil et du poids Action post-mesure Ø

SURVEY 22Absolute measurement (cWPS sensors vs AT401 tracker) 1 day25.08 Action préalable Software Acquisition opérationnel Software Calcul absolu opérationnel Mesure Répétabilité des capteurs Test de linéarité Action post-mesure Calcul absolu (comparaison AT401-cWPS)

SURVEY 23Test of actuators displacement on 1 mm range (girder loaded with weight) 1 day Test of the Articulation Point (girder loaded with weight) 1 day27.08 Action préalable Ø Mesure Mesure AT401 initiale Déplacement de chaque actionneur individuelement (+/-1mm) Déplacement des degrés de liberté Mesure AT401 finale Action post-mesure Analyse Test prévu seulement si les tests dans le lab. sont mauvais En fonction de la stratégie de transport

Installation of the components of the TBM + alignment control TaskDurationDate 25Installation of the components of the TBM + alignment control + cooling test5 days Cables for TBM routing and connection to the equipment in the external shelter2 days Test of actuators displacement on 1 mm range (girder loaded)1 day Test of the Articulation Point (girder loaded)1 day Scanner 3D of the module3 days A la fin Tests décalés plus tard (après RFN)

SURVEY 25Installation of the components of the TBM + alignment control + cooling test5 days Action préalable Composants mesurés en métrologie (fiducialiser) Support DBQ opérationnel Mesure Installation des composants à la place des poids Ajustement du DBQ Controle des mesures CMM des composants Mesure de la position des composants sur la poutre Action post-mesure Ø

TBM implantation in CLEX TaskDurationDate 30Primary RF Network installation Installation of the RF components on the TBTS tank (2 days) Installation of the waveguides between TBTS tank and TBM Including supports, pumping port etc. (1 day) 3 days Test of actuators displacement on 1 mm range (girder loaded)1 day08.09 Test of the Articulation Point (girder loaded)1 day09.09

SURVEY 31Test of actuators displacement on 1 mm range (girder loaded)1 day Test of the Articulation Point (girder loaded)1 day09.09 Action préalable Après l’installation des RF Network Mesure Mesure AT401 initiale Déplacement de chaque actionneur individuellement (+/-1mm) Déplacement des degrés de liberté Mesure AT401 finale Action post-mesure Analyse Test prévu seulement si les tests dans le lab. sont mauvais

TBM implantation in CLEX TaskDurationDate 31 Installation of CLEX components according to new configuration (not all the components are listed below, components, final inventory under way) 12.5 days ComponentPicQuantityComponentPicQuantity Quadrupoles12Supports18 Correctors8 Sector vacuum valves 4 BPMs and diagnostics chambers 9 Pumping ports (including valves and pumps) 5 Flashbox1 Drift Tubes and bellows

SURVEY Action préalable Récuperer les fichiers de fiducialisation des composants Mesure Installation des composants Nivelement et ajustement des composants Action post-mesure Ø Test prévu seulement si les tests dans le lab. sont mauvais 31 Installation of CLEX components according to new configuration (not all the components are listed below, components, final inventory under way) 12.5 days

CLEX working area after installation of components

Final tests and cables reconnection TaskDurationDate Leaktightness test2 days Final alignment tests3 days Reconstruction of cable trays and cables pulling5 days Reconnection of all cables (according to labelling) and pipes in the working area 2 days Cooling system test2 days Closing the shielding1 day15.09 Safety chain test1 day30.09 Commissioning5 days days

SURVEY Action préalable Ø Mesure Mesure AT401 initiale Déplacement de chaque actionneur individuelement (+/-1mm) Déplacement des degrés de liberté Mesure AT401 finale Scanner 3D of the module Action post-mesure Ø Final alignment tests4 days