2 Agenda Introduction & Actions follow-up New projects
B275 B216 Pump room sharing status Alice O2 project status Consolidation requests New projects LHCb project ADAM request HELIOS magnet Works Status Report Office Space Status Report Storage Requests Status Report AOB 14 Jan 2016 SPOB Meeting

3 Actions follow-up B275 Priority 3 Declassified
Nearly ready for measurements Priority 1– Declassified within 2 weeks Declassified Priority 3 Declassified 14 Jan 2016 SPOB Meeting

4 Actions follow-up B216 Sharing the pump room with the Staff Association clubs
Meeting with Rachel Bray (CCC) to find alternative solutions: Globe; Meeting with Bernard Pellequer this Friday Salle pas perdus; Club Area in Meyrin for students parties proposed by the SA; Ideasquare; Agreement with Markus to contact him in case of need; No student party there Presentation to the GTPE postponed to February. 14 Jan 2016 SPOB Meeting

5 Actions follow-up ALICE O2
Follow – up presented during the last GTPE meeting; Update of the IPP document to be sent to Frederic. 14 Jan 2016 SPOB Meeting

6 Actions follow-up EP Consolidation requests
Building Floor Group/Exp Description Comments 16 DT Toilets blocks to be checked - Bad smell Renovation planned in 2016 but urgent Blinds to be changed 17 20 Ceilings and walls are wet in all offices In front of the main entrance the hydrants evacuation has to be repaired Concrete and paint around the windows disintegrates due to water penetration Urgent - unhealthy mould & mildew spreading in the air recirculation of the design office 25 R-104 Wood Frame of windows rotten and leaking 102 R-024 The door has to be repaired R-016 The blinds have to be changed Update of the global maintenance programme HVAC + elec 108 The windows with a compressed air system in the roof of the building are leaking Urgent - the water falls on the machines Poor lighting conditions, need upgrade 155 R-047 False sealing broke and open, humidity stains 164 Lighting maintenance required - half of the lights are not functioning anymore 166 Although the roof has been repaired the roof is leaking again R-208 The concrete at the entrance of this buidling is irregular and fills with water and mud in rainy days 168 Concrete floor to be repaired at the entrance of the building 275 ISOLDE Heating and roof consolidation Urgent - the water falls on the machines in the lab 505 CMS Toilets blocks to be renovated 51 1 LCD Poor thermal and accoustic isolations Offices very cold in winter and hot in summer + large direct holes between the offices 301 ALICE Sanitary blocks to be changes, clogged toilets 160 161 Water leaks from the roof Cracks in walls Afteer measurements, improvement of the ventilation and air quality 23 Installation of shutters or blinds in offices 004, 006, 012, 016, 020, 022, 024, 028, 030, 032, 034 Reflection of the sun from the windows of B15 153 Heating system to be reviewed Isolation and level of noise to be checked Many thanks for your feed-back ! 14 Jan 2016 SPOB Meeting

7 LHCb Project Farm PC at Point 8
The existing LHCb event-filter farm is located in the UX85A underground area. As cooling and electrical power are limited to approximately 500 kW and the floor space cannot be increased significantly, the construction of a new data centre at the surface is required for the LHCb upgrade. The LHCb upgrade, scheduled for installation during LS2, will enable the experiment to read out data at 40 MHz into a purely software-based trigger. 14 Jan 2016 GTPE

8 LHCb Project Farm PC at Point 8
In terms of infrastructure, three options are being considered: purchasing a modular (container-based) data centre from a commercial supplier (Participating with ALICE in the MS and IT process), accommodating the data centre in an existing building at Point 8 (e. g. the SX8 hall), constructing a new industrial building at Point 8 dedicated to the data centre. In order to determine the most cost-effective solution, the feasibility of the different options and the estimated costs for civil engineering, site management, electricity, and cooling should be also evaluated; The expected delivery date is Mid-2018. First budget allocation already in EP MTP ( ) 14 Jan 2016 GTPE

9 LHCb Project Farm PC at Point 8
3 potential options: A container-based modular data centre could for example be located on the current main parking lot (item 2; Fig.1) or behind building 3852 (item 3; Fig.1) Figure 2 shows how about 80 racks fit on the groundfloor of the SX8 building (item 1), which is sufficient to accommodate the initial stage of the upgrade farm and the IT equipment currently located in room 2885/R-007. The potential locations for a new building to house the data centre ( m2) are essentially the same as for the containerised option ( m2). Fig. 1 Fig.2 14 Jan 2016 GTPE

10 LHCb Project Farm PC at Point 8
IPP Document prepared; SPOB presentation GTPE presentation In order to get a first estimated amount for each option; decide which option is validated and start the work … 14 Jan 2016 GTPE

