S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

Slides:



Advertisements
Présentations similaires
Promoting creativity in French lessons using storytelling with year 7. Alice Ayel.
Advertisements

Aire d’un parallélogramme
How to play Divide class into 2 teams Teams take in turns to pick a number, read the word aloud & identify the word class and decide if they want to keep.
Le sondage LibQUAL à HEC Montréal Une première expérience réussie qui sintègre au processus de planification stratégique de la bibliothèque Le sondage.
1 La bibliométrie pour l'évaluation stratégique des institutions de recherche : usages et limites Indicators for strategic positioning of the research.
Primary French PowerPoints What’s Your Name?.
Revenir aux basiques !. 1 Revenir aux basiques Processus Nécessité daméliorer la Maîtrise les Offres et Projets: lanalyse des causes racines montre un.
Quelle est la date aujourd’hui ?
To use this resource, make sure you view the slideshow, not just open the file. You can learn a slide off by heart, then test yourself on the next slide.
interaction in the .LRN platform
Unité 3 Au café. What can you say instead ofÇa va? Comment vas-tu? Comment vas-tu? This is INFORMAL. This is INFORMAL. Use Comment allez-vous? if you.
Time with minutes French II Le 30 Octobre.
Le livre de français – pg 107 David: Jen ai marre! Jai une heure de chimie le lundi, deux heures de physique le mardi et deux heures de biologie le samedi.
Status report SOLEIL April 2008
Repair of the Aortic dissection with surgical glue. P Menu, T Sais, P Corbi, M Rahmati, C Jayle, JM Charrière.
Procédure dappel Appeal process 1(c) RISS / IJHS, 2012.
Reading an analog clock
Defence R&D Canada R et D pour la défense Canada Novel Concepts for the COP of the Future Denis Gouin Alexandre Bergeron-Guyard DRDC Valcartier.
Aller* + infinitif. Jaime regarder la télé après les cours. Ma mère déteste préparer le dîner. Mon père naime pas laisser de pourboire. In French, when.
Risk analysis : - Splitters replacement - TCSC replacement WG TDC2/TCC2 18 th June 2013 E. HARROUCH EN/MEF.
What are activity are the people doing? Danser Chanter.
Quelle heure est-il? Le But: Je peux dire l’heure
9e Année - Français Cadre
Handy Verbs Close Future Tense With the Angry Family Going to.
1 of of 40 UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS.
Fire prevention in Luxembourg Performance based fire prevention (Project of Fire engineering Guidelines) Guy Weis Service dIncendie et dAmbulance de la.
Talking about the things you do
1 La promotion de la santé ancrée dans la loi Le mandat de Promotion Santé Suisse est ancré dans la loi fédérale du 18 mars 1994 sur lassurance maladie.
Magnets fiche projet / project sheet IAFACTORY THE MAGNETIC FACTORY magnets. IAFACTORY | conseil en architecture de linformation | |
TortoiseSVN N°. Subversion : pour quoi faire ? Avoir un espace de stockage commun – Tous les étudiants du SIGLIS ont un espace svn commun Partager vos.
Les choses que j aime Learning Objective: To know how to use j aime to talk about things I like to do.
Lundi onze novembre on va réviser pour une évaluation ( )
1) Expliquez les 2 règles concernant le négatif ! 1) 2) 3) Tu as fini les 2 conjugaisons au négatif? Montrez-les à votre partinaire et répondez à la liste!
Learning objectives Learn how to cancel and re-arrange meetings
Déjeuner du matin Jacques Prévert
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
Worksite meeting 09/05/2014. Travaux réalisés Bunker XTAX monté Survey géomètres Tests palonnier motorisé XTAX Pose de léclairage dappoint sur la passerelle.
S. EVRARD, EN-MEF XTAX table repair Agenda 2 - Sébastien EVRARD Problème ressorts spiralés Plusieurs solutions envisagées: Ressort h60mm Ressort.
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 14/04/2011 Activities TS week 13 Production for test area On-going.
REUNION DE GROUPE CMS-Saclay 30/05/2002 J.Rander.
1 ISBN John Wiley and sons. 2 IntroductionIntroduction Chapter 1.
Civil engineering for LIU – PS
Comment choisir un métier…
Cest mercredi le neuf octobre Le plan! 1.Révisions 2.Vocabulaire 3.Jouer 4.Ecouter 5.Parler Il fait beau! Le but! Les couleurs!
Pâques - Easter. Joyeuses Pâques 1. When do the bells stop ringing in France? 2. What do people remember when the bells are silent? 3. When do the bells.
Jeudi 14 octobre Les objectifs: 1.Be confident in looking nouns up in a dictionary 2.The / a.
Nous finissons Je regarde.. Le Présent Ils vendent.
How many of these flags do you recognise? Work with your partner to see if you know many – write them down - some will crop up shortly!
Mon émission préférée Lesson Objectives: In this lesson you will learn how to say what time your favourite programme is on, and on which channel.
Modifications of working conditions in the host states Report on the AT Board held on 18 April 2000 New minimum wages in Switzerland Impact of the 35-hour.
16-Oct-00SL-BI and QAP Presented to QAWG on 23/10/2000Slide 1 Quality Assurance in SL/BI Jean-Jacques GRAS (SL-BI)
Quelle heure est-il? What time is it ?.

