Injectors de-cabling Project General information June 2017 INDICO:

Slides:



Advertisements
Présentations similaires
1. Les structures de documentation pour la division ST. 2. Les types de document dans la division ST. 3. Linterface informatique. Lundi 8 Mai 2000 ST Quality.
Advertisements

Civil engineering for LIU – PS
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
Objectif: Comment employer un exposant?. Objective: How to use an exponent?
BENCHMARK JOBS Marie-Laure Rivier – January 2015.
A PROJECT CO - FUNDED BY THE EUROPEAN UNION Integrated Management of risks & environment in port cities Progress meeting – Taranto 12th-15th September.
Les pronoms démonstratifs
La Date continued Les jours de la semaine (the days of the week)
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL Emmanuel SAID BE-CO 20/11/2015 General De-cabling Project Meeting #5.
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/04/28.
EN TSO Workshop nd June 2016; 14th June 2016; 30th June 2016 Purpose: Share a common vision amongst the EN safety actors Involve the TSOs in defining.
EHN1 Extension Bilan période 4 au 15 juillet... et future période 15 aout au 6 sept. ! 59th EAs integration meeting - EHN1 extension / 17th EHN1 detector.
EHN1 Extension Organization after the handover 5 September 2016 G. Cumer EN/ACE.
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
To Do (A Faire)
LES QUALITES DU MANAGER.
DIFFERENTIATION NO ONE CAN COMPEL A STUDENT TO LEARN. (MEIRIEU)
STAGE DE SECONDE DATES (A VENIR).
Laurent : Madame Michaux est ma prof d’espagnol, elle est intéressante
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 2nd June 2016.
De-cabling strategy during YETS August 2017
EN TSO Workshop nd June 2016; 14th June 2016; 30th June 2016
ACTSR MEMBERS GENERAL MEETING 8 JUIN 2017 BOBST factory: Mex, Laussane
Informations fin de 1ère session - Masters
Activités LHC pour BE/ICS Systèmes d’Alarmes YETS et LS2
Decabling Project Overview Mandate, organisation, general planning, coordination, safety PSB/PS/TT2 EYETS 2016–2017 coordination meeting, 22 sept 2016.
Quiz/composition: Lundi 20 Avril
Point de départ You have learned the uses of the passé composé versus the imparfait to talk about things and events in the past. These tenses are distinct.
Y2 Spring 1 Vocab Les 12 mois de l’année janvier
Djibouti is the only francophone country on the eastern coast of Africa. The capital of Djibouti is Djibouti.
Activités EN/EL-FC EYETS16-17
L’heure (Time) Quelle heure est-il? Il est une heure (it’s 1:00)
Cours Management de la Qualité.
Lundi 2 octobre Français II
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
Math: La semaine de Jan 15th
Les nombres.
La comptine des mois.
« Chargés de consignation » & projet de-câblage
Rapport de la Fondation du district 7790
Résultats de la 1ere session - Bacheliers
TE-EPC internal review of the ELENA project
Introducing the words for the numbers
Leçon 4 La Date.
Voyage à Plymouth 2017.
The consequences of the.
ITE in the continuum of Teacher Education
Six months after the end of the operations
Im erin from octevaw and we want to make a proposal for a collaborative project with the bbw.
Les jours de la semaine (the days of the week)
Days of the week and seasons Jours de la semaine et les saisons
Notice to All Owners A town hall meeting will take place at the clubhouse Wednesday December 13 at 7:00 p.m. Come and share your views on the question.
Days of the week and seasons Jours de la semaine et les saisons
Bshare – optimisation des processus de gestion documentaire
Quelle est la date aujourd’hui?
 were generally much smaller in size than the 2nd and 1st generation computers. This is because these newer computers made us of integrated circuits.
Mercredi 12 décembre Français II
Vocabulaire les jours de la semaine
BRMS Implementation Status Update Template designed by 18-July-2015.
le Jeudi 11 Avril 2019 toute la journée et
4C Telling Exact Time.
Lundi 16 avril Mardi 17 avril Français I
Safety Talk EN DSO & EROS
Assemblée générale annuelle
Français I – vendredi le 20 octobre horaire quotidien
Les Nombres - Starter
DANGER DANGER FRONT BACK
Ombudsman, Integrity, and Resolution Office (OIRO)
Transcription de la présentation:

Injectors de-cabling Project General information 29 June 2017 INDICO: 644834 A. Berjillos on behalf of G. Cumer, EN/ACE/OSS

Injectors de-cabling Project Project ONGOING Same methods Same Sharepoint Dedicated share point : https://espace.cern.ch/Injector-De-Cabling-Project/SitePages/Home.aspx 29/06/2017

Master schedule Approved by the management in the annual review 19th April 2017 ( Indico) 29/06/2017

Link persons et chargés de consignation 29/06/2017

Organization of the project, meetings Réunion team projet (EN/ACE – EN/EL – HSE ) : tous les lundis de 14h à 15h _ salle (à definir). À partir de September Réunions Générales de projet : un vendredi sur deux de 9h30 à 11h _ salle (à definir). Réunion de démarrage en September 29/06/2017

Contact persons, documentation and links Gerard.cumer@cern.ch Lucia.maricalva@cern.ch (always on CC) Aurelio Berjillos (phone number: 167850) INDICO: 6591 Project Management Plan : EDMS 1686408 EDMS: CERN-0000167856 Sharepoint: Injector De-cabling project Minutes on EDMS: CERN-0000168555 29/06/2017

Bonne continuation !