PH SPace Overview Board Space POlicy Board A.Petrilli, September 18, 2014.

Slides:



Advertisements
Présentations similaires
Déroulement d'un chantier en général.
Advertisements

Section HE-HH. Section HE-HH Heavy Handling in Meyrin 2013 LS1 a commencé en printemps PS: rénovation système de ventilation (désamiantage), échange.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 20, 2014.
Réunion PH-DT-EM1 15 novembre 2011 Nouvelles du CERN / département / groupe, stockages matériel PH-DT [Antti] Tour de table [tous]
PH SPace Overview Board Space POlicy Board A. Petrilli, October 20, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, May 19, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, March 31, 2011.
1 DEP PH «SPOB» SPACE POLICY BOARD 20 octobre 2010.
PH SPace Overview Board Space POlicy Board A.Petrilli, January 30, 2014.
PH SPace Overview Board Space POlicy Board A. Petrilli, August 25, 2011.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 28, 2013.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 20, 2012.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
Modifications of working conditions in the host states Report on the AT Board held on 18 April 2000 New minimum wages in Switzerland Impact of the 35-hour.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 28, 2012.
PH SPace Overview Board Space POlicy Board A.Petrilli, May 15, 2014.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
PH SPace Overview Board Space POlicy Board A. Petrilli, June 23, 2011.
BAF3 Civil engineering -Actions menées depuis la dernière réunion et à venir -Coordination avec les différents services -Planning prévisionnel des travaux.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
1 of 9. 2 of 9 Your Board of Directors Votre Conseil d'Administration.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 26, 2013.
Réunion d’information OGEC 10 avril 2014
L. Roy Detector Safety System Tests INCENDIE (Baraques, Caverne, PZ) Tests FUITE D’EAU BARAQUES.
Réunion Linac 4 du Linac 4 dans le hall sud: 7.Civil Engineering and Infrastructure 7.1. Buildings, shielding 1) Démantèlement halls 150 et.
Les Mots Interrogatifs
Abéché Est du Tchad – Septembre 2009 Abéché – Eastern Chad - September Ramadan.
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 13, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 18, 2013.
ÉCOLE POLYTECHNIQUE CONCOURS 2010 Workshop NSERC scholarship application 23 avril 2015 École Polytechnique.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
Lucia - LAPP Phi* meeting - 3 novembre Correcting back to the electrons after FSR So far C Z defined w.r.t. electrons before FSR Z status = 3 and.
SPLUS Comment ouvrir SPLUS?  Logiciels… Biologie/Biology… SPLUS Où sont les données?  G:\DATA\BIOLOGY\Bio4x18\Lab Data\SPLUS 
Slide 1 of Slide 2 of 35.
la classe de français le 11 mai, 2015
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
Slide 1 of Slide 2 of 37.
LHCb DC06 status report (LHCb Week, 13/09/06) concernant le CC : –Site currently fine / stable 3% of simulatated events 30% of reconstructed events –Site.
Planification stratégique Strategic Planning Saturday, May 5, 2012 / Samedi, le 5 mai, 2012.
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
Welcome To Waterside Village Community Channel Stay tuned for important information about your community.
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 15, 2012.
Agence fédérale pour la Sécurité de la Chaîne alimentaire 1 Problems in the valorization of cattle feet in slaughterhouses Federal Agency for the Safety.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 25, 2015.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 27, 2013.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
EN-CV Progress EHN1 Extension Project
S. Grau & AS Team 9/15/2015 EDMS XETS coordination meeting 2.
Présentation du nouveau Site Hercules. Plan Nouvelle ergonomie Nouvelle base de données Nouvelle procédure d’inscription Nouveaux outils d’administration.
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
Agenda Introduction & Actions follow-up New projects
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
Status Report Bat  Sous-sol B13, S-011, S-018, S-022, S-043, S-049 : Réseau informatique, terminé Reste peinture antistatique et faux-plafond au.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
10 février 2016 Informatique et Réseaux – Domaine de responsabilités.
PH SPace Overview Board Space POlicy Board A. Petrilli, December 15, 2011.
With a partner, try to name all these things without looking at your vocab list!!
Negative sentences Questions
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
French leve 1 - Homework due on May 2, 2016 – vocabulary  You are given at the beginning of the year the global list of the vocabulary list of BON VOYAGE,
Construction Permit Supplementary surface buildings for CMS experiment – Point 5.
O WHY IS IT IMPORTANT TO PLAN AHEAD FOR THE FUTURE?
French web site for the Linear Collider Some news to start the discussion… (  Question mark in red)
Merci de remplir le formulaire et de le renvoyer à avant le 16 mai 2016 Please complete and send to
R. Aleksan Saclay Février 23, Visite collègues chinois de IHEP et Tsinghua  décembre  3 personnes  GOA Yuanning, QI Huirong, RUAN Manqi.
Resource allocation: what can we learn from HPC? 20 janvier 2011 Vincent Breton Crédit: Catherine Le Louarn.
Travail de cloche Que buvez vous avec votre dÎner?
Transcription de la présentation:

PH SPace Overview Board Space POlicy Board A.Petrilli, September 18, 2014

Agenda

Introduction  Agenda + minutes approval  News  GTPE, July+September  Status of Consolidation works  Call for Consolidation works  Status of Infrastructure projects  Call for Infrastructure projects  Radioactive storage needs for LS2  Status report  Office space statistics

Terminology  Building works divided in three kinds  Small repairs, e.g. broken store, malfunctioning heating in one office, etc.: call directly  Consolidation: bigger repair works to preserve a building: roof, toilets, etc.  Infrastructure projects, new buildings, refurbishing for change of functions, etc.