Les pronoms d’objet direct (Direct Object pronouns)
Ecole des Arts Visuels de La Cambre / cours Éco-conception & Développement Durable / François Jégou 1 WELCOME TO SAINT-GILLES, LIÈGE CAMPUS FOOD SAINT-GILLES.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
Essential Question: How can you tell someone in French that you do something everyday or just on a certain day? Lesson 5.
TDC2/TCC2 consolidation Worksite meeting 29/08/2014.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
XTAX Repairs Bilan dosimetrique.
Le pronom « en » Révision: p60-61 dans le cahier.
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
Révision: p60-61 dans le cahier
The 4th Power Places and Forms of power How reliable are our sources of information today ? The media.
Les jours de la semaine.
Mettez vos devoirs dans la boîte rouge prennez les devoirs 2.2 B
What’s the weather like?
Transcription de la présentation:

S.Evrard - EN-MEF XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF Story-board (I) 2 1 Bunker assembly 2 shielding roof removal 3 service disconnection 4 table handling (see beam tracks )

S.Evrard - EN-MEF Story-board (II) 3 5 spring removal 6 old motor removal 7 new motor installation 8 table back handling

S.Evrard - EN-MEF New hardware implemented on this worksite 1.PR537 crane made remotely controlled 2.Vision system deployed (10 cameras) 3.New remote controlled lifting jigs (1 and 2 hooks) 4.Inspection & Remote RP survey tool 5.On-line dosimetry 6.Improved communication means (headsets, audio conference during repair)

S.Evrard - EN-MEF XTAX table routing in TCC2 5 Dry run with dummy table routing accurately defined (X,Y,Z) and tested T2 T4 T6

S.Evrard - EN-MEF Encountered challenging situations Date débutDate finDifficultéSolution Ven 02/03Ven 16/03 Personnel FSU et Altead pas conforme dosimétrie Formation PCR et commande dosimètre en urgence Lun 12/03Ven 16/03Vanne départ flexible cooling pas étanches Pose de nouvelles vannes supplémentaires étanches + aspiration eau répandue au sol et stockage dans container 1m3 Mar 13/03 Palonnier automatique : 1 axe se coince lors de lengagement ou lors du dégagement de façon aléatoire Remplacement de deux boites daxe automatique + tests concluants Mer 11/04 Retrait moteur et accouplement compliqué sur table avale XTAX Chauffer au chalumeau laccouplement et utilisation de vérin Jeudi 12/04 Casse embouts vis pression clavette au remontage moteur Pose pas de problème au démontage futur car retrait demi-coquille enlève toute pression sur clavette : laissé comme cela Jeudi 12/04Vendredi 13/04Mauvais positionnement table T4 amont P0 Repositionnement coupelle voir doc recovery action Jeudi 12/04Vendredi 13/04 Vis interface grille cassée. Morceau coincé dans taraudage Clamp ad hoc Lundi 16/04Mercredi 25/04 Depuis remise en eau XTAX T2 et T4 : fuite sur aimant MSN ligne H4 downstream XTAX Isolement, décapotage aimant, remplacement joint défectueux Mer 18/04 Retrait moteur et accouplement compliqué sur table avale XTAX 06 Arrache poulie utilisé 6

S.Evrard - EN-MEF Recovery action on 13/04/2012 During its removal, one cup housing the downstream right foot of the table felt down and must be repositioned. Once re-installed, the table turned out to be misaligned by 4 cm at the level of the positioning grid system Investigation on spare parts confirm our feeling of a wrong repositioning of the cup. Decide an inspection on site Dose rate estimate around 20 mSv/h shielding required Shielding installation ( L shape 4 cm thick lead dose rate reduced to 2.3 – 2.7 mSv/h) Removal of the felt down cup + 3 rollers & inspection of the 2 other cups Replacement by spare parts 7

S.Evrard - EN-MEF Quality Assurance plan One slip by repaired table Who did what, when, how,… Motor test report Test in laboratory (motor only) Test in the bunker (motor + gearbox) Final test in place (motor + load, full range tested) 8 H2 aval

S.Evrard - EN-MEF Dosimetry stats 9

S.Evrard - EN-MEF Dosimetry stats 10

S.Evrard - EN-MEF Dosimetry stats 11 Motor repair procedure very well studied and optimised real dose <<<< estimates Proximity intervention less optimised real doses = estimates Ways of improvement : cold cell or new connection design

S.Evrard - EN-MEF Dosimetry stats 12 Self-commitment of max 600 uSv/ person under control