MINnD – bSI C.CASTAING/P BENNING InfraRoom IFC 5 for 2020 Forum français de l’OGC Journée Interopérabilité et Innovation 7 Novembre 2017 MINnD – bSI C.CASTAING/P BENNING
Les activités d’extension des standards pour les infrastructures touchent tous les domaines des infra: - Des contraintes environnementales aux objets connectés.
Infra Room perspectives Environmental Rolling systems Connected Systems buildings roads Rails structures TC 242 TC 239 IFC GML RTML De ce fait le scope des Infrastructures telles que: - une infrastructure routiére, ou un infrastructure ferroviaire, ou une infrastructure fluviale Veut dire : un aggrégat d’objets hétérogènes tels que: Génie civil linéaire Industriels Des structures Des objets connectés Mais aussi l’environnement Veut dire des normes multiples MINnD – bSI C.CASTAING/P BENNING
InfraRoom activies 2017 - 2020 2020 How to manage these challenges: Technical In time 2017 Who to manage these topics: geology Hydraulical Noise analysis Network topology Comment se structure la roadmap: Une roadmap commune bSI, OGC, RTM/UIC à l’horizon 2020 à la demande des maitres d’ouvrages Ce qui génère les challenges suivants: Maitrise du scope : jusqu’où va l’horizon d’un projet d’infrastructure Un projet d’infrastructure comprend tous les éléments de la roadmap Mettre des interfaces nécessaires : géologie, hydrolique, etc… Maitrise des délais: Avoir les expertises disponibles pour mener de front ces travaux. Technical Report: Infra Asset Management White paper: Integrated Digital Built Environment 2017 LONDON – C.CASTAING Source: InfraRoom (2017). InfraRoom Project Program 2017 - 2019
MINnD – bSI C.CASTAING/P BENNING Infra Room roadmap L’organisation du projet Infraroom: Les fondements avec IFC alignment : en phase d’implémentation Des bases communes de développement et un langage commun avec : IFC overall architecture et les IFC 4.1 Établir la taxonomie de chacun des projets pour vérifier ! Ce qui est propre au projet Ce qui est développé en commun pour tous les projets MINnD – bSI C.CASTAING/P BENNING
MINnD – bSI C.CASTAING/P BENNING IFC 5 L’approche commune pour tous les projets: Data dictionnary : properties, attributes and object types Requirements specification A taxonomy and WBS Implementation and experiments MINnD – bSI C.CASTAING/P BENNING
Common schema road and rail Base de travail : vérification à partir du Schema IFC rail développé par CRBIM alliance : - rail - schema commun
Common schema road and rail Base de travail : vérification à partir du Schema IFC rail développé par CRBIM alliance : - approche object type - definitions
Common schema rail Base de travail : vérification à partir du Schema IFC rail développé par CRBIM alliance : - proposition d’un nouveau schema conceptuel
MINnD – bSI C.CASTAING/P BENNING IFC Bridge Data dictionnary : 2000 properties and attributes First draft of schema specification A taxonomy Viaduct in IFC4.1 including alignment ( test file). L’exemple IFC bridge MINnD – bSI C.CASTAING/P BENNING
MINnD – bSI C.CASTAING/P BENNING IFC Bridge A taxonomy MINnD – bSI C.CASTAING/P BENNING
MINnD – bSI C.CASTAING/P BENNING Some major Issues Big players are here: New projects IFC Bridge is working IFC rail is starting IFC roads is starting In starting blocks : IFC tunnel, IFC Waterway and Harbours IFC rail Estimate to be developped : 5.5 millions € Estimate of the Budget for project in progress : over 8 millions of Euros Des projets de plus en plus importants financés par les MOA Exemple : IFC rail MINnD – bSI C.CASTAING/P BENNING
MINnD – bSI C.CASTAING/P BENNING IFC Rail MINnD4rail Funding in two steps : already 250 000 € ready for the first step 6 000 000 € final step CRBIM Alliance specs part 1 and part 2 investigated by stakeholders Technical project plan to be completed on november 4 common working groups: Alignment, Power supply, Signaling and interlocking, telecom Kick Off meeting in China on january. MINnD – bSI C.CASTAING/P BENNING
Asset management et l’ingénierie système Le rapprochement des approches : bSI et MINnD: Le rapport illustre l’apport de l’ingénierie système pour décrire les besoins du facility management. Mais aussi dans les approches de l’organisation des modèles: Organisation spatiale et vision fontionnelle, management des exigences. MINnD – bSI C.CASTAING/P BENNING
Other projects :Linked Data for Infra Exchange format : to collaborate with OGC and the Technical Room in the creation of InfraGML- OWL, and connect it to IFC-OWL Developping a Proof of Concept of Linked Data for Infrastructure based on Use cases and example projects. MINnD – bSI C.CASTAING/P BENNING
Joint OGC / bSI White Paper Approved by OGC TC and bSI Standards Committee Integrated Digital Built Environment Work result from: Nottingham Sep 2015 (pre-meeting) London Nov 2016 Paris Apr 2017 Les travaux communs OGC – bSI : IDBE Integrated Digital Built Environment MINnD – bSI C.CASTAING/P BENNING
Integration/interoperability APPROACHES / FRAMEWORK (4 levels): Formalising and relating modelling techniques Joint conceptual model Linking of conceptual models Instance linking MINnD – bSI C.CASTAING/P BENNING
Governance – organisation structure OGC bSI Documents 1 Executive M Reichardt R Petrie MOU 2 Planning committee leads B De Lathouwer R Kelly White paper (joint charter document) Framework model Planning committee members D Mackenzie P Scarponcini S Simmons C Roensdorf C Castaing A Kemp J Plume P Jackson 3 Project Development leads Roadmap / Use case / Aspect matrix MINnD – bSI C.CASTAING/P BENNING
BIM level 3 perspectives IFC 5 plus les autres composantes : les objectifs du BIM level 3 2025