S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.

Slides:



Advertisements
Présentations similaires
Banque de France - Autorité de Contrôle Prudentiel Relevance of liquidity regulation and impact on business models Frédéric VISNOVSKY Deputy general secretaryMay.
Advertisements

What does en mean? The object pronoun en usually means some or of them.
Systems of Equations. A system of equations is a set of equations that have the same variables. A solution for the system is an assignment of variables.
Test of FIC materials V.Grishin , IHEP-CERN BE-BI-BL #3, October 1st 2013.
Techniques de leau et calcul des réseaux séance 2a Michel Verbanck 2012.
TDC2/TCC2 Réunion de chantier
DC cable rerouting Comparison of 3 options. Goals Remove cable trays above Splitter magnets Exchange and re-route PVC insulated cables by PVC-free ones.
CONSOLIDATION ZONE NORD PROTECTION ZONE TCSC – MSSB PENDANT LES TRAVAUX 11 MARS 2013.
S.Evrard - EN-MEF XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)
TDC2/TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
TDC2/TCC2 Réunion de chantier 2
Splitters 2 Chambre à remplacer durant la campagne vide 1 mSv/h 4 mSv/h 6 mSv/h Aimants MDLV et MDLV à retirer Aimant MDLV à retirer.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
TDC2/TCC2 consolidation Worksite meeting 29/08/2014.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting Update on Q1 TAS REGION (18 to 22m), layouts.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
Astroparticle Physics in Provence Wednesday 7 July Presentation Amphitheatre CPPM 10: Welcome (John Carr) Introduction to neutrino.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
PREMIERE PROPOSITION DU 11 septembre SECONDE PROPOSITION DU 17 septembre - RECHERCHES SUR INSTALLATION MSSB - RECHERCHES DOC TUYAUTERIES - OPTIMISATION.
Two versions– slide three is updated as of 2012 to simplify the activity for students...hopefully.
Le superlatif Comparing people and things within a group.
Annual Best Practices Sessions / Ateliers annuels sur les pratiques exemplaires PERFORMANCE MONITORING, REPORTING AND EVALUATION: WHAT’S THE POINT OF.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Annual Best Practices Sessions / Ateliers annuels sur les pratiques exemplaires PERFORMANCE MONITORING, REPORTING AND EVALUATION: WHAT’S THE POINT OF.
Spot the odd one out! L’histoire J’aime le dessin La technologie
Cliquez et modifiez le titre Cliquez pour modifier le style des sous-titres du masque How does it feel to work with the purpose of saving lives everyday.
RECOMMENDATION FROM GrACQ PRECONISATIONS DU GrACQ
Slide 1 of Slide 2 of 35.
Slide 1 of Slide 2 of 37.
Les pronoms démonstratifs
EN LS1 CV/ACCESS/Cabling Work co-activities February 5th, 2013 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CV/ACCESS/Cabling Work co-activities EDMS
YETS preparation S. Girod, EN-MEF EATM
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
EN-CV Progress EHN1 Extension Project
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
Journees de prospective LAL/ Seillac 2012
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
LIU – TCDI. ICL M EETING 4 FEVRIER 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
Prepositions of location Describing the location of something or someone in relation to something or someone else.
Play the presentation & note down new vocabulary Complete the activities Le petit déjeuner Breakfast.
The “ R&D DEPARTMENT ”.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Intégration TRANSFORMATEURS BISMV 21 Octobre 2015.
Français 10/12/15 Ouvrez vos livres á la page 40. Faites #6. Two flies are on a porch: which one is the actor? Se dépêcher – to hurry. Dépêche – toi. Hurry.
LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
NA YETS: schedule week by week S. Evrard.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
Français 12/14/15 Ouvrez vos livres á la page 112. Ecrivez six phrases de sports et activités. What is worse than “raining cats and dogs?” Important(e)
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
Page : 1 ObjectWeb 04/10/2004 Direction Générale du Système d ’Information Ce document est la propriété intellectuelle de DASSAULT AVIATION. Il ne peut.
1 LUND March 16 th, 2016 INSULATION VACUUM SEALS M-ECCTD STATUS Bell flange Elastomer Coupler flange Helicoflex He valve (x2) Elastomer Pumping port (x2?)
An Introduction To Two – Port Networks The University of Tennessee Electrical and Computer Engineering Knoxville, TN wlg.
Do you remember how items are sold in French-speaking countries? Fruits and vegetables are priced by the pound (une livre =500 grammes) une livre.
Mon enfance Quand tu étais petit, tu étais comment?
Réunion service Instrumentation Activités CMS-Traces
Hot Air Balloon Workshop
Réunion GDE France LAL/Orsay
North area S. Girod, EATM,
Scenario d’intégration du pixel alpin
The consequences of the.
IOP/DOP/Y/ EN Adding in the last part.
Safety Talk EN DSO & EROS
Techniques de l’eau et calcul des réseaux
Ordinal Numbers D’Accord 1 Leçon 7B.
Transcription de la présentation:

S. EVRARD, Latest news from TCC2/TDC2

Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing

Schedule 3 - Sébastien EVRARD Activities DurationGroupNov'13Dec' TCSC removal 1wEN-HE,STI TT20 QNL magnet exchange 1wEN-HE Splitter removal 3wEN-HE MDLV removal 1wEN-HE Contingency 1w Goal end 2013: 6 hot items out of the way.

Optimization step 2- Removal of hot items 4 - Sébastien EVRARD  Removal of hot items from the worksites:  TCSC removed first and brought to B.955  3 splitter2 magnets and 2 MDLV removed and stored in TDC2

New vacuum leak 5 - Sébastien EVRARD

Visual inspection 6 - Sébastien EVRARD TCSC connexion Splitter magnet 2

7 - Sébastien EVRARD  Remove and re-route 5 cable trays above Splitter2 magnets  Re-route PVC insulated cables feeding the magnets upstream MDLV_ and replace them by PVC-free ones Cable and cable tray re-routing MSSB 3 MSSBTCSC Integration by C. Magnier, EN-MEF MDLV_ Control 1 Control 2 DC1 DC2 GS Current proposal Beam direction

Modèle 3D Catia ST _ 01 NOUVEAU ROUTING PROPOSE Chemins de Cables fixés au mur coté Jura Accès libre pour Lignes CV + Vannes

NOUVEAU ROUTING PROPOSE 2016mm 1798mm 1566mm 2230mm 2458mm Services généraux Puissance 2 Puissance 1 Contrôle Echelle existante (MSSB)