LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
MKDV1 MKDV2+3MKDH QFA518 BSGBlockMasks Dump et Kickers en LSS5 RAPPEL
Crystals Scraper Collimator Detector Absorber Roman Pot Scraper MKDV1 MKDV2+3MKDH QFA518 BSGBlockMasks Dump / Expérience UA9 en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/
Leave the UA9 devices in place: New goniometers with increased aperture Crystals on the dogleg Dumped beam during UA9 data taking will potentially hit the crystal Invert crystals extraction or Invert kicker horizontal deflection under investigation Radiation dose downstream the new dump should not be an issue Move UA9 devices: Remove TCXHW Move crystals (TCPC.51795, TECS.51797, TECS.51799) 60m upstream (at QF.51610) Move absorber (TACW.51998) 60m upstream (at QF.51810) Move detectors and collimator (TCSM.51934, XRPH.51937, BSHV.51991) in between crystals and absorber Leave the devices in the dispersive area in place After each object there is a pair of scintillators and an LHC-type BLM that should be moved with the object Baseline Simone Montesano (EN-STI) Dump / Expérience UA9 en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015
Beam Current Transformers Scraper Ionisation Profile Monitor (H) Beam-beam wire Wire Scanner Ionisation Profile Monitor (V) Wire Scanner Dump / Instrumentation en LSS Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015
Ionisaton profile monitor (H)Leave in PlaceOne MDHW less MDHW+BIPM MDHW ScraperRemoveIncluding Shieldings in & BSHV Linear Wire ScannerMove after QD.519 BWSD Ionisation profile monitor (V)Move after QD.519*One MDVW less MDVW + BIPMV MDVW Rotational Wire ScannerMove after QD.519 BWSRE Beam-beam wire BBLR.51760Remove BBLR.51771Remove BBLRM.51772Move after QD.519 BBLRM.51774Move after QD.519 MDVB.51777Move after QD.519BBLRM compensation Beam Current TransformerMove after QD.519*Separate BCTDC? Aperture to be checked. BCTDC BCTDC BCTFS * UA9 collimator and roman pots will have to be shifted by ~2m downstream (t.b.c.) Dump / Instrumentation en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015
Beam Current Transformers Scraper Ionisation Profile Monitor (H) Beam-beam wire Wire Scanner Ionisation Profile Monitor (V) Wire Scanner Dump / Instrumentation en LSS Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015 X X
Collimators Collimator Test Bench eCloud test bench eCloud Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/
CollimatorMove after QF.516Collimator test stand TCRMP eCloud test benchMove afer QD.117Move to LSS1 MDPH MPDH MDHW MDHW MDHW MDHW CollimatorRemoveUsers not identified BRCV BRCH Move eCloud test bench to LSS1 Reserve space for collimator test stand after QF.516 Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015
Collimators Collimator Test Bench eCloud test bench eCloud Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ X LSS1
Kickers DumpSEM DumpSEM Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ QDA QFA
Quad QDA.117Replace by QD QFA.118Replace by QFQFA will be used in LSS5 QDA.119Keep KickersRemove MKDVA Will be used for eCloud test bench. Aperture to be checked> MKDVB MKDHA MKDHA MKDHA InstrumentationRemove TFDH TFDV DumpRemove TIDH Replace by passive mask for scraper? TIDV Replace by passive mask for scraper? Vacuum chamber size to be adjusted Actual vacuum sectorisation to be checked Reason of QFA.116 (large aperture Quad) to be checked Dogleg will be removed Aperture for proton and ion injection checked Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015
Kickers → MDPH - MDHW (e Cloud) DumpSEM DumpSEM Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ QDA → QD QFA → QF X X X X
Il s’agit d’une première itération, des modifications sont donc possibles… L’optique doit verifier cette proposition, des calculs d’impédance et d’ouverture faisceau doivent être réalisés… L’intégration doit vérifier le layout machine en prennant en consideration les demandes du vide impacté par cette nouvelle configuration de la machine… Conclusion