7th stabilization meeting

Slides:



Advertisements
Présentations similaires
Réseau local virtuel (VLAN)
Advertisements

Échantillonnage de l'eau et des facteurs connexes pour mesurer les caractéristiques physiques, chimiques et microbiologiques de l'eau de surface et des.
Z SILICON DRIFT DETECTOR IN ALICE When a particle crosses the thickness of SDD electrons are released. They drift under the effect of an applied electric.
Information Theory and Radar Waveform Design Mark R. bell September 1993 Sofia FENNI.
Français 2, 12 janvier 2015 Ouvrez vos livres à la page 68. Faites #14. Ecrivez-le. What kind of tree can you find in a kitchen? le haricot – bean. C’est.
Révision Test #4 – L’impératif et la culture. Question #1 What are the two forms of impératif that we learned in class? (Ex: Je, tu il, elle …etc)
C’est combien ? Les euros
1 Welcome to LAPP ATF2 meeting in Annecy October 9 to 11, 2006.
 The compound past tense (past indefinite), more commonly known as the passé composé, refers to an action or event completed in the past.  The word “compound”
LHC progress Friday 10 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Let’s go back to the verb endings. What are our 3 infinitive endings? ER IR RE What is an infinitive? An unconjugated verb In other words, a verb in the.
D. Pugnat, S. Griffet 18/04/2012 EDMS N° /17 Dimensional control and fiducialisation of TM1 CLIC girder n°DB02E Measurements performed the 29th.
January 26 th 2015 European Organization for Nuclear Research CLIC WORKSHOP 26/01/2015 CLIC WORKSHOP 2015, Geneva, Switzerland Optics Design and Beam Dynamics.
M.Lintz, Laser ranging OHP Colloq.23-27/09/ work on absolute laser ranging of long distances at laboratoire ARTEMIS two posters: µm scale accuracy,
THE ADJECTIVES: BEAU, NOUVEAU AND VIEUX 1.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
A. Le comparatif p.234 Comparative constructions are used to compare people or things. Cet hôtel est aussi moderne que l’autre. This hotel is as modern.
Formation de la précipitation
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
The BMV project : axion search with a pulsed magnet Status of the experiment Rémy Battesti Laboratoire National des Champs Magnétiques Pulsés Université.
ÉCOLE POLYTECHNIQUE CONCOURS 2010 Workshop NSERC scholarship application 23 avril 2015 École Polytechnique.
Français 2, 5 janvier 2015 Describe your holiday break, use the past tense. Things you did or ate. What is the difference between here and there? Sage.
Lucia - LAPP Phi* meeting - 3 novembre Correcting back to the electrons after FSR So far C Z defined w.r.t. electrons before FSR Z status = 3 and.
Les pronoms objets Mme Zakus. Les pronoms objets When dealing with sentences, subjects are part of the action of the verb. In other words, they “ do ”
Techniques de l’eau et calcul des réseaux le calcul hydrologique proprement dit Michel Verbanck 2012.
Your team’s name. Préselection file You have just downloaded the preselection file: it’s the first step for you to win the challenge! In this file, you.
Irregular Adjectives Not all adjectives are made the same.
Les verbes réfléchis.
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables How to plan grid investments smartly? Moulin de Beez, Namur.
Tache 1 Construction d’un simulateur. Objectifs Disposer d’un simulateur d’une population présentant un déséquilibre de liaison historique, afin d’évaluer.
Détection interférométrique des Ondes Gravitationnelles
African Centre for Statistics United Nations Economic Commission for Africa Session : Etapes de mise en oeuvre du SCN 2008 Milestones for implementation.
University of Ottawa - Bio 4118 – Applied Biostatistics © Antoine Morin and Scott Findlay 24/07/2015 2:29 PM Bootstrap et permutations.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
NAME: Abdul Saleem Mir Enrollment Number: 49/2010 7th ELECTRICAL
The child handling the topic with a gesture Sari Karjalainen, University of Helsinki, Department of Speech Sciences _____________________________________________________________________________________________________________.
Classe de sixième Objectives To learn about classroom objects Listen to the sounds Look at the words Say the words out loud - pronunciation Write the.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
Le Voyage: Chapitre 1 Une Journée Idéale à la Plage Tips for reading in a foreign language: Try to understand the main idea of a passage, not every single.
Comptes les points noirs !!! Elles sont droites ou courbées, les lignes?
Fiber Optic Fundamentals Prepared for The Handbook of Fiber Optic Data Communication Third Edition Dr. Casimer DeCusatis IBM Corporation.
Setting Europe in motion : Favoriser l’intégration Un projet de développement scolaire soutenu par L’Union Européenne Action Comenius 1.3 – 3 eme année.
French 1 Chapter 2 Grammar 2
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Clique Percolation Method (CPM)
RozoFS KPI’s edition /04/2014. © Fizians Ce document ne peut être reproduit ou communiqué sans autorisation écrite. 2 RozoFS high level architecture.
PDMS casting station The casting station consist of a spin coater, a dessicator and a hot plate. All instruments are installed in a fume hood. The main.
The final intercalibration process Prerequisites 1. Good status boundaries have been set by Member States. 2. IC process has passed “feasibility checks“.
Perfect tense with ÊTRE. When do you use the perfect tense with être?  The perfect tense with être is also used to describe an action in the past which.
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
1 Linear Prediction. 2 Linear Prediction (Introduction) : The object of linear prediction is to estimate the output sequence from a linear combination.
NC and CNC machines and Control Programming
Programme LAViSta côté LAPP A.Jeremie 12 décembre 2007 J.P.Baud, B.Bolzon, L.Brunetti, G.Gaillard, N.Geffroy, J.Tassan.
1 LUND March 16 th, 2016 INSULATION VACUUM SEALS M-ECCTD STATUS Bell flange Elastomer Coupler flange Helicoflex He valve (x2) Elastomer Pumping port (x2?)
Jean-Charles VANEL 05/04/2007 Introduction –Un point rapide sur le prototype physique Approvisionnement en wafer Montage à DESY Beam test au CERN –Eudet.
WINS Windows Internet Name Service. What is WINS?  It does name resolution (?!) DNS resolves IP numbers and FQDN ARP resolves IP numbers and MAC addresses.
FD relative displacement measurements A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner, D.Schulte, R.Tomas-Garcia B.Bolzon.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
Physical principle Ultrapurification Single pixel detector Electronics
Réunion service Instrumentation Activités CMS-Traces
Quantum Computer A New Era of Future Computing Ahmed WAFDI ??????
Theory of Relativity Title of report Encercle by Dr. M.Mifdal Realized by ZRAR Mohamed.
INVERTER LOAD SPEED CONTROLLER Power demand Speed reference ENGINE 230/400V 50Hz/60Hz PMGPMG 1 f = Hz Speed =var Island Operation of the Adjustable.
1210 压辊安装 List of tools to use 1, 2, tongbang, hammer 3, circlip pliers, installing a circlip using 4 discus with a screwdriver, a word,
Manometer lower pressure higher pressure P1P1 PaPa height 750 mm Hg 130 mm higher pressure 880 mm Hg P a = h = +- lower pressure 620 mm Hg.
beam charge measurements
University : Ammar Telidji Laghouat Faculty : Technology Department : Electronics 3rd year Telecommunications Professor : S.Benghouini Student: Tadj Souad.
Transcription de la présentation:

7th stabilization meeting 24 avril 2017 7th stabilization meeting Optical measurement of the pole tips

Latest news from interferometers Available options with plane mirror Michelson differential measurement from RENISHAW Fabry-Pérot sensors from ATTOCUBE SIOS multiple beams measurement 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Michelson interferometer Characteristics : RENISHAW system Michelson interferometer Characteristics : Range 0 m - 1 m Cyclic error <1 nm Output signal format Digital - RS422 quadrature Analogue - 1 Vpp sine / cosine Maximum velocity 1 m.s-1 Laser type HeNe (Helium / Neon), 632.8 nm, Class II Laser lifetime >50,000 hours 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Setup : RENISHAW system 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Assets : Defects: Easy setup Easy alignment RENISHAW system Assets : Easy setup Easy alignment Real differential measurement (same reference for two beams) Defects: Sales department 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Fiber probe extremity (reflecting surface) ATTOCUBE system The attoFPSensor is based on a fiber-based Fabry-Perot interferometer which consists of a single-mode fiber mounted in a fiber probe and a sensing element. The space between the fiber probe and the reflecting surface is called the cavity length. The reflected light is wavelength modulated in exact accordance with the cavity length. Cavity length Reflecting surface lens Sensor Fiber probe extremity (reflecting surface) photodiode 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Characteristics ATTOCUBE system Wavelength tuneable near 1300 nm, 1550 nm other wavelengths on demand Range collimated light working distance up to 100 mm (more on demand) spot diameter ~500 µm @100mm (fiber: Corning SMF-28) focused light diffraction limited - focusing lens with NA ranging from 0.1 to 0.6 - confocal microscopy objectives Smallest detectable motion @ 10 Hz 225 pm (at 75 µW laser power; 300Hz BW) @ 100 Hz 100 pm (at 75 µW laser power; 300Hz BW) 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Characteristics ATTOCUBE system Head Characteristics stainless steel, titanium collimating lens holder diameter 11 mm, length 35 mm Repeatability limited by wavelength lower than 1.5 nm over target distance of 20 mm Speed only reading 6 µm/s low precision (wavelength/16 increments) 150 µm/s high precision 30 µm/s Maximum Bandwidth usual 1 ms per data point higher on demand Optical fibre single mode fiber 250 µm diameter, plastic coated for RT and LT operation metal coated for UHV compatibility on demand 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Assets : Defects : Compact size Easy and customized setup ATTOCUBE system Assets : Compact size Easy and customized setup Firm attention Defects : No multiple beam measurement available No differential measurement possible (synchro problem to face) 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

See Kurt for further information SIOS system See Kurt for further information 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

First test with differential interferometer Connectivity Interface USB 1 COM 1 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

First test : configuration setup Laser unit Measurement head Interpolation device NI acquisition 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

First test : acquisition Configuration : USB port + RENISHAW interface Analogic I/O + home made LabView screen No temperature, pressure, hygrometry devices connected Correction made with default condition (T, P, Hy) put in RENISHAW interface Wavelength correction made with Edlen modified formula in both interfaces 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Easy to connect Easy to align First test : result Easy to connect Easy to align Easy to setup and communicate with (when you are given the right switches configuration) A value offset still remains between analogical and Renishaw interface (can be solved quickly) 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Can be carried out with 2 Attocube sensors (swapped if necessary) Qualification test Measurement of a movement given by a calibrated actuator (amplitude and frequency) Measurement head Plane mirror Calibrated movement Actuator Can be carried out with 2 Attocube sensors (swapped if necessary) 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Application to pole measurement Possibility to drill the poles to be accepted 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

Application to pole measurement Information needed : Permit drilling poles If allowed, maximum diameter dimension Problem of measuring extremities : Mechanical compatibility with magnet elements Possible use of a vibrometer 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)

ATTOCUBE proposal to be tested Next steps Test with actuator : Analog./digital I/O Turbulence protection ATTOCUBE proposal to be tested Adaptation to the mock up for measurement 25/09/2008 -MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)