beam charge measurements

Slides:



Advertisements
Présentations similaires
How to solve biological problems with math Mars 2012.
Advertisements

Seasons and Preferences Project French 1. Choose your favorite pass-time Je mappelle Madame Mac et Jaime apprendre les langues!
Les choses que j aime Learning Objective: To know how to use j aime to talk about things I like to do.
Laboratoire de Bioinformatique des Génomes et des Réseaux Université Libre de Bruxelles, Belgique Introduction Statistics.
Information Theory and Radar Waveform Design Mark R. bell September 1993 Sofia FENNI.
THE ADJECTIVES: BEAU, NOUVEAU AND VIEUX 1.
Irregular Adjectives Not all adjectives are made the same.
Le 4-7 novembre. Qui est présent? Quelle heure est-il? La feuille pour étudier L’examen La Jéopardie!
Journees de prospective LAL/ Seillac 2012
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
1 Linear Prediction. 2 Linear Prediction (Introduction) : The object of linear prediction is to estimate the output sequence from a linear combination.
FD relative displacement measurements A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner, D.Schulte, R.Tomas-Garcia B.Bolzon.
05/03/2009JP BRASILE1 Modulateur de nouvelle génération 5 mars 2009.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
Status ATF2 Andrea JEREMIE. 4 ATF2 ATF2 extraction line 4.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
10/10/ Finite Difference Method Major: All Engineering Majors Authors: Autar Kaw, Charlie Barker
1 Case Study 1: UNIX and LINUX Chapter History of unix 10.2 Overview of unix 10.3 Processes in unix 10.4 Memory management in unix 10.5 Input/output.
An Introduction To Two – Port Networks The University of Tennessee Electrical and Computer Engineering Knoxville, TN wlg.
Electronic Instrumentation Lecturer Touseef Yaqoob1 Sensors and Instrumentation Sensors and Instrumentation.
 Components have ratings  Ratings can be Voltage, Current or Power (Volts, Amps or Watts  If a Current of Power rating is exceeded the component overheats.
IP Multicast Text available on
Indefinite articles & plural of nouns
Physical principle Ultrapurification Single pixel detector Electronics
Acquisition des données
IGTMD réunion du 4 Mai 2007 CC IN2P3 Lyon
l y a which we have already learned means “there is/are l y a which we have already learned means “there is/are.” When we put a measure of time.
1 S Transmission Methods in Telecommunication Systems (4 cr) Transmission Channels.
Réunion service Instrumentation Activités CMS-Traces
Qu’est-ce qu’on mange au...
Strengths and weaknesses of digital filtering Example of ATLAS LAr calorimeter C. de La Taille 11 dec 2009.
ABAQUS I Summary Program Capability Components of an ABAQUS Model Elements, Materials and Procedures Modules (analysis, pre and post processing) Input.
Le détecteur ATLAS Nicolas Massol.
Quantum Computer A New Era of Future Computing Ahmed WAFDI ??????
- User case - 3D curve length optimization
Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics.
CERES - WHEAT Realised by : Yassine ADRAB Supervised by: Dr. Abdellah ABOUDRARE National School of Agriculture Meknès
A level French 8th December 2017.
Scenario d’intégration du pixel alpin
INVERTER LOAD SPEED CONTROLLER Power demand Speed reference ENGINE 230/400V 50Hz/60Hz PMGPMG 1 f = Hz Speed =var Island Operation of the Adjustable.
F RIENDS AND FRIENDSHIP Project by: POPA BIANCA IONELA.
Phase-Locked Loop Design S emiconducto r S imulation L aboratory Phase-locked loops: Building blocks in receivers and other communication electronics Main.
1. Financial (Accounting) Statements  Financial or Accounting statements are used for reporting corporate activity. 2 For Stakeholders.
P&ID SYMBOLS. P&IDs Piping and Instrumentation Diagrams or simply P&IDs are the “schematics” used in the field of instrumentation and control (Automation)
1 Introduction To Resonant Circuits University of Tennessee, Knoxville ECE Department wlg.
When thermoelectric systems meet the Feymann ratchet: harmonic response and feedback Christophe Goupil, Henni Ouerdane, Yann Apertet, Philippe Lecoeur.
G. Peter Zhang Neurocomputing 50 (2003) 159–175 link Time series forecasting using a hybrid ARIMA and neural network model Presented by Trent Goughnour.
Lect12EEE 2021 Differential Equation Solutions of Transient Circuits Dr. Holbert March 3, 2008.
Acquisition François Wicek LAL.
Six months after the end of the operations
Qu’est-ce que tu as dans ta trousse?
Information available in a capture history
Qu’est-ce que tu as dans ta trousse?
Les moniteurs de profile transverse de ThomX
Manometer lower pressure higher pressure P1P1 PaPa height 750 mm Hg 130 mm higher pressure 880 mm Hg P a = h = +- lower pressure 620 mm Hg.
What’s the weather like?
Écoute,écris et traduis.
SLIDE TITLE PowerPoint Presentation SUBTITILE HERE.
By : HOUSNA hebbaz Computer NetWork. Plane What is Computer Network? Type of Network Protocols Topology.
Etat d'avancement: calendrier
Task while waiting for everyone to finish writing the WALT and WILF
Travail de cloche Write three sentences: the first must use the verb prendre and a type of sandwich as the direct object. the second must use the verb.
Status Daq µTCA et carte Asm
Travail de cloche Que buvez vous avec votre dÎner?
One important document and tool for SUPERVISORS. Plenty of sanctions.
Travail de cloche Pensez à un personnage du livre que vous venez de finir. Quel cadeau, que vous pouvez acheter à Amazon.com, voulez-vous lui donner?
Avoiding the Pitfalls of Bad Slides Tips to be Covered Outlines Slide Structure Fonts Colour Background Graphs Spelling and Grammar Conclusions Questions.
IMPROVING PF’s M&E APPROACH AND LEARNING STRATEGY Sylvain N’CHO M&E Manager IPA-Cote d’Ivoire.
M’SILA University Information Communication Sciences and technology
Transcription de la présentation:

