PH SPace Overview Board Space POlicy Board A.Petrilli, December 18, 2013.

Slides:



Advertisements
Présentations similaires
Expressions which use the verb avoir. Avoir in the present tense j ai tu as il a elle a nous avons vous avez ils ont elles ont.
Advertisements

Les noms des partenaires ____________________________________ ____________________________________ Partie A: Notre thème est: ______________________________.
Section HE-HH. Section HE-HH Heavy Handling in Meyrin 2013 LS1 a commencé en printemps PS: rénovation système de ventilation (désamiantage), échange.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 20, 2014.
PH SPace Overview Board Space POlicy Board A. Petrilli, October 20, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, May 19, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, March 31, 2011.
1 DEP PH «SPOB» SPACE POLICY BOARD 20 octobre 2010.
PH SPace Overview Board Space POlicy Board A.Petrilli, January 30, 2014.
PH SPace Overview Board Space POlicy Board A. Petrilli, August 25, 2011.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 28, 2013.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 20, 2012.
Expressions which use the verb avoir
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 28, 2012.
PH SPace Overview Board Space POlicy Board A.Petrilli, May 15, 2014.
PH SPace Overview Board Space POlicy Board A. Petrilli, June 23, 2011.
French Hammer the Grammar Aim: to be confident using the present tense To formulate accurate sentences using the present tense of …ir / …re/ …er verbs.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
1 of 9. 2 of 9 Your Board of Directors Votre Conseil d'Administration.
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
PH SPace Overview Board Space POlicy Board A.Petrilli, September 26, 2013.
Building 867 Controlled facility for the repair of radiated material 1 Betty Magnin TE-MPE-EMRadWG 05/12/12.
FORMING QUESTIONS ????????????????? ??. 3 WAYS TO ASK YES/NO QUESTIONS 1. Make your voice rise at the end of a sentence (Note: Your voice WILL rise at.
Sister Dalton Fireside Make the most of your BYU experience!
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
1 Differentiation: high, forte Integration: high, forte Transnational.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 13, 2014.
D RAW D ESSIN. Create a scale drawing of your store layout (or the space you will use to conduct your business). Be sure to include necessary spaces such.
ÉCOLE POLYTECHNIQUE CONCOURS 2010 Workshop NSERC scholarship application 23 avril 2015 École Polytechnique.
Pile-Face 1. Parlez en français! (Full sentences) 2. One person should not dominate the conversation 3. Speak the entire time The goal: Practice! Get better.
Slide 1 of SOCIAL ACTIVITIES REGISTRATION PLEASE NOTE THAT REGISTRATION FOR THE VARIOUS SOCIAL ACTIVITIES FOR THE COMING MONTHS WILL TAKE.
Unité 2 La vie courante Leçon 3 Bon appétit. Thème et Objectifs Everyday life in France In this unit, you will learn how to get along in France. You will.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
Bienvenue and Welcome to Our French II Live Lesson! We will begin shortly!
PH SPace Overview Board Space POlicy Board A.Petrilli, September 18, 2014.
SPLUS Comment ouvrir SPLUS?  Logiciels… Biologie/Biology… SPLUS Où sont les données?  G:\DATA\BIOLOGY\Bio4x18\Lab Data\SPLUS 
Proposals/Propositions Organisation of Union Events together with National Events Members will recall that in recent years, the level of participation.
Slide 1 of Slide 2 of 35.
La prononciation française Ge gi make a soft jeee sound Ga /Go / G+ consonant harsh G sound généralement génial Manger église gomme goût Géographie gâteaux.
Slide 1 of Slide 2 of 37.
LHCb DC06 status report (LHCb Week, 13/09/06) concernant le CC : –Site currently fine / stable 3% of simulatated events 30% of reconstructed events –Site.
1. Est-ce que Est-ce que, literally translated "is it that," can be placed at the beginning of any affirmative sentence to turn it into a question: Je.
BAF3 Civil engineering Status -6 June 2013 EDMS approval procedure for « Plans d’execution » launched on 16/05/2013. Drawings released on 28/05/2013 (some.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 15, 2012.
Agence fédérale pour la Sécurité de la Chaîne alimentaire 1 Problems in the valorization of cattle feet in slaughterhouses Federal Agency for the Safety.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 25, 2015.
TAX ON BONUSES. Cette présentation appartient à Sefico. Elle est protégée par le code de la propriété intellectuelle : toute reproduction ou diffusion.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 27, 2013.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
EN-CV Progress EHN1 Extension Project
What’s the weather like?. Look at the verb phrase fait-il above Turn it around and you have il fait The phrase Il fait can be used to describe lots of.
Echange PH - TE Bâtiment 167contre 230, I8 et partie du /11/101MNB.
Flash-on-flash-off! You will see some French text in a minute but it will only be on the board for a minute then it will disappear.
Play the presentation & note down new vocabulary Complete the activities Le petit déjeuner Breakfast.
Je vais aller à Paris L’objectif: 1.To identify a verb in its infinitive form 2.To know how to form the near future tense Play the presentation & complete.
Agenda Introduction & Actions follow-up New projects
Status Report Bat  Sous-sol B13, S-011, S-018, S-022, S-043, S-049 : Réseau informatique, terminé Reste peinture antistatique et faux-plafond au.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
Notes les avril Le conditionnel (The Conditional) À Paris, on parlerait français avec tout le monde. In Paris, we would speak French with everybody.
PH SPace Overview Board Space POlicy Board A. Petrilli, December 15, 2011.
With a partner, try to name all these things without looking at your vocab list!!
Révision. L’annonce 1.Vous allez vendre cette maison, écrivez l’annonce en utilisant les mots suivants: A utility room,A well, A cellar,2 bathrooms.
French leve 1 - Homework due on May 2, 2016 – vocabulary  You are given at the beginning of the year the global list of the vocabulary list of BON VOYAGE,
Construction Permit Supplementary surface buildings for CMS experiment – Point 5.
R. Aleksan Saclay Février 23, Visite collègues chinois de IHEP et Tsinghua  décembre  3 personnes  GOA Yuanning, QI Huirong, RUAN Manqi.
Les Prépositions de lieu en Français. Dans = In Le ver est dans la pomme.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
Comité d’organisation Jeremy Andrea Roberto Chierici Frédéric Déliot Didier Lacour Arnaud Lucotte Dominique Pallin Mossadek Talby.
Transcription de la présentation:

