Meeting 2015#13 Linac4 Coordination of Installation Schedule follow-up 2015-07-06 EDMS 1523405 J. Coupard EN-MEF1 week 28.

Présentations similaires


Présentation au sujet: "Meeting 2015#13 Linac4 Coordination of Installation Schedule follow-up 2015-07-06 EDMS 1523405 J. Coupard EN-MEF1 week 28."— Transcription de la présentation:

1 Meeting 2015#13 Linac4 Coordination of Installation Schedule follow-up 2015-07-06 EDMS 1523405 J. Coupard EN-MEF1 week 28

2 General Information Layout Database version 1.0 - in progress Ventilation in the faraday cage Integration Laser profile meter 50/100 MeV – in progress Water cooling system for RF structures in underground ? 2015-07-06 EDMS 1523405 J. Coupard EN-MEF2

3 General Information Integration Installation Non Conformities: 2015-07-06 EDMS 1523405 J. Coupard EN-MEF3 INC DTL15233732015-06-29 Les manifolds de refroidissement des DTL 2 et 3 ne sont toujours pas intégrés, alors que ceux du DTL3 sont en place. Les manifolds du DTL1 sont eux présents dans l'intégration, mais devront etre mis a jour « as-built ». En considerant les memes dimensions et « empatement », les manifold du DTL2 ne pourront pas etre installés, mais ca reste une supposition vu qu'on ne les a pas dans l'intégration. INC beam Loss Monitors 15232112015-06-26 Les supports des BLM dans la tunnel principal ont été installés. Certains genent le reste de l'installation et devront etre demontés et remontés seulement en fin d'installation. D'autres ne sont pas correctement positionnés. Enfin, tous doivent être « retaillés » comme cela avait été convenu, afin de minimiser l'emprise sur l'environnement voisin et sortir des zones réservées, notamment la zone transport. INC Electricite 400-1-001 15090642015-05-05 Le convertisseur RPZEW01 ? n'a pas été installé à l'endroit prévu, soit dans la continuité des autres convertisseurs (RPZEW02 et 03). De plus, l'intégration n'a pas été consultee pour valider cette position. Enfin, il apparait que les 3 convertisseurs sus-nommés sont bien plus longs que initialement prevu (plan SPLEY___7001 indice C). a noter egalement que dans la derniere version de ce meme plan, le convertisseur en question ne figure plus. INC Charpente 410-U0-002 15019152015-03-31 La passerelle au-dessus des guides d'ondes des PIMS presente plusieurs points non conformes ne rendant pas possible l'installation des points fixes RF au sol. Les 'portiques' 2,8 et 10 doivent etre deplacés en conséquence, soit de manière symmetrique par rapport à l'axe de la ligne RF, materialisée au sol (voir exemple photo page 3) 2 ? A décaler de 25mm vers la gauche 8 ? A décaler de 25mm vers la droite 10 ? A décaler de 25mm vers la gauche

4 General Information Survey: Realignment Realignment of the RFQ Estimation of the tolerance of realignment before disconnection is mandatory: 2015-07-06 EDMS 1523405 J. Coupard EN-MEF4 ContactDéplacement TiltDéplacement VerticalDéplacement Radial Responsable / remplacantDT [mrad]DV [mm]DR [mm] VIDEJan Hansen+/- 0.7 +/- 1 mm with respect to nominal free length. Nicolas Taus LEBT RFQCarlo Rossi 0 0 0 Vladimir Bretin MEBT DTLSuitbert Ramberger 0 0 0 Jean-Michel Giguet CCDTLFrank Gerigk 0 0 0 Jean-Michel Giguet PIMSRolf Wegner 0 0 0 Jean-Michel Giguet DebuncherFrank Gerigk

