LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS : 1548187.

Slides:



Advertisements
Présentations similaires
Le comparatif des adjectifs Comparing people and things.
Advertisements

Préférence de place conditionnée
Exercice #20 1. Quelle est la date aujourd’hui?
Status report SOLEIL April 2008
What does en mean? The object pronoun en usually means some or of them.
Les noms des partenaires ____________________________________ ____________________________________ Partie A: Notre thème est: ______________________________.
To be or not to be ? That is the question !!! PHYLOGENESE HUMAINE.
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
EHN1 – visiting point at the OD2013 Ilias Efthymiopoulos, Adrian Fabich, MEF-LE ENMB, 9 th September 2013.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
Y and en Two little words with a lot of meaning. y.
Comment poser et répondre aux questions
ASTRID BREUER Le passé compose avec le verbe être.
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
Français III projet cinématique (votre film). les critères Create a 3 minute film with a 1 minute introduction. The introduction must explain briefly.
ELI Nuclear Physics meeting, Bucarest Feb1-2, 2010 Interferometric beam combination Gérard Mourou.
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting Update on Q1 TAS REGION (18 to 22m), layouts.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
Faith and Light International Formation Session 2010 Energizing Meetings
depuis, il y a, pendant, pour
Les pronoms objets indirects.  Peux-tu identifier les règles des ‘pronoms objets indirects’ en regardant les exemples suivants?
Les verbes réfléchis Les normes: Communication 1.2 Comparisions 4.1
January 26 th 2015 European Organization for Nuclear Research CLIC WORKSHOP 26/01/2015 CLIC WORKSHOP 2015, Geneva, Switzerland Optics Design and Beam Dynamics.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
A. Le comparatif p.234 Comparative constructions are used to compare people or things. Cet hôtel est aussi moderne que l’autre. This hotel is as modern.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Les Vêtements Nom Classe. Pour aller à une boum, je vais mettre… Catalogue/site web : ArticleCouleurTaillePrix Total Euros Total $
Year 10. Bon appetit unit. Introducing ‘en’. ‘en’ – ‘some of it’ or ‘some of them’ ‘En’ is a small but important word in French that is commonly used.
Your team’s name. Préselection file You have just downloaded the preselection file: it’s the first step for you to win the challenge! In this file, you.
Solar rotational stereoscopy The four anaglyphics views in this presentation have been obtained on october 200, 6 and 7, from SoHO EIT 304 A images, at.
Proposals/Propositions Organisation of Union Events together with National Events Members will recall that in recent years, the level of participation.
Sky Calibration January 2011
Slide 1 of Slide 2 of 35.
Slide 1 of Slide 2 of 37.
Aim: learn rules and regulations
Les pronoms démonstratifs
1. Est-ce que Est-ce que, literally translated "is it that," can be placed at the beginning of any affirmative sentence to turn it into a question: Je.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
SPF SANTE PUBLIQUE, SECURITE DE LA CHAINE ALIMENTAIRE ET ENVIRONNEMENT 1.
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
What’s the weather like?. Look at the verb phrase fait-il above Turn it around and you have il fait The phrase Il fait can be used to describe lots of.
© and ® 2011 Vista Higher Learning, Inc.2B.1-1 Point de départ The verb avoir (to have) is used frequently. You will have to memorize each of its present.
Dossier 2 depuis, il y a, pendant, pour. If you are asking a question about the duration of an action that began in the past and still continues in the.
LIU – TCDI. ICL M EETING 4 FEVRIER 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
Play the presentation & note down new vocabulary Complete the activities Le petit déjeuner Breakfast.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
Notes les avril Le conditionnel (The Conditional) À Paris, on parlerait français avec tout le monde. In Paris, we would speak French with everybody.
It’s.  Both C’est and Il est/Elle est can mean it’s.  There are specific times to use each.
Negative sentences Questions
LIU – TCDI. ICL M EETING 28 OCTOBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
Les Adjectifs. What is an adjective? An adjective is a word that modifies a noun by describing it in some way: Shape Color Size Nationality.
PDMS casting station The casting station consist of a spin coater, a dessicator and a hot plate. All instruments are installed in a fume hood. The main.
O WHY IS IT IMPORTANT TO PLAN AHEAD FOR THE FUTURE?
1 Status de l’étude de mesure d’impulsion par MCS Application aux ‘softs’ muons D. Duchesneau Situation actuelle: algorithme de base et vérification avec.
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
Three-Phase Inverters Consider three single-phase inverters in parallel, driven 120° apart.
FD relative displacement measurements A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner, D.Schulte, R.Tomas-Garcia B.Bolzon.
F. Galleazzi EN-ACE-INT 17/05/2017
Frédéric Galleazzi EN/ACE/INT
Où? d’Unité 3, leçon 6.
Les pronoms démonstratifs
Leçon 6 I am what I am or to be or not to be
Interventions BE-BI LS2
- User case - 3D curve length optimization
Interventions BE-BI EYETS 2016/17
North area S. Girod, EATM,
What’s the weather like?
Transcription de la présentation:

LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :

MKDV1 MKDV2+3MKDH QFA518 BSGBlockMasks Dump et Kickers en LSS5 RAPPEL

Crystals Scraper Collimator Detector Absorber Roman Pot Scraper MKDV1 MKDV2+3MKDH QFA518 BSGBlockMasks Dump / Expérience UA9 en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/

Leave the UA9 devices in place: New goniometers with increased aperture Crystals on the dogleg Dumped beam during UA9 data taking will potentially hit the crystal Invert crystals extraction or Invert kicker horizontal deflection under investigation Radiation dose downstream the new dump should not be an issue Move UA9 devices: Remove TCXHW Move crystals (TCPC.51795, TECS.51797, TECS.51799) 60m upstream (at QF.51610) Move absorber (TACW.51998) 60m upstream (at QF.51810) Move detectors and collimator (TCSM.51934, XRPH.51937, BSHV.51991) in between crystals and absorber Leave the devices in the dispersive area in place After each object there is a pair of scintillators and an LHC-type BLM that should be moved with the object Baseline Simone Montesano (EN-STI) Dump / Expérience UA9 en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015

Beam Current Transformers Scraper Ionisation Profile Monitor (H) Beam-beam wire Wire Scanner Ionisation Profile Monitor (V) Wire Scanner Dump / Instrumentation en LSS Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015

Ionisaton profile monitor (H)Leave in PlaceOne MDHW less MDHW+BIPM MDHW ScraperRemoveIncluding Shieldings in & BSHV Linear Wire ScannerMove after QD.519 BWSD Ionisation profile monitor (V)Move after QD.519*One MDVW less MDVW + BIPMV MDVW Rotational Wire ScannerMove after QD.519 BWSRE Beam-beam wire BBLR.51760Remove BBLR.51771Remove BBLRM.51772Move after QD.519 BBLRM.51774Move after QD.519 MDVB.51777Move after QD.519BBLRM compensation Beam Current TransformerMove after QD.519*Separate BCTDC? Aperture to be checked. BCTDC BCTDC BCTFS * UA9 collimator and roman pots will have to be shifted by ~2m downstream (t.b.c.) Dump / Instrumentation en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015

Beam Current Transformers Scraper Ionisation Profile Monitor (H) Beam-beam wire Wire Scanner Ionisation Profile Monitor (V) Wire Scanner Dump / Instrumentation en LSS Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015 X X

Collimators Collimator Test Bench eCloud test bench eCloud Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/

CollimatorMove after QF.516Collimator test stand TCRMP eCloud test benchMove afer QD.117Move to LSS1 MDPH MPDH MDHW MDHW MDHW MDHW CollimatorRemoveUsers not identified BRCV BRCH Move eCloud test bench to LSS1 Reserve space for collimator test stand after QF.516 Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015

Collimators Collimator Test Bench eCloud test bench eCloud Dump / Autres Equipements impactés en LSS5 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ X LSS1

Kickers DumpSEM DumpSEM Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ QDA QFA

Quad QDA.117Replace by QD QFA.118Replace by QFQFA will be used in LSS5 QDA.119Keep KickersRemove MKDVA Will be used for eCloud test bench. Aperture to be checked> MKDVB MKDHA MKDHA MKDHA InstrumentationRemove TFDH TFDV DumpRemove TIDH Replace by passive mask for scraper? TIDV Replace by passive mask for scraper? Vacuum chamber size to be adjusted Actual vacuum sectorisation to be checked Reason of QFA.116 (large aperture Quad) to be checked Dogleg will be removed Aperture for proton and ion injection checked Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/2015

Kickers → MDPH - MDHW (e Cloud) DumpSEM DumpSEM Reconfiguration de la LSS1 Extrait de la présentation d’Etienne Carlier au LIU-SPS Coordination Meeting du 28/10/ QDA → QD QFA → QF X X X X

 Il s’agit d’une première itération, des modifications sont donc possibles…  L’optique doit verifier cette proposition, des calculs d’impédance et d’ouverture faisceau doivent être réalisés…  L’intégration doit vérifier le layout machine en prennant en consideration les demandes du vide impacté par cette nouvelle configuration de la machine… Conclusion