PH SPace Overview Board Space POlicy Board A.Petrilli, December 18, 2013

Agenda

Introduction  Agenda + minutes approval  News  B4-S-030 Conference room now bookable  Bookings controlled via TH secretariat  Test period 3 months  Repeating bookings limited to 3 months  Review at end of February  No GTPE  Neutrino Detector R&D

B.185 Neutrino R&D  The DG memo on Neutrino Detector R&D is attached to the agenda  It clearly names B.185 for the installation  To make this possible, we would have to  Identify palletized items not needing temperature control to move in B.610  Identify storage space for the remainder  Identify storage for large/heavy items currently on B.185 floor (~ sq.m.)  In addition, the current AGS-SI workshop would have to be moved to leave space for the cryo station  Following Icarus installation, some outside space might possibly be lost

B.185 Neutrino R&D  Overall we are looking for some ~1’000 sq.m.  Ideally placed around B.185  Present Icarus schedule mandates B.185 to be available for works ~February-March 2014  Only available place which could be easily and quickly adapted is B.191  This is currently owned by ATLAS  Ownership to be reverted to PH-AGS-SI  Cost of move should be claimed from DG funds  Estimated to ~200kCHF

B.185 Neutrino R&D  Compared ATLAS and CMS space occupation to see B.191 loss would not penalize ATLAS unduly  This is not the case and so we  Request PH Department Head to give the green light for this change

Status Report Bat  Sous-sol B13 : -Début des travaux labo 13 S-018, électricité, peinture, plafond, en attente travaux sur tuyauterie eaux usées et pluviales GS (J. Crespo promet une solution avant fin 2013), en attente de réponse. Bat 4. Sous-sol  Salle de réunion : Terminés, en attente d’équipement vidéo  Petite salle de réunion: travaux démarrent début 2014 Bat 222  Etude en cours pour nouvelle salle de réunion, GS. Travaux terrassement, modification escalier en cours.

Status Report Bat 26 R-042  ISOLDE : Réhabilitation d’un labo. Electricité, peinture, sol, cloisonnement, réseau, fluides (eau + air). Travaux peinture, sol, électricité, plomberie, en cours. Bat 27 S-403  Enlèvement d’un réservoir d’eau chaude HS, contrôle amiante positif, attente d’une entreprise pour le démantèlement (GS). OK de GS pour travaux début Bat 53 R-004 et 008  Travaux de peinture et cloison, en cours. Bat 27 S-403  Hall salle propre, reste travaux peinture, sol résine + électricité, en cours.

Space Requests - Offices Demandes de locaux en cours – PH:  1 bureau pour LCD demandé au 51-1  1 bureau pour DT demandé au 15-R  1 bureau pour COMPASS demandé au 892  bureaux pour 6 pers m 2 pour des labos, R. Landua  2 labos pour LHCb autour du 13-14, attente fin de travaux 13/S, 1 labo prêté par ESE, manque toujours un labo.  7 bureaux CMS pour ALICE au 161  1 bureau demandé pour PANDA (RD22), pas urgent.  1 bureau + 1 labo demandés pour AD-7 (GBAR).  3 bureaux donnés à AMS-RE1 au 892-1, terminé.

Space Requests - Offices Demandes ou échanges – autres départements :  3 burotel du 51/R prêté à DG, 10/2013.  2 bureaux prêtés à DGS-RP pour 2 ans au 892.  PH a refusé de céder 1 bureau à DGS au 23-1, cette zone est occupée par ALICE et AD, 1 place d’un « burotel » ALICE va être mis à leur disposition.  510 R seront prêtés à l’Association du Personnel courant janvier pour environ 3 mois.

Space Requests - Offices Divers :  Ateliers du 892 R-A02 et A04 à vider, COMPASS à emménagé.  Bat 275, projet EDU, R. Landua doit nous fournir un nouveau projet.  , local INEO vers 879, En attente  275, source ISOLDE vers 115: devis pour construire le laboratoire chez GS. Déménagement reporté 1 er semestre  226, locaux libérés par DIRAC et réaménagés pour TOTEM (lab électrique + atelier). TOTEM a demandé une étude à DGS.  prêt pour stockage à BE, 8 mois (mai 2014).

Space Requests - Offices Divers : Rappel, Suite à la construction du bâtiment 3196 au point 1, le bureau du dessin du 26/2 doit y emménager (environ 22 personnes). Plusieurs personnes occupants des bureaux (9 ?) au bâtiment 602 doivent également déménager. Ces déménagements doivent permettre de libérer le bâtiment 54/3, c'est à dire 33 bureaux représentent 500 m personnes sont à déménager. Des plans ont été préparés avec plusieurs proposition. Attendons le OK d'ATLAS.

Space Requests - Storage  PH-DT demande plus d’espace de stockage au Bat 168.  50 palettes de fibres optiques, pour débarrasser le 191-SS et 904 (PH-ESE). En attente de la part de PH-ESE, temps de stockage : indéfini  PH cherche un emplacement pour vider le 185 au profit de ICARUS (M. Nessi). Trouvé.

AoB  B4-S Alice DAQ  Reserved Parkings to be abolished?