Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.

Slides:



Advertisements
Présentations similaires
Primary French Presentation 2 Saying How You Are.
Advertisements

and a justification for level 4
Y and en Two little words with a lot of meaning. y.
Welcome to a French lesson Bonjour classe Can you tell me using a verb what have you done yesterday, this morning or before you came to this class?
Mardi 20 Novembre 2012 Recap I can
Job Interview. Francais 3 Regulier (1 Oral Formative Assessment, 1 Written Formative Assessment, 1 Vocab Quiz Formative Assessment.
Les choses que j aime Learning Objective: To know how to use j aime to talk about things I like to do.
Y and en Two little words with a lot of meaning. y.
Meeting 2015#1 Linac4 Coordination of Installation January 2015 – schedule follow-up EDMS J. Coupard EN-MEF1 week 3.
ECS activities Xavier Vilasís-Cardona Calorimeter Meeting - Xvc.
WEST GREENE FRENCHIES! Français I lundi, le 03 novembre 2014 Le projet pour s’amuser et apprendre 1.Self directed learning with instructor support and.
Transition Unit Personal Information Lesson 1
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting Update on Q1 TAS REGION (18 to 22m), layouts.
Research interests Viviane Gascon Vietnam Nurse scheduling Viviane Gascon and Éric Gagné.
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
THE ADJECTIVES: BEAU, NOUVEAU AND VIEUX 1.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
Recycled Christmas Cards for our Comenius Partners! "Edité avec le soutien financier de la Commission européenne. Le contenu de cette publication et l'usage.
Unité 1: Faisons Connaissance Leçon 1 Bonjour!
Questions: -W-W-W-What are their main tasks? - What skills should laboratory technicians have? (quote at least 6) -W-W-W-Why is it important for a lab.
Remaining tasks LS1 DT-LHCb coordination meeting 19 January 2015.
Oceans et cotes By Cesare Campisi. La mer est essentielle La majorite de le notre planete est couverte de oceans et mers.Mais dernierement les personnes.
27 Apr 2005Jean-Christophe Gayde EDMS: SUMMARY OF ECAL / HCAL SURVEY RESULTS DEMAND FOR SURVEY … LHCb EA MEETING April 27th, 2005.
Vendredi le 5 septembre 2014
Chapter 6 Lesson 1 Essential Questions: How can you talk about the city in French? How can you describe how you travel in the city?
Edson Brito April, 10, 2011 French IP.  Legacy is anything handed down from the past, as from an ancestor or predecessor.
ESPRIT IMS-WG n°21955Lausanne IMS-EUROPE Workshop ORGANISER : CRAN - UNIVERSITY OF NANCY I LOCATION : UNIVERSITY OF NANCY I FACULTY OF SCIENCE (A.I.P.L.)
Year 10. Bon appetit unit. Introducing ‘en’. ‘en’ – ‘some of it’ or ‘some of them’ ‘En’ is a small but important word in French that is commonly used.
Tache 1 Construction d’un simulateur. Objectifs Disposer d’un simulateur d’une population présentant un déséquilibre de liaison historique, afin d’évaluer.
Welcome everyone.
Warm Up le 5 mars Écrivez tout ce que tu sais pour la grammaire française Par exemple: DR MRS VANDERTRAMP utilise être L’Academie Française.
Slide 1 of Slide 2 of 35.
Le pronom « en » Révision: p60-61 dans le cahier.
Slide 1 of Slide 2 of 37.
Groupe DØ Arnaud Duperrin Master 2 P3TMA 7 septembre 2012 Physique des Particules Arnaud Duperrin Marie-Claude CousinouEric KajfaszElemer NagySmain Kermiche.
Planification stratégique Strategic Planning Saturday, May 5, 2012 / Samedi, le 5 mai, 2012.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community 22 Jul 05.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Orientation 2006 by Pierrette Guimond Asssistant Director Graduate Programs School of Nursing.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
 I am a new student in your school. You invite me for lunch. You start the conversation.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
Poursuivre la rénovation du Day Care Center À Biri qui accueille enfants. To continue the renovation of the Day Care Center in Biri that caters to.
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
Révision: p60-61 dans le cahier
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
Français 10/12/15 Ouvrez vos livres á la page 40. Faites #6. Two flies are on a porch: which one is the actor? Se dépêcher – to hurry. Dépêche – toi. Hurry.
Negative sentences Questions
NA YETS: schedule week by week S. Evrard.
O WHY IS IT IMPORTANT TO PLAN AHEAD FOR THE FUTURE?
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
Installation of the detectors LHCb EA 39/2005 B.Chadaj.
The future tense. Expressions you will need to talk about the future 1.Demain 2.Le week-end prochain 3.Samedi prochain 4.L’ été prochain 5.La semaine.
Travaux alimentation électrique SLX8 (3852)
Look at these two pictures.  Do you recognize these two places?  Would you be able to tell me where each picture was taken?  Why?
Globalization
North area S. Girod, EATM,
Résumé CB WLCG du 3 février 2005
Quelle est la date aujourd’hui? Aujourd’hui c’est mardi 12 septembre!
Quelle est la date aujourd’hui?
Quelle est la date aujourd’hui?
Quelle est la date aujourd’hui?
Quelle est la date aujourd’hui?
Quelle est la date aujourd’hui?
Bienvenue Au monde des Pronoms.
Progress check Learning:
Task while waiting for everyone to finish writing the WALT and WILF
Mardi 30 Janvier Français PreAP/AP
les instructions Bonjour la classe, sortez vos affaires
Transcription de la présentation:

Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014

VELO and Muon detectors VELO: replacement VELO needs to be brought in a safe position while heavywork is done in the surface building from June onwards. Muon: Work on chambers to improve the grounding (carried out by Nikolai), is to 90 % done. Two GEM chamber in M1 need still to be replaced (by INFN colleagues). Detector closing and alignment is a major effort. Preparations for the installation of additional shielding under HCAL need to carried out before the summer, in close consultation with our colleagues working on the calorimeters.

Calorimeter Consolidation of calorimeter moving system before end of June with Annecy colleagues as main actors, but Robert will assist them. – Remplacement des soufflets des vis a billes SPD cote A et C et alignement. – Remplacement des soufflets des vis a billes ECAL cote A et alignement – Installation d'un systeme de fermeture des portillons des plateformes ECAL et HCAL cote A et C et passage des cables – Reparation du end switch HCAL cote C (remplacement et passage de nouveaus cables) – Cablage, controle et mise en fonctionnement des nouvelles protections (end-switch, fermeture portillons) – Mise a niveau du systeme de commande et de l'armoire de controle des deplacements ECAL/HCAL. In addition about 2 ½ days are needed for calorimeter movements, about ½ day per week.

HERSCHEL (FSC) Installation of 5 Forward Shower Counters (FSC) stations (4 scintillation counters per station) in the LHC tunnel before the cool-down of sectors78 and 81.  Installation should be done in August. Preparation of mechanics done with PNPI technician. Installation of cables for the counters, including supports and holes to pass through the cables.  Should be finished by June 15.