LHCb DC06 status report (LHCb Week, 13/09/06) concernant le CC : –Site currently fine / stable 3% of simulatated events 30% of reconstructed events –Site.

Slides:



Advertisements
Présentations similaires
Le calendrier français.
Advertisements

Le lièvre et la tortue.
Passé Composé vs. LImparfait Specific Actions Specific Time in the past Equivalent to the English ed ending on verbs Ongoing actions or continuous actions.
Groupe Utilisateurs Dimensions 21/10/2011. COPIL du 31/08/2011COPIL du2 Dimensions chez Natixis : – Développement des applications WEB/.NET – Développements.
LCG DATAGRID - France 8 Juillet 2002 LCG : LHC Grid computing - qui, quoi, quand, comment ? Quoi ? But : préparer l'infrastructure informatique des 4 expériences.
Handy Time Vocab 1 - Calendar With Miss Digitally Angry Clock-Face.
LEÇON 102. Écrivez vos devoirs: 1.Continuer de préparer lexamen final. 2.Check your Pinnacle, turn in any/all make-ups, missing assignments, re-takes,
Les Vacances How to talk about holidays in the Past Tense Jai + __________é (avoir verbs) je suis allé(e) etc (être verbs) Opinions Pronunciation It was…
31/01/2001Réunionn WP6-Y. Schutz (SUBATECH) 1 Simulation-Reconstruction ALICE Une application pour le TestBed 0 ?
Unité 2 La grammaire d’Unité 2. L’accord o One must make agreement from the noun(s) to the verb: - Il coûte… - Elle coûte… - Ils coûtent… - Elles coûtent…
Projet LCG: Déploiement Pierre Girard EGEE/LCG ROC EGEE/LCG site deployment Centre de Calcul de l’IN2P3 LCG France Lyon, 14 décembre.
E2CTF #1 – Support et développement 17 septembre 2008 Composition Eric Van Uytvinck –Migration Euclid vers CATIA (y compris minutes GMEC), Migration CATIA-dfs.
Calcul CMS: bilan CCRC08 C. Charlot / LLR LCGFR, 3 mars 2008.
Calcul CMS: bilan 2008 C. Charlot / LLR LCG-DIR mars 2009.
2-mars-2009Eric Lançon1 Nouvelles d’ATLAS Reunion LCG 2 mars 2009 Lyon.
CMS ATLAS LHCb CERN Tier 0 Centre at CERN National Centres Lab a Russia Lab c Uni n Lab b Manno Canada Uni y Uni x Tier3 physics department  Ge  Germany.
LCG-France: Tier-1 au CC-IN2P3 Bilan 2005 et perspectives 2006 Fabio Hernandez Responsable Technique LCG-France Centre de Calcul de l’IN2P3
Gestion de données : Besoins de la VO Biomed Sorina Pop Laboratoire Creatis Université de Lyon, CREATIS; CNRS UMR5220; Inserm U1044; INSA-Lyon; Université.
depuis, il y a, pendant, pour
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
Résumé CHEP 2010 Distributed processing and analysis Grid and cloud middleware Thèmes : 1.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Contact Sécurité du ROC français R. Rumler.
Tier1 at the CC-IN2P3 March Current state at the CC-IN2P3 storage, computation, network...
CAF-13/09/2010Luc1 Squad Report T2 Période 19/06-11/09 Irena, Sabine, Emmanuel.
Le noeud de grille Tier 3 LAPP.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Depuis Describing how long one has been doing something.
DEPUIS: SINCE, FOR Les normes: Les questions essentielles:  Communication 1.2- Which tense is used with “Depuis” to express an action that begins in the.
Jean-Pascal Margueron SYSLOG Informatique SA LicenseIT Expériences pratiques RUBIS Automne 1999.
Présentation des architectures et scénarios de tests
Michel Jouvin LAL/Orsay
Commencez Écrivez ta date d’anniversaire et faites la queue en ordre des mois de l’année. [Write your birth date in French on a card and line up according.
DINQ/DSIN/INSI/ETSO/APGI
 PASS É MEANS PAST TENSE  IMPARFAIT MEANS IMPERFECT  PASSÉ IS FOR WHEN WE ARE TALKING ABOUT A SHORT DURATION OF A TIME (PASSÉ EST POUR UNE COURTE DURÉE)
C’est quand ton anniversaire?. Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information.
SORTIR Leçon 8: Tu es sorti? to go out to get out je sors nous sortons
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Le week-end, enfin! 2 2 UNITÉ Quit Tu es sorti? 8 8 A B Le passé composé avec être p. 133 C L’expression il y a p. 137 Les verbes comme sortir et partir.
Many verbs that are irregular in the present also have irregular past participles. Therefore, no rule for formation, you need to memorize them. Each time.
Notes le premier mars L’imparfait et le passé composé ensemble We can use the passé composé and the imparfait (imperfect) together to talk about the past.
Les Vacances La compréhension auditive. Compréhension 1.6 Sébastien 1.Where does Sébastien sometimes go in the Summer? 2.At what time of the year does.
Leçon 4C: Le temps Main topic: Talking about the weather.
Dossier 2 depuis, il y a, pendant, pour. If you are asking a question about the duration of an action that began in the past and still continues in the.
Mandat du Groupe -collecter les besoins des responsables des sites et de services de la région, -recenser les pratiques des sites et les outils de monitoring.
ever for This presentation requires PowerPoint XP or later.
Le Cours-Les Questions 1.What is the verb in French for: “To join/enrol for a course” etc = 2.What type of course does she sign up for? 3.When does she.
GRIF Status Michel Jouvin LAL/Orsay
Perfect tense with ÊTRE. When do you use the perfect tense with être?  The perfect tense with être is also used to describe an action in the past which.
Développement des templates Quattor de gLite à EMI Guillaume PHILIPPON.
Catalogues de fichiers de données. David Bouvet2 Problématique Possibilité de répliquer les fichiers sur divers SE  nécessité d’un catalogue de fichiers.
Retour d'expérience sur le déploiement d'un site grille de production Pierre Girard EGEE/LCG ROC Deputy EGEE/LCG RC coordinator Centre de Calcul de l’IN2P3.
CEA DSM Irfu Mises à jour de sécurité… … et la pratique F.SCHAER.
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
C. Charlot, LLR Ecole Polytechnique DC04 CMS Objectif numéro 1: préparation du traitement offline Différent des productions MC précédentes Mise en route.
Installation of the detectors LHCb EA 39/2005 B.Chadaj.
Projet LCG: Vue d’Ensemble Fabio Hernandez Responsable Technique LCG-France Centre de Calcul de l’IN2P3 Rencontre IN2P3/STIC Grenoble, 25.
Fabio Hernandez Lyon, 9 novembre 2006 LCG-France Tier-1 Réunion de Coordination.
CAF-11/10/2010Luc1 Squad Report T1 Période 13/09-11/10 Irena, Sabine, Emmanuel.
Resource allocation: what can we learn from HPC? 20 janvier 2011 Vincent Breton Crédit: Catherine Le Louarn.
20-mars-2008Eric Lançon1 Activités ATLAS sur le nuage Français Emprunts a K. Bernardet, C. Biscarat, S. Jezequel, G. Rahal.
Mercredi 22 juin 2016 Suivi des jobs grille Colloque LCG France Mars 2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Monitoring dans EGEE Frederic Schaer ( Judit.
INFSO-RI Enabling Grids for E-sciencE Data management Daniel Jouvenot IN2P3-LAL ORSAY - 02/02/2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Session “Site Administrator” Pierre Girard.
CALCUL ATLAS LCG France (CC IN2P3 Lyon) 30 Avril SOMMAIRE Data Challenge 2 (DC2) d’ATLAS Utilisation du CC IN2P3.
Fonctionnement de la grille
Consolidation des services FTS et LFC
Lequel The Last Part.
Réflexifs.
Transcription de la présentation:

