EN-CV Progress EHN1 Extension Project

Slides:



Advertisements
Présentations similaires
PH SPace Overview Board Space POlicy Board A. Petrilli, May 19, 2011.
Advertisements

I. Intro, contexte, historique des mmorts II. SVN, historique des langages utilisés III. Serveur PHP, client 2D: JavaScript IV. Client 3D: Java, JoGL.
AFRICAN GROUP ON NATIONAL ACCOUNTS AGNA GROUPE AFRICAIN DE COMPTABILITÉ NATIONALE C RÉATION DU R ÉSEAU AFRICAIN DES COMPTABLES NATIONAUX.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
Minor Road Property June 23, Great news! As of this morning the last legal obligations were completed: Waterside is now the owner of the two parcels.
Meeting 2015#1 Linac4 Coordination of Installation January 2015 – schedule follow-up EDMS J. Coupard EN-MEF1 week 3.
Laboratoire des outils informatiques pour la conception et la production en mécanique (LICP) ÉCOLE POLYTECHNIQUE FÉDÉRALE DE LAUSANNE 1 Petri nets for.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
Transition Unit Personal Information Lesson 1
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
PH SPace Overview Board Space POlicy Board A.Petrilli, September 26, 2013.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
L. Roy Detector Safety System Tests INCENDIE (Baraques, Caverne, PZ) Tests FUITE D’EAU BARAQUES.
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
Directions: 9 slides with daily routine reflexive verbs in the present, near future and past 1 slide with a non reflexive verb 1 slide must entirely be.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
Per. 1-5: n&NR=1 Per. 6 & 7
Warm up What activities you must (devoir) do every day, every week, or every year in your life. Then write a sentence like: chaque jour, je dois respirer.
BAF3 Civil engineering Status -25 April 2014 EDMS approval procedure for « Execution drawings » launched on 29/07/2013. Drawings approved on 28/08/2013.
Unité 4 Comment Faire Des Achats Role Play Tran Le.
Your team’s name. Préselection file You have just downloaded the preselection file: it’s the first step for you to win the challenge! In this file, you.
Le 4-7 novembre. Qui est présent? Quelle heure est-il? La feuille pour étudier L’examen La Jéopardie!
Modèles d’interaction et scénarios
Let’s enjoy making Session 4. Let’s enjoy making: Session 4 Le matériel.
Slide 1 of Slide 2 of 35.
Session : Modele plan d’action Template Action Plan
Slide 1 of Slide 2 of 37.
EN LS1 CV/ACCESS/Cabling Work co-activities February 5th, 2013 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CV/ACCESS/Cabling Work co-activities EDMS
The Future Tense (Le futur) The future tense is formed by adding “avoir” endings to the infinitive of a verb. Ai As A Ons Ez Ont parlerai choisirai Parleras.
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
© Crown copyright 2011, Department for Education These materials have been designed to be reproduced for internal circulation, research and teaching or.
Orientation 2006 by Pierrette Guimond Asssistant Director Graduate Programs School of Nursing.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 27, 2013.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
B. Pirollet - TS CV - Aout 2006 Ventilation experience LHCB Concept général. Présentation d’aout 2006 Point sur travaux. Extraction; gaz/ fumées Planning.
YETS 2015/2016 Travaux EN/EL [ hors CF ] G. Cumer 22 septembre 2015.
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
Activités CV Consolidation NA pour YETS2015, EYETS2016 et YETS2017 Jani Lehtinen – 24/09/ Activités CV - Consolidation NA pour YETS2015, EYETS2016.
Journees de prospective LAL/ Seillac 2012
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
26 November 2007D.LACARRERE1 UX85 B – COOLING PIPES (Mixed & Chilled Water) Radiography (Se75) - Localization 29 welds to be inspected.
Play the presentation & note down new vocabulary Complete the activities Le petit déjeuner Breakfast.
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
Negative sentences Questions
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
French leve 1 - Homework due on May 2, 2016 – vocabulary  You are given at the beginning of the year the global list of the vocabulary list of BON VOYAGE,
O. Napoly, Réunion P2I8 juin Grande Salle Blanche de l’Irfu à Saclay O. Napoly, CEA-Saclay, Irfu/SACM.
Construction Permit Supplementary surface buildings for CMS experiment – Point 5.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
P : 1 26th of March 2014, Paris Continuité Numérique : un enjeu d’efficacité pour l’industrie supporté par les standards Standard STEP AP 242 – ISO
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
SEW Maintenance Series ReplacingaStator SEW-EURODRIVE—Driving the world.
TERM 1 (20%) Competencies targeted Evaluation Methods
North area S. Girod, EATM,
CRG TM for YETS November 6th 2017.
Budget Meeting Saturday Oct 29, 2016 à 1:30PM at the CLUB HOUSE
BUSINESS TEMPLATE ADD YOUR TITLE HERE Catalog Part 01 /YOUR TITLE Part 02 /YOUR TITLE Part 04 /YOUR TITLE Part 03 /YOUR TITLE.
BRMS Implementation Status Update Template designed by 18-July-2015.
Travail de cloche Que buvez vous avec votre dÎner?
Travail de cloche Pensez à un personnage du livre que vous venez de finir. Quel cadeau, que vous pouvez acheter à Amazon.com, voulez-vous lui donner?
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/10/01