beam charge measurements ThomX Diagnostics : beam charge measurements

Sommaire Présentation générale du sous-système et de son fonctionnement Etat d'avancement: Transfert des responsabilités LAL => SOLEIL (si applicable) Équipements manquants Équipements pas encore testés Équipements pas encore testé avec le CC (si applicable) Progrès de l'assemblage des composants (si applicable), intervention entreprise extérieure nécessaire (si applicable) Planning d'installation dans l'igloo (identification des étapes pour l'installation, durée, et date d'installation si celle-ci est définie, dépendance avec d'autres sous- systèmes) Liste des tests de validation sur site. Liste des tests de validation sur site avec le CC (si applicable).

ThomX Diagnostics : beam parameters The standard ThomX charge is 1nC Linac pulse length 4ps Ring pulse length: 4ps @ injection time 20ps @ extraction Time Requirements: Charge measurement from few pC to 2nC Resolution +-1pC

Faraday Cups and Integrated Current Transformers Two Faraday Cups Three ICTs

Faraday Cups (F.C.)-1 The F.C. is a conductive piece integrated to a beam dump, isolated from the gun ground. the beam charge, collected by the Faraday cup, flows along a cable to an acquisition system Of course, Faraday cup is a destructive diagnostic Average Power, Max current and Collected charge flush: a. Average power Pmoy = Q E f Q = 1nC ; E = 50 Mev ; f = 50 Hz => Pmoy = 2.5 W b. Max current / Max voltage With a Gaussian distribution Ipk = 𝑄/𝜎 2𝜋 For a 𝜎 = 4 ps (resp. 20 ps), The max current is up to 100 A (resp. 20A), corresponding to 5kV (resp. 100 V) for a 50 ohms reading impedance. The signal must be integrated to have a “reasonable” amplitude !!! c. In case of unplugged cable on the faraday cup, we must foresee a resistance (>>50 Ohms) to prevent charge accumulation that can destroy acquisition system.

Faraday Cups -2 Analog signal integration: To fit the DAQ input capability (Wavecatcher, 2,5V max 128ns memory depth, 3,2GS/s), The FC output signal (5KV 4ps) must be integrated: The first integration step is done by the length of the cable (LMR 200, 20m) from the FC to the Wavecatcher. The second step is done by a 10MHz band pass filter @ the end of the cable. Step 2: 10MHz pand pass filter Step 1: cable integration

Faraday cups -3 Possible deffects: 1- wrong solder at the Faraday side 2- unplugged cable at Wavecatcher side Status: 1- Faraday Cups installed but not yet connected to cable 2- Band pass filters on command 3- Wavecatcher Man Machine Interface not yet ready Cable connection @ the back of a Faraday Cup

ICT-1 (integrated current transformer) (from Bergoz company) The ICT is a coil isolated from the beam pipe with a ceramic that cut the ground continuity. A current is induced in the coil by the electron beam. The ICT is NOT a destructive diagnostic. Ceramic Beam pipe e- beam Ground continuity

ICT-2 The ICT models on ThomX: ICT-CF6”—60,4-UHV-070-5.0 Standard response : 1nC beam => 5nVs charge output (ie 100pC on 50 Ohms) Signal en sortie d’ICT : (scope 20GS/s) 20ns/div 10mV/div (Mesure effectuée sur PHIL avec une charge de 220pC)   ICT calibration by Bergoz : Error to standar response: below 0,5% Vmean Q Vmax 70ns Triangle approximation for resolution calculation

ICT-3 Analog signal acquisition: The mean amplitude (over 70ns) of the output signal of the ICT for a 1nC charge is around 70mV The Wavecatcher is a 12 bits ADC @ a 3,2GB/s rate ( bit weight 0,6mV) That give a 9pC resolution for 1 acquisition dot. For a 70ns acquisition signal the Wavecatcher make a 225 dots acquisition, increasing the resolution to 0,6pC. For the maximum beam charge (2nC) The ICT output give a 300mV max amplitude signal far below the Wavecatcher limitation (2,5V)

ICT-4 Possible deffects: 1- unplugged cable at Wavecatcher or ICT side Status: 1- ICTs installed but not yet connected to cable 2- Wavecatcher Man Machine Interface not yet ready

beam charge measurements ThomX Diagnostics : beam charge measurements Requirements Transfer from Soleil to LAL done No major component missing M.M.I. for Wavecatcher has to be developed. Cable connection from measurer to DAQ has to be test Final tests: - One day per device (as soon as the beam reach the measurer)