5

6

Consolidation works  I need a list of your consolidation needs to produce input for GS  A simple with one building per line and the kind of consolidation needed will be enough (e.g. toilets, windows, electricity, etc.)  For small repairs contact the directly  I will circulate the current list which GS has

Status Infrastructure Projects  2014 proposals:  refurbishing of (part of) the DT barracks (approved)  B.140 (refused)  new modular building in P1 (approved, under study)  2 new buildings in P8 for LHCb had already been approved (under study)

Call for Infrastructure Projects  2015 proposals:  new workshop/storage space in P5  B275 refurbishing (insulation, new labs, work space)  … Need your input about any other needs …

Radioactive storage needs LS2  Please send me your needs for LS2 if any  Currently no more storage available

Status Report Bat  Sous-sol B13 : -Début des travaux labo 13 S-018, électricité, peinture, plafond,. Report des réparations de toitures en 2015 (voir 2016) ?? Construction d’un bac de récupération pour les eaux pluviales, terminé, reste raccordement évacuations. Bat 4 S-020  Création d’une salle de réunion (+vidéoconférence, 17 m 2, max 10 pers), terminé, manque une prise réseau. Bat 222  Création d’une salle de réunion, GS. Terminé, manque table et vidéo.

Status Report Bat 26 R-042  ISOLDE : Réhabilitation d’un labo. Electricité, peinture, sol, cloisonnement, réseau, fluides (eau + air). Installation des passages de gaines en cours, reste éclairage + finitions, attente travaux de gaines. Bat 27 S-403  Enlèvement d’un réservoir d’eau chaude HS, contrôle amiante positif, attente d’une entreprise pour le démantèlement (GS). Travaux terminés. Travaux en attente pour installation ligne de froid pour clim (1 er semestre 2015) Bat 53 R-044 et 046  Travaux de peinture et cloison, installation clim, Terminé, reste table + vidéoconférence, terminé.

Status Report Bat 4 S-054,056,060  ALICE O 2 Project : Etude pour tirage de câbles d’alimentation depuis le bâtiment 100 : Avis favorable GS lance le chiffrage du travail, premiers chiffrages dans 3 semaines. Bat 585  Travaux en cours pour réaménager les locaux de l’aile droite pour TOTEM, Terminé, reste finitions, problèmes fuites toitures + effondrement sol. Bat 160  Toilettes condamnées, en attente de travaux Bat 6  Incendie pendant travaux en toiture, amphi+3 bureaux CMS condamnés, en attente de travaux  Rénovation de la cafeteria, funding BE+CMS, travaux en cours

Space Requests - Offices Demandes de locaux en cours – PH:  1 bureau pour LCD demandé au 51-1  2 labos pour LHCb autour du 13-14, attente fin de travaux 13/S, 1 labo prêté par ESE, manque toujours un labo.  7 bureaux CMS pour ALICE au 161  1 bureau demandé pour PANDA (RD22), pas urgent.  1 bureau + 1 labo demandés pour AD-7 (GBAR). En attente déménagement TOTEM  1 lab pour utiliser un laser (4 ans). En cours  Demande pour E. Auffray de séparer le 27 S-403 en 2 et pouvoir utiliser une moitié en salle laser. A l’étude  LHCb demande des bureaux supplémentaires autour du

Space Requests - Offices Demandes ou échanges – autres départements :  3 burotel du 51/R prêté à DG, décembre 2014 pour 1 bureau.  2 bureaux prêtés à DGS-RP pour 2 ans au 892.  DG-RP demande le prêt de 2 labos pour 4 mois (juillet-octobre) au 892-S (réception d’équipement et déballage avant installation), En cours

Space Requests - Offices Divers :  , local INEO vers 879, En attente  275, source ISOLDE vers 115: construction en cours  226, locaux libérés par DIRAC et réaménagés pour TOTEM (lab électrique + atelier). Travaux en cours.  prêt pour stockage à BE, 8 mois (mai 2014), repoussé, date inconnue.

Space Requests - Offices Divers : Bat 602, prévu pour le mouvement du 54/3. Personne n’a déménagé. Réaménagement du 26-2 : Travaux presque terminés, délai fin de travaux respecté pour fin septembre.

Space Requests - Storage  PH cherche un emplacement pour vider le 185 au profit de ICARUS (M. Nessi). Décision de déménager au bat 190 (anciennement GIF). Le déplacement de la source est prévu mi-novembre (retard, était prévu début octobre) Démantèlement des baraques et locaux gaz. Possibilité de fin de travaux et déclassement de la zone, janvier Arrangements trouvés avec M. Nessi pour utilisation atelier (292) et locaux administratifs.

Space Requests – B275  B275 will be emptied by ISOLDE at the end of B115 works Proposals to relocate AD experiments (attached to agenda) Pre-existing proposals from ATLAS, CMS and EDU group (already presented to SPOB)

Office space stats

AoB