Contents 1. Works in progress 2. North wall dismantling Cold boxes works (Vertex 1&2, CMS, ATLAS H8) Fan coil installation for barrack HNA 494 2. North wall dismantling Dismantling works (water networks, ventilation ducts,…) 3. Future design activities Future design activities : GAr extraction system, general ventilation User requirements missing 4. Schedule – CV activities

1. Works in progress Cold boxes Atlas & CMS piping networks completed components & instrumentation installed pressure tests done final step : switch from drinking water to raw water https://edms.cern.ch/document/1527243/1.0

1. Works in progress Cold boxes Vertex 1&2 (Jura side) new branches identified for connecting these CB Impact & VIC scheduled week 41 works / tests will be done as soon as possible final step : switch from drinking water to raw water Date to be confirmed by TE-CRG (14th of december 2015 ?) New fan coil for barrack HNA 494 cooling power 6,3 kW Installation will be performed on 13 & 14 October

2. North wall dismantling Works completed : firefighting network interception chilled water disconnected barrack HNA 910 mixed water station removed (north wall) old fan coil removed from barrack HNA 494 raw water network interception (several places) Works to be scheduled before end of 2015 : To be removed: ventilation ducts CW pipes & equipments drinking water loop To be rerouted: compressed air loop demi water network raw water network  Planning slightly updated due to asbestos constraint (GS & CV) !

3. Future design activities GAr extraction system : pre-study in progress first 3D model sent to MEF for integration model updated after comments GAr preliminary 3D model including extraction units & ducts

3. Future design activities Hall general ventilation: adding of 2 new ventilation units total flowrate: 210 000 m3/h total heating power: 2 440 kW  WP in progress Existing ventilation unit inside EHN1 building

3. Future design activities User requirements missing EN-CV needs technical data & requirements for designing the future extended networks as listed below: chilled water (for HVAC purposes) chilled water (for cooling down other some equipments) compressed air raw water demineralized water domestic water (hot and cold) fire fighting system gas extraction (other gases except GAr ?) ventilation for cryostat assembly clean room other… ?

4. Schedule – CV activities Tâches désamiantage/dépose GS & EN Début Durée estimée Intervention préalable à la connexion du réseau eau potable (côté Jura, au dessus du local R-101/R-102) / Travaux avec nacelle disponible dans le bât. 887 In progress 01/10/2015 1 jour Coupure et dépose tuyauteries Eau Glacée des réseaux du mur nord (derrière les barracks) / EN-CV-OP fera la vidange du réseau à partir du 21/10/2015 26/10/2015 1 semaine Coupure et dépose des tuyauteries d’Eau Glacée (Chilled Water) dans la gallerie technique Coupure et dépose des tuyauteries d’Eau Potable (Drinking Water) côtés Jura & Saleve et mur nord Fin décembre 2015 – date à confirmer avec TE-CRG 2 semaines – à confirmer  Dismantling planning review to be done (MEF & CV)

Thank you for your attention