1CSP 26_11_2010 K.Schirm, CERN Accord Technique No 4, CLIC K. Schirm CERN, Geneva, Switzerland
2 The full CLIC scheme Not to scale!
Feasibility Items CLIC critical items 3
4 4.1 Participation in beam studies and beam instrumentation for CALIFES and TBTS On schedule as planned. Wilfrid Farabolini is permanently at CERN. Excellent collaboration
5
6 Califes Klystron and BOC Photo Injector Accelerating sections RF deflector for diagnostics waveguide RF distribution
Participation to CLIC Module Complete ACS and WFM final design review: July 2010, see also paper presented at LINAC10: WFM: delivery by end of Components for two accelerating structures have been launched in production. Few waveguide components are still missing. ACS: fabrication of three accelerating structures was launched in June at MecaChrome (FR), after a successful prototyping phase. At present the pre- machining of the disks is finished, including annealing before UHP machining. The assembly of the two accelerating structures is expected in the 1 st quarter of Bonding tests have been organized with Thales (FR) from January Germana RIDDONE DB MB
8 existing building Test Beam Line TBL Two Beam Test StandProbe Beam Status CLEX (CLIC Experimental Area) All Beam lines installed, except TBL and operated with beam ! (ITB is not part of the base-line programme) Beam from CR/TL2
9 Test Beam Line TBL 5 MV/m deceleration (35 A) 165 MV output Power High energy-spread beam transport decelerate to 50 % beam energy Drive Beam stability Stability of RF power extraction total power in 16 PETS: 2.5 GW Alignment procedures 2 standard cells, 16 total PETS prototype PETS development: CIEMAT BPM: IFIC Valencia and UPC Barcelona
GHz RF network for 8 PETS in TBL Sixteen 90-deg waveguide bends under fabrication, delivery planned for Mid December A high power load prototype with pick up has been designed. A call for tender for realization was done and results are expected next week. It is expected that this prototype would be ready for testing at CERN in April In case the high power test is successful a small series of this loads will be made which would use up the remaining funds. The exact number of this series will be determined later. Steffen Doebert
11 White paper CSP 26_11_2010 K. Schirm, CERN 4.4.Construction of a 12 GHz Test Stand: Modulator The modulator has been installed in the klystron gallery in May 2010 The modulator has been acceptance tested with dummy load in September 2010 Final acceptance testing with klystron now proceeding (visit of gallery in the afternoon)
12
Construction of a 12 GHz Test Stand: RF network and components Component activities in full swing. Excellent share of work between CEA and CERN (Conc. Design – drawing office - production - testing). Extension into 2011 expected. K. Schirm
14
Participation à la stabilisation des éléments optiques: Instrumentation spécifique (dynamique) Pas de résultats connus sur le démonstrateur simplifie, son actuateur et sa boucle de contrôle prévus dans le milestone 2; pas d'activités connues sur les calculs du milestone 3. Si l'activité continue, il me semble difficile de boucler en Les ressources au 1/10/10 mentionnées dans le tableau de bord ne sont pas en ligne avec les résultats. Il me semblerait de plus utile de faire un cross-check de ces ressources avec celles prévues dans le programme EuCard associe. Claude Hauviller
Participation à la stabilisation des éléments optiques: Instrumentation spécifique (optique) L'interféromètre a été acquis et mis en service mais les mesures au CEA et au CERN sont en retard (pb de disponibilité). Le programme de travail devrait cependant être complété en Les ressources au 1/10/10 mentionnées dans le tableau de bord et la présentation de Florence sont en ligne avec les résultats. Claude Hauviller
CLIC positron sources L’étude approfondie avec optimisation des cibles hybrides a continué au LAL. Une présentation orale a été effectuée lors du workshop IWLC à Genève en octobre Un deuxième rapport détaillé est en préparation concernant l’effet de canalisation dans les cibles cristallines, incorporé dans le logiciel GEANT4. Un rapport est en cours de rédaction concernant la capture des e+ jusqu’à 200 MeV. L’étude de l’anneau Compton a bien progressée et a aussi été présentée lors du workshop IWLC à Genève. Finalement, la cavité optique avec 4 miroirs (pour l’anneau Compton) a été installée au mois d’août 2010 sur ATF du KEK au Japon. Les expériences avec faisceau sont sur le point d’être démarrées. L.Rinolfi
GHz Klystron Klystron ready for FAT (scheduled for Dec. 2010) Acceptance at CERN expected in Jan