11 ADAM Project Additional Offices Request
ADAM SA (Application of Detectors and Accelerators to medicine) is a CERN spin-off based inside CERN; ADAM Company was founded in Dec 2007 by a private investor (A. Colussi) to develop, build and test accelerators for medical applications; Between 2008 and 2010 ADAM has built one unit of a linear accelerator (called LIGHT) for protontherapy, two small accelerators for conventional radiotherapy and one dosimeter (based on CMS silicon detectors) to monitor the dose delivered to the patient during conventional radiotherapy; In 2013 the UK company AVO bought ADAM, now involved in the construction of the full LIGHT accelerator, Since 2007 ADAM has signed several collaboration agreements with CERN, the last two related to the use and manufacturing of the 750 MHz RFQ designed and built by CERN; ADAM at CERN is under BE departement responsibility. 14 Jan 2016 SPOB Meeting

12 ADAM Project Additional Offices Request
40 people involved in the construction of a 230 MeV linear accelerator for protontherapy At CERN only 90 MeV will be tested 14 Jan 2016 SPOB Meeting

13 ADAM Project Additional Offices Request
14 Jan 2016 SPOB Meeting

14 ADAM Project Additional Offices Request
14 Jan 2016 SPOB Meeting

15 ADAM Project Additional Offices Request
Project to be approved by the GTPE; MS and AO to be launched by GS Department ; 3 years renting period; B892 offices to be given back to EP department 14 Jan 2016 SPOB Meeting

16 ISOLDE Project HELIOS Magnet Space Request
14 Jan 2016 SPOB Meeting

17 ISOLDE Project HELIOS Magnet Space Request
Shielding Footprint 14 Jan 2016 SPOB Meeting

18 ISOLDE Project HELIOS Magnet Space Request
Potential location B180 not yet confirmed by ATLAS 14 Jan 2016 SPOB Meeting

19 EP Works Status Report 14 Jan 2016 SPOB Meeting Bat Et Bur
Type travaux Bénéficiaire Expérience Pilote Commentaires état 1 025 Installation salle vidéo-conf PH En attente 2 021 Installation de stores LHCb 11 R 011 Peinture ALICE G. Martin 13 020 160 401 Modif éclairage, ajout prises et chauffage Burotel 186 E23 Agrandissement sas salle propre PH-DT Silicon Facilities 256 Consolidation énergétique GS Nouveau groupe froid, isolation extérieure 354 001 CMS 510 018 DG-CO-CO 595 022 27 Installation réseau eau glacée + clim Suivi du chantier d'installation clim E. Auffray En cours 162 S Peinture, résine sol 203 Porte bois Porte extérieure 254 Remplacement escalier extérieur R. De Oliveira 275 Revêtement de sol ISOLDE Fabrication et Installation plans de travail 892 A04 Réhabilitation (électrique, cooling, peinture) NA61 Mise à la terre sol antistatique PH-ESE Etude 15 12 Ouverture paroi pour installation porte 61 Réfection du User's Office PH-UO Sol, Peinture, Mobilier, Eclairage 102 Création abris pour containers chimiques 153 32 D. Piedigrossi 154 Système extraction air vicié Local de collage PA. Giudicci BB5 Installation porte + paroi ATLAS 4 Cloisonnage parois coupe-feu PH, HSE Sécurité incendie Projet 40 SS C IT D Projet regroupement activités cooling aimants PH, GS 42 Installation xpelair + réglette électrique Terminé 017 Tuyauterie 20 052 051 25 C22 Climatisation Salle de réunion, changement de l'ancienne climatisation 58 016 PH-DI-SO Démontage escalier intérieur 301 027 Peinture mur + couloir Secrétariat 029 Peinture + sol anti-statique Labo EP Works Status Report 14 Jan 2016 SPOB Meeting

20 Office Space Status Report
No B Description Status 1 186/R TOTEM needs a 70 / 80m2 space for moving a currently located laboratory in B186/R to be allocated to CMS – Present lab in a shared space with CMS In progress 2 226 This space is currently used by DIRAC. What is the status of the experiment? Can the space be reallocated? 3 591 Space reallocation from ICARUS to ATLAS 4 24 HSE Unit expressed their need for 3 additional offices near B24 for a 6 months-period starting from now. 2 Offices could be ok if they rearrange the meeting room into offices. Could ALICE lend 2 offices near B24 for 6 months? Solved – Thanks to ALICE for their help! 5 904 PC storage (Spare for Point 5) to be moved. 50m2 to be found. New request 6 14 Request for an office (Maurice Glaser EP/DT group) around 15m2 in the buildings area 14 Jan 2016 SPOB Meeting

21 Office Space Status Report
14 Jan 2016 SPOB Meeting