5 General Information Connection of the RF structures DTL, CCDTL and PIMS 2015-07-06 EDMS 1523405 J. Coupard EN-MEF5

6 General Information Progress https://espace.cern.ch/coordination-installation-linac4/Pictures/Forms/AllItems.aspx Consolidation of the survey equipment on supports of the transfer line – in progress : installed by the end of July DSO Tests to be scheduled Tests of the new RF maintenance mode Tests for the 50 MeV beam commissioning Missing ok from : Beam stopper (Damien) RP monitors (Joachim et Vincent) Power converter (David et Julien) 2015-07-06 EDMS 1523405 J. Coupard EN-MEF6

7 General Information Progress Commissioning of the magnet (minutes EDMS 1508939)EDMS 1508939 Follow-up : linklink 2015-07-06 EDMS 1523405 J. Coupard EN-MEF7 Beam Commissi oning (MeV) Test bench (MeV) Parent equipment CIRCUIT_NA ME Magnet NamePositionPC NameRack Name Attestation de 1ere etape de consignation Magnet/klyst ron/source Status Cable StatusMALT Power Converter Status WIC testTests of the cables Preliminary tests of the PC Commissioning 3 MEBTL4L.RCH.311L4L.MCHV.31053105RPZEO.400.L4L.RCH.311RYZCT02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RCV.311L4L.MCHV.31053105RPZEO.400.L4L.RCV.311RYZCT02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQD.311L4L.MQD.31103110RPZES.400.L4L.RQD.311RYZCR01Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.321L4L.MQF.32103210RPZES.400.L4L.RQF.321RYZCR01Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQD.331L4L.MQD.33103310RPZES.400.L4L.RQD.331RYZCR01Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.341L4L.MQF.34103410RPZES.400.L4L.RQF.341RYZCR02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.351L4L.MQF.35103510RPZES.400.L4L.RQF.351RYZCR02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQD.361L4L.MQD.36103610RPZES.400.L4L.RQD.361RYZCR02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.371L4L.MQF.37103710RPZES.400.L4L.RQF.371RYZCR03Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQD.381L4L.MQD.38103810RPZES.400.L4L.RQD.381RYZCR03Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RCH.381L4L.MCHV.38353835RPZEO.400.L4L.RCH.381RYZCT02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RCV.381L4L.MCHV.38353835RPZEO.400.L4L.RCV.381RYZCT02Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.391L4L.MQF.39103910RPZES.400.L4L.RQF.391RYZCR03Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQD.401L4L.MQD.40104010RPZES.400.L4L.RQD.401RYZCR04Condamnéinstalledready commissionedyescommissionedyesnot commissioned 3 MEBTL4L.RQF.411L4L.MQF.41104110RPZES.400.L4L.RQF.411RYZCR04Condamnéinstalledready commissionedyescommissionedyesnot commissioned 12 DTL1L4D.RCH.021L4D.MCHV.0205205RPZEQ.400.L4D.RCH.021RYZCS01A19811installedready commissionedyescommissionedyesnot commissioned 12 DTL1L4D.RCV.021L4D.MCHV.0205205RPZEQ.400.L4D.RCV.021RYZCS01A19811installedready commissionedyescommissionedyesnot commissioned 12 DTL1L4D.RQF.021L4D.MQF.0210210RPZES.400.L4D.RQF.021RYZCR05A19811installedready commissionedyescommissionedyesnot commissioned 50 DTL2L4D.RCH.031L4D.MCHV.0305305RPZEQ.400.L4D.RCH.031RYZCS01A19811not installednot ready installednonot commissionednonot commissioned 50 DTL2L4D.RCV.031L4D.MCHV.0305305RPZEQ.400.L4D.RCV.031RYZCS01A19811not installednot ready installednonot commissionednonot commissioned 50 DTL3L4D.AC.03L4D.ACDT.0325325RPZEF.400.L4D.AC.03RYZCK04A19851installedready commissioned not commissioned 50 intertank DTL-CCDTLL4C.RCH.011L4C.MCHV.0105105RPZEQ.400.L4C.RCH.011RYZCS01A19811not installedready installedmagnetnot commissionedyesnot commissioned 50 intertank DTL-CCDTLL4C.RCV.011L4C.MCHV.0105105RPZEQ.400.L4C.RCV.011RYZCS01A19811not installedready commissionedyesnot commissionedyesnot commissioned 50 intertank DTL-CCDTLL4C.RQF.011L4C.MQF.0110110RPZES.400.L4C.RQF.011RYZCR05A19811installedready commissionedyesnot commissionedyesnot commissioned 10050CCDTL1L4C.RQD.021L4C.MQD.0210210RPZES.400.L4C.RQD.021RYZCR05A19811not installednot ready no electronicsnonot commissionednonot commissioned 10050CCDTL2L4C.RCH.031L4C.MCHV.0305305RPZEQ.400.L4C.RCH.031RYZCS02A19811not installednot ready installednonot commissionednonot commissioned 10050CCDTL2L4C.RCV.031L4C.MCHV.0305305RPZEQ.400.L4C.RCV.031RYZCS02A19811not installednot ready installednonot commissionednonot commissioned 10050CCDTL2L4C.RQF.031L4C.MQF.0310310RPZES.400.L4C.RQF.031RYZCR06A19811not installednot ready no electronicsnonot commissionednonot commissioned 10050CCDTL4L4C.RCH.051L4C.MCHV.0505505RPZEQ.400.L4C.RCH.051RYZCS02 A19811 not installed ready (test bench 50MeV)readyinstalledmagnetnot commissionednonot commissioned 10050CCDTL4L4C.RCV.051L4C.MCHV.0505505RPZEQ.400.L4C.RCV.051RYZCS02 A19811 not installed ready (test bench 50MeV)readyinstalledmagnetnot commissionednonot commissioned

8 General Information Follow-up on DTL 2015-07-06 EDMS 1523405 J. Coupard EN-MEF8 27.1024.1108.1212.0119.0123.0202.0316.0313.0420.0427.0417.06 DTL3 02.02 +2wk 15.02 +2d 17.02 +2wk 06.03 +1wk 13.03 +1wk 20.03 +1.5wk 31.03 +2wk 13.04 installed DTL2 30.04 +2wk 15.05 +2wk 01.06 +2-3wks TBC 15-20/06 25.06 NCs on DT magnets Issue on stabilization More tests are needed +2wk on the Master Schedule Segments not fully closed in the central seal Verification of the PMQ Leaks on post- couplers and end- covers Delay for the machining of the end covers at the workshop +2wk on commissioning 50 and 100 MeV Delay in the main workshop +2-3wks on commissioning 50-100 MeV TO BE STUDIED in order to re-gain this time. Leak

9 General Information Follow-up on PIMS – readiness for tuning before installation 2015-07-06 EDMS 1523405 J. Coupard EN-MEF9 26.01 02.02 +/- 5mo 02.03 No change 06.0404.0501.0606.0703.0807.09 PIMS 1 B 01.11.1401.04.15 Installed PIMS 12 M 01.12.1401.04.15 Installed PIMS 11 L 15.03.1501.04.15 Installed PIMS 10 K 15.04.1501.09.15 01/09/2015 n.4 15.05.1501.10.15 01/10/2015 n.5 15.06.1501.11.15 01/11/2015 n.6 15.07.1501.12.15 ? 01.12.2015 n.7 15.08.1501.01.16 ? 01.01.2016 n.8 15.09.1501.02.16 01/02/2016 n.9 15.10.1501.03.16 01/03/2016 n.10 15.11.1501.04.16 01/04/2016 n.11 15.12.1501.05.16 01/04/2016 Debuncher 01/06/2016

10 Follow-upSurface 2015-07-06 EDMS 1523405 J. Coupard EN-MEF10

11 Follow-up 3-12 MeV area 2015-07-06 EDMS 1523405 J. Coupard EN-MEF11

12 Follow-up 50-100-160 MeV area 2015-07-06 EDMS 1523405 J. Coupard EN-MEF12

13 Follow-up Transfer line area 2015-07-06 EDMS 1523405 J. Coupard EN-MEF13

14 AoB 2015-07-06 EDMS 1523405 J. Coupard EN-MEF14