COMBAT SWIMMER AREA STUDY Dive Profile / Mission Planning.

Slides:



Advertisements
Présentations similaires
Solar rotational stereoscopy The four anaglyphics views in this presentation have been obtained on october 200, 6 and 7, from SoHO EIT 304 A images, at.
Advertisements

Automatique. CharlesAnne.
11 Vocabulaire Situations Directions 4.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
PIPE SUPPORTS 1 Pipe supports inside the compression station and pumping stations AUGUST 2014.
1 Case Study 1: UNIX and LINUX Chapter History of unix 10.2 Overview of unix 10.3 Processes in unix 10.4 Memory management in unix 10.5 Input/output.
Traffic Sign Recognition Jacob Carlson Sean St. Onge Advisor: Dr. Thomas L. Stewart.
 Components have ratings  Ratings can be Voltage, Current or Power (Volts, Amps or Watts  If a Current of Power rating is exceeded the component overheats.
SEW Maintenance Series ReplacingaStator SEW-EURODRIVE—Driving the world.
Template Provided By Genigraphics – Replace This Text With Your Title John Smith, MD 1 ; Jane Doe, PhD 2 ; Frederick Smith, MD, PhD 1,2 1.
CNC Turning Module 1: Introduction to CNC Turning.
Usage Guidelines for Jeopardy PowerPoint Game
Regarde le vidéo clip Décide quelle phrases sont correctes (vrai) ou incorrectes (faux)? 1.
jeudi, le quatorze septembre
Unité 2– L’art de la nourriture
Formules en 2 étapes 1MPES4
WP5 : Initial design of the glider
Proposition pour un comité composé de 9 membres
The Météo-France operational SAR model
Les Prépositions.
The Ovide program Ovide contributes to the monitoring and the understanding of ocean variability in the northern North Atlantic ocean (transports, water.
Why is it important to plan ahead for the future?
Samples for evaluation from All Charts & Templates Packs for PowerPoint © All-PPT-Templates.comPersonal Use Only – not for distribution. All Rights Reserved.
Unité 3 – On fait les courses
Innovative Plants For a green and technologic future.
Conjugating regular –er verbs en français
C’est la baleine
Les Directions vocabulaire de conversation
Comptes les points noirs !!!
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
INVERTER LOAD SPEED CONTROLLER Power demand Speed reference ENGINE 230/400V 50Hz/60Hz PMGPMG 1 f = Hz Speed =var Island Operation of the Adjustable.
Making Sentences Negative in French
1. Financial (Accounting) Statements  Financial or Accounting statements are used for reporting corporate activity. 2 For Stakeholders.
P&ID SYMBOLS. P&IDs Piping and Instrumentation Diagrams or simply P&IDs are the “schematics” used in the field of instrumentation and control (Automation)
Integrated Gasification Combined Cycle Plant By Abhijit Kumar Prasad Submitted to Dr. B.Paul Assistant Professor MNNIT Allahabad.
Phylum Mollusca, Class Bivalvia Bivalves (Class Bivalvia) include clams, mussels, oysters, and scallops The body of bivalves is laterally compressed (flattened.
“Confidential –Internal Halliburton Use Only. © 2004 Halliburton. All Rights Reserved.” Stimulation Techniques Fracturing Fluids Proppants.
1210 压辊安装 List of tools to use 1, 2, tongbang, hammer 3, circlip pliers, installing a circlip using 4 discus with a screwdriver, a word,
Distributed Radiation Detection Daniel Obenshain Arthur Rock SURF Fellow.
High-Availability Linux Services And Newtork Administration Bourbita Mahdi 2016.
Français - couleurs - pays - drapeaux
Benchmarking noise policies
Un risque « oublié » dans l’Océan Indien: le tsunami
POLITIQUES EN FAVEUR DES JEUNES
1 STRATEGY YOUR COMPANY PRESENTS START HERE BUSINESS.
Connaissez-vous la France ?
Las partes del cuerpo Ask pupils to name the parts of the body. The words do not come up – the coloured numbers give the gender clue. 1 =
C’est quel numéro? Count the numbers with pupils.
Quebec Provincial Elections
Les yeux et les cheveux Year 7
Connaissez-vous la France ?
1-1 Introduction to ArcGIS Introductions Who are you? Any GIS background? What do you want to get out of the class?
Manometer lower pressure higher pressure P1P1 PaPa height 750 mm Hg 130 mm higher pressure 880 mm Hg P a = h = +- lower pressure 620 mm Hg.
If you feel that the resources that I have created have helped you save time and/or money, please consider supporting the work that I do by doing your.
Rapid Deployment Solution Real Estate Q1 and Q Best Practice Flow Diagrams.
© by Vista Higher Learning, Inc. All rights reserved.4A.1-1 Point de départ In Leçon 1A, you saw a form of the verb aller (to go) in the expression ça.
By : HOUSNA hebbaz Computer NetWork. Plane What is Computer Network? Type of Network Protocols Topology.
Decommissionned packaging machines And Not decommissionned
Paul Eluard Dans Paris.
Ftpworldwide-Company FTP Worldwide has a simple, secure and flexible solution for your managed file transfer and file sharing needs. Unlike many of our.
Coupe du Monde 2010 TOP TRUMPS!.
Comptes les points noirs !!!
Français 2, 6 septembre 2016 Ouvrez vos livres à la page 218, faites #1. What's the difference between a teacher and a train? Drôle – funny. Tu en fais.
Prepositions of location and disjunctive pronous
Utilisation du logiciel EduStat©
Ferdinand de Saussure Father of Linguistics A Presentation by BOULMELF And MAZOUZ © 2018 « All rights reserved »
Comptes les points noirs !!!
Over Sampling methods IMBLEARN Package Realised by : Rida benbouziane.
IMPROVING PF’s M&E APPROACH AND LEARNING STRATEGY Sylvain N’CHO M&E Manager IPA-Cote d’Ivoire.
M’SILA University Information Communication Sciences and technology
Transcription de la présentation:

COMBAT SWIMMER AREA STUDY Dive Profile / Mission Planning

Area Study Key West UCSG Station TROMBO Point

C2 ASSALT EXFIL QRF TGT AO SUPPORT / RECCE (Eyes on TGT) C2 COMMs Link SUPPORT PR & E&R Support to TGT AO looking in/looking out RECCE ASO ASSALT INFIL COMBAT SWIMMER MISSION PLANNING CONOPS SUPPORTING ASSETS ROTO / FIXED WING & NSV

KW LOWER KEYS HOSPITAL RP 03 RP 02 RP 06 RP 05 RP 04 RP 08 RP 07 KW POLICE STATION KW AIR PORT SUPPORT PR & E&R Support to TGT

Area Study Water Conditions Water Conditions Tides and Currents Tides and Currents Offset navigation leg Offset navigation leg Cardinal directions of the entire area Cardinal directions of the entire area –Direction of each pier area layout Channel markings & traffic in the area Channel markings & traffic in the area –Water level reference points on chart and local area –Restricted areas –Bottom depths & Contours in the areas –Moring points & turning basin in the local Ares –Harbor entrance areas

USCG TROMBO POINT Area study F G “25”

Area Study

Point F. At SEA Reference point: Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach based on reference point. –Compass bearings and Distances between reference points. Danger areas in the harbor: Danger areas in the harbor: –Obstacles in the area, danger areas –Restricted areas –High traffic areas –Public fishing areas Type of surface craft in the area and location: Type of surface craft in the area and location: –Harbor and channel markers –Bottom depths & Contours in the areas –Moring points & turning basin in the Area –Harbor entrance areas Target is right side of the strobe tower east, looking from sea to target.

A B C F E D USCG TROMBO POINT Area study Harbor layout 010°m North 280°m West 100°m East 190°m south TGT 2 Swordfish TGT 1 Key Biscayne 1339 TGT 3 Mohawk913 TGT 4 Knight Island 1348 Support signal point

G USCG TROMBO POINT Area study 285° 105°

Area Study Point A. D-2 Pier area Hard reset point Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Danger areas in the harbor Danger areas in the harbor –Obstacles in the area, (66yds danger area) –Lights, power, numbers of pier in the location. –Ships alongside the pier. –Personnel and public fishing areas. Type of other surface craft in the area and location: Type of other surface craft in the area and location: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off?

Area Study Point B. D-1 Pier area Hard reset point Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Support signal point Support signal point –Clear to move on target –Hold position / RV –Abort mission Danger areas in the harbor Danger areas in the harbor –Obstacles in the area, (66yds danger area) –Lights, power, numbers of pier in the location. –Ships alongside the pier. –Personnel and public fishing areas. Type of other surface craft in the area and location: Type of other surface craft in the area and location: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off? Support signal point

Area Study Point C. Pier D-2 and inside corner and finger piers. Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Danger areas in the harbor Danger areas in the harbor –Obstacles in the area, (66yds danger area) –Lights, power, numbers of pier in the location. –Ships alongside the pier. –Personnel and public fishing areas. Type of other surface craft in the area and location: Type of other surface craft in the area and location: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off?

Area Study Point D. Pier D-2 finger piers / D-3 Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Danger areas in the harbor Danger areas in the harbor –Obstacles in the area, (66yds danger area) –Lights, power, numbers of pier in the location. –Ships alongside the pier. –SAR Mission ready, movement at any time. –Personnel and public fishing areas. Type of other surface craft in the area and location: Type of other surface craft in the area and location: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off?

Area Study Point E. Pier D-3 harbor exit location Pier construction at each location: Pier construction at each location: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Support signal point Support signal point –Clear to move on target –Hold position / RV –Abort mission or mission complete Danger areas in the harbor Danger areas in the harbor –Obstacles in the area, (66yds danger area) –Lights, power, numbers of pier in the location. –Ships alongside the pier. –Personnel and public fishing areas. Type of other surface craft in the area and location: Type of other surface craft in the area and location: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off? Support signal point

Area Study Point G. Fleming Key Bridge Pier construction: Pier construction: –Cardinal directions: right shoulder / left shoulder approach. –Length, width, depth of each location. –Compass bearings and Distances between pilings / piers. –Type of construction of the piers, walls, piles, rocks, or sand. –Pier Corners, round or sharp what type of construction. Danger areas: Danger areas: –Speed of the current. (body position) –Obstacles in the area, danger areas. –Lights, power, numbers of pier location. –Public fishing areas. Type of other surface craft in the area: Type of other surface craft in the area: –Traffic in the area

TARGET INFO: DESCRIPTION: –Hull number and name of target: – –Location of target: (pier mooring point) – –Target approach: SIZE: LENGTH / WIDTH / DRAFT – –Hull shape: (Bow & Stern) – –Location of suction & discharges: – –Entry points: (planed depth) OTHER SURFACE CRAFT IN THE AREA: –Manned or unmanned? –Length, width, depth, of each type craft –Power, sea suctions discharges on or off? PACKAGE PLACEMENT: – –Time on target – –Measurement plan: (location & depth) – –Exit location: – –Package placement / location – –RV or holding point location: (If separated to regroup w/ other pairs) – –1 FT. = YDS

TARGETS: TGT 1 KEY BISCAYNE HULL NO# displacement tones 171 displacement tones (Bow out) 109ft long / 21ft wide / Draft 8ft. (Bow out) 109ft long / 21ft wide / Draft 8ft. 2 Paxman Valenta 16rp 200m diesels 6246hp 2 Paxman Valenta 16rp 200m diesels 6246hp 2 shafts / rudders / props 2 shafts / rudders / props 16 crew 16 crew TGT 2 SWORDFISH HULL NO# displacement tones 92 displacement tones (Bow in) 87ft long / 19ft wide / Draft 6ft. (Bow in) 87ft long / 19ft wide / Draft 6ft. 2 MTU 8v 396 TE 94 diesels 2680hp 2 MTU 8v 396 TE 94 diesels 2680hp 2 shafts / rudders / props 2 shafts / rudders / props 16 crew 16 crew TGT 3 MOHAWK HULL NO# displacement tones displacement tones. (Bow in) 270ft long / 38ft wide / Draft 13ft. (Bow in) 270ft long / 38ft wide / Draft 13ft. 2 ALCO 18v 251 diesels 7290hp 2 ALCO 18v 251 diesels 7290hp 2 shafts / rudders / props 2 shafts / rudders / props 105 crew 105 crew TGT 4 KNIGHT ISLAND HULL NO# displacement tones 171 displacement tones (Bow in) 109ft long / 21ft wide / Draft 8ft. (Bow in) 109ft long / 21ft wide / Draft 8ft. 2 Paxman Valenta 16rp 200m diesels 6246hp 2 Paxman Valenta 16rp 200m diesels 6246hp 2 shafts / rudders / props 2 shafts / rudders / props 16 crew 16 crew

Target Description OWNER: US NAVY MANAGEMENT/ADMINISTRATION: Atlantic Targets and Marine Operations Detachment Key West, AIR OPERATION/MAINTENANCE: Seaward Services Incorporated LOCATION: Trumbo Point Annex, Key West FL. POINT OF CONTACT: F. Blaine Rineer, Site Manager PHONE: FAX: MAIL: NAVAIR Atlantic Targets and Marine Operations Det Key West, PO Box 9013 Key West Florida US NAVAL PLANNING AREAS R/V NAWC-38 SPECIFICATIONS: 299 Gross Tons; Length 192-ft; Beam 40-ft; Draft 12-ft; 3-ft of freeboard on the main deck. PROPULSION: Twin screw diesel with EMD mains [3,000-hp total] and a 300-hp GM 8V-71 driven bow thruster. CONTROLS: Engine and bow thruster controls located fore and aft in the pilot house.