LHCb DC06 status report (LHCb Week, 13/09/06) concernant le CC : –Site currently fine / stable 3% of simulatated events 30% of reconstructed events –Site mainly used as DIRAC site Working with IN2P3 support to get the LCG setup working –Grid accessible queues need to become longer (done last week) –Now is working as DIRAC and LCG site –Problems during last month Batch system at Lyon went down for few days DC06 normalement fini depuis fin septembre (?)

VOMS Server VOMS avec MySQL toujours en gLite 1.4 ! –upgrade urgente Procédure de mise à jour : –mise en place d’une machine virtuelle avec VOMS gLite 1.4 –upgrade à gLite 3.0.x –si upgrade OK, upgrade du serveur VOMS de prod.

FTS Dernière version/updates installés Nouvelle machine installée depuis le 25/10/06 –plus de problème de charge –installation avec Yaim (ancienne machine était encore avec les fichiers xml) –mise en place d’un alias cclcgftsprod01 28/10/06 : mise en place d’un patch Oracle buggé  FTS indisponible : 3 jours de mauvais fonctionnement + 3 jours de downtime –mise en place d’une nouvelle base Oracle sur une machine de test par JRR + copie de la base de prod –FTS fonctionne avec cette base jusqu’à ce que Oracle fournisse un nouveau patch Tests des transferts vers les T2 : à refaire avec le nouveau serveur FTS –Frédérique Chollet devait en lancer (notamment vers Subatech), mais a été interrompu par le problème lié à Oracle. Reprise ?

LFC LFC Biomed : dernière version/updates déployés + Oracle LFC locaux : dernière version/updates déployés + MySQL –demande des DBA de migrer sur Oracle migration prévu ce mois : à voir suivant l’évolution concernant le pb Oracle.