RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.

Slides:



Advertisements
Présentations similaires
INTERNATIONAL ENTREPRENEURSHIP Pasqualino Mare, Projectmanager KC Handel 4 Novembre 2008 Paris,
Advertisements

T. GOUINSUMPA-MED Delegation22/09/ Auteur ou Service2 décembre 2002 Thierry GOUIN Lyon, September 22 nd, 2010 DECENTRALIZATION and ORGANIZATION of.
Service Level Agreement(s).
PROGRAMME DE COOPERATION PROFESSIONELLE PONT – EST – OUEST PROGRAMME OF COOPERATION BETWEEN EAST AND WEST EUROPE BILAN DE TROIS ANNEES DE TRAVAIL THREE.
Diffusion des résultats de la recherche européenne
1 Project supported by the European Commission ECREIN Platform in Rhône-Alpes (RA) Analysis of instruments and actions to support eco-innovation and eco-investment.
Plan of WP1.5 workshop Objectives :
What is your connection to the REAL network and why is the REAL Network important to your association? ?
Click to edit Master title style Soccuper de notre personnel Investir dans leur développement professionnel Leur donner confiance en lavenir Look after.
The European works councils Group 1 PED as 4a.
1 Révision du R(CE) 388/2006 établissant un plan pluriannuel pour lexploitation durable du stock de sole du golfe de Gascogne : Évaluation du plan mis.
D2E – Direction de lEnvironnement et de lEnergie État davancement Comité de suivi Pôle Flore 16 juin 2010.
Le sondage LibQUAL à HEC Montréal Une première expérience réussie qui sintègre au processus de planification stratégique de la bibliothèque Le sondage.
Copyright 2008 © Consortium ESUP-Portail ESUP-Days 7, Paris, 3 février 2009 La démarche projet Pascal Aubry.
Impact Evaluation EVALUATION DIMPACT DE LA DISTRIBUTION DES MOUSTIQUAIRES IMPREGNEES DINSECTICIDE AU SENEGAL IMPACT EVALUATION TEAM SENEGAL Launching the.
Copyright © 2010 Systematic Présentation des enjeux Europe et International 1 Jean-Luc Beylat, Vice-Président International Systematic.
WP1.1 Policy Recommendations - Year 3
RENAISSANCE LYON Point d’avancement sur le volet “recommandations politiques” préparation Rapport Final 24/25 Avril 08- Saragosse Béatrice COUTURIER
WP Progress and Plans - Year 3
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
Facts & Figures Duration2005 – 2007 Budget 2,3 Mio. ProgrammeEFRE, Interreg IIIB Alpine Space Focus Gender Mainstreaming in administrations Gender Planning.
The Civil Aviation University World-wide CNS/ATM Systems Implementation Conference Rio de Janeiro, May 1998 Formations nécessaires.
CIPAST Citizen Participation in Science and Technology Coordination Action Science in Society Coordonnateur du projet : Cité des Sciences et.
© UMS 2414 RIATE 2010 European Observation Network for Territorial Development and Cohesion Calls for Proposals and Expression of Interests (24/01/2011.
Environmental Data Warehouse Cemagref, UR TSCF, TR MOTIVE 2011 – projet Miriphyque.
Agri-ProFocus /IPER Atelier de réflexion et de plannification IPER 9 & 10 Décember 2010 Lapproche APF-IPER ! Hedwig Bruggeman.
Building a Smart Planet PARTENAIRES ET SERVICES IBM.
SESSION1. INTRODUCTION. Bienvenue Dominique Di Biase.
1 Initiatives involving the social partners in Europe on climate change and employment policies Denmark : The experience of the Lindoe Offshore Renewable.
Catching up with the New Curriculum Steph Hopkins AST in MFL Regional Subject Adviser, London
AFTLD MEETING APRIL 2008 JOHANNESBURG ADMINISTRATION OF.ML Dr Alioune B. Traor é : administrative contact for ;ML.
Partