Télécharger la présentation
La présentation est en train de télécharger. S'il vous plaît, attendez
Publié parFoulques Bresson Modifié depuis plus de 10 années
1
DSAC Symposium Paris, 13. December 2013
2
25.09.2012 Source to Database – General Aspects (1) Sources to navigation data and related elements are widespread throughout a wealth of documents, published at different times in different formats and different languages. Even within one country different authorities and providers may publish information Some sources are not public (military, domestic AIPs) PBN requires precise and reliable data. Contrary to conventional procedures, the data houses are not allowed to calculate coordinates for fixes or runway thresholds for RNP or RNP AR approach procedure. State-provided threshold coordinates are required to ensure required integrity levels for PBN compliant operation! Timeliness of publication is extremely critical to onboard Navigation Databases due to the production lead time of nearly 28 days (ICAO Annex 15 Rules) Chart 2
3
25.09.2012 Source to Database – General Aspects (2) AIP AMDT / SUP AIC NOTAM Military AIP Internet (electronic AIP) Chart 3
4
25.09.2012 Source to Database – General Aspects (3) Chart 4 1 procedure – 5 sources to build it! Example: ILS/DME approach RWY 16 LSZH Coding of final and missed approach in LSY FN database:
5
25.09.2012 Source to Database – General Aspects (4) Chart 5 AD 2.24.10.4:AD 2-10:AD 2-14:AD 2-47:ENR 4.4: Procedure ChartRunway dataNavaid dataTerminal WPTEnroute WPT
6
25.09.2012 Step 1: Source Chart 6
7
25.09.2012 Step 2: Data Maintenance Application Chart 7
8
25.09.2012 Step 3: ARINC 424 File Chart 8
9
25.09.2012 Step 4: Packed FMS Data Chart 9
10
25.09.2012 Step 4: Packed FMS Data Chart 10
11
25.09.2012 Step 5: Data loaded in FMS Chart 11
12
25.09.2012Dataflow from source to pilot. Dataflow and reasons for missing data CAA: Aeronautical Information Service Navigation Data House FMS Data Applications Provider End Users LSY FlightNav erroneous/incomplete/late source procedure not codeable Data Quality Requirements DQR different ARINC 424 versions Customer selection System limitation Chart 12
13
25.09.2012 Publication AIP Depuis 2000, on a reçu plus de 700 documents AIRAC de la France CountryPublicationNrYearReceivedEffectiveBefore Effective LFAIRAC05201318-Mrz-1302-Mai-1344 LFAIRAC AD ARR/DEP05201318-Mrz-1302-Mai-1344 LFAIRAC IAC05201318-Mrz-1302-Mai-1344 LFAIRAC VAC05201326-Mrz-1302-Mai-1337 LFAIRAC VAC HELI05201319-Mrz-1302-Mai-1343 LFAIRAC06201316-Apr-1330-Mai-1344 LFAIRAC AD ARR/DEP06201316-Apr-1330-Mai-1344 LFAIRAC IAC06201316-Apr-1330-Mai-1344 LFAIRAC VAC06201322-Apr-1330-Mai-1338 LFAIRAC VAC HELI06201325-Apr-1330-Mai-1334 LFAIRAC07201321-Mai-1327-Jun-1336 LFAIRAC AD ARR/DEP07201310-Mai-1327-Jun-1347 LFAIRAC IAC07201313-Mai-1327-Jun-1344 LFAIRAC VAC07201321-Mai-1327-Jun-1336 LFAIRAC VAC HELI07201321-Mai-1327-Jun-1336
14
25.09.2012 Publication AIP On a reçu les documents 39.5 jours avant la date effective
15
25.09.2012 Modifications temporaire Pas de problème si cest une modifications avec des points ou procédures supplémentaires, ou si cest une modification qui dure plus longtemps quune cycle AIRAC. Exemple: un VOR est hors de service pendant 3 mois et remplacé avec un VOR temporaire.
16
25.09.2012 Modifications temporaire Pas de problème si cest une modifications des points ou procédures existantes, ou si cest une modification qui dure moins quune cycle AIRAC. Exemple: le seuil dune piste est modifiée pour une semaine.
17
25.09.2012 AIP France Nous trouvons toutes les pièces de linformation qui sont nécessaire pour le codage FMS dans lAIP France Sauf…
18
25.09.2012 AIP France Déclinaison magnétique des stations VOR
19
25.09.2012 La déclinaison magnétique est utilisée pour construire la trajectoire de la procédure dans le FMS Une différence dune dégrée peut déplacer la trajectoire pour 0.3nm Trajectoire officielle Trajectoire volé
20
25.09.2012 Exemples of Source Circle to land vs. Straight In
Présentations similaires
© 2024 SlidePlayer.fr Inc.
All rights reserved.