CoRoT S.C. - 24/09/07 - S.Chaintreuil Production N0/N1/N2 Status of current software Proposed evolutions foreplanned production
CoRoT S.C. - 24/09/07 - S.Chaintreuil 2 Status of current software All N1 products are able to be produced (except exo imagettes) Initialization data auxiliary products : windescriptor, templates, masks high resolution PSF surfaces de correction Common products datation (OBT, GPS) orbit_events, ephemeris N1 seismology products offset, backgrounds, light curves, imagettes N1 exo products offset, backgrounds 32s et 512s, chromatic et monochromatic light curves, 32s et 512s, (imagettes) Outliers are removed in offset and background data V1.0 : Outliers are « marked » and SAA informations are inserted into star light curves V1.1 : SAA informations are inserted into star light curves and outliers are replaced using method 2 (médiane ou moyenne glissante)
CoRoT S.C. - 24/09/07 - S.Chaintreuil 3 Two types of N1 products N1 for « alarm » offset corrections Background corrections using « median background light curves » calculated as the median of similar background light curves (will be implemented for LRa01) No jitter corrections, no outliers corrections N1 for N2 current version (1.0) offset corrections, background corrections (bright pixels not removed), jitter corrections, SAA flag inserted, outliers marked version 1.1 (if required) offset corrections, background corrections (bright pixels not removed), jitter corrections, SAA flag inserted, outliers marked Version 2 : will probably use new modules processing the whole run 1 or 2 softwares ? still in discussion
CoRoT S.C. - 24/09/07 - S.Chaintreuil 4 Production Currently, all N1 products are generated at LESIA N1 products for alarm will be produced at CNES (04/2008) or at LAM N1 products for N2 will be produced at LESIA then at CNES (when/if methods are stable) N2 products will be generated at LESIA
CoRoT S.C. - 24/09/07 - S.Chaintreuil 5 Calendrier introduire les corrections de pixels brillants sur les fonds de ciel pour les 4 premiers runs fin septembre produire des N1 exo au fil de leau en vue de la détection des alarmes au LAM dès le début de LRa01 distribuer une première version des données N2 des 2 voies de IRa01 début décembre distribuer une première version des données N2 des 2 voies de SRc01 début janvier préparer lintroduction des corrections de long terme dans la chaîne de production des N1 en vue des N2 mars-avril 2008
CoRoT S.C. - 24/09/07 - S.Chaintreuil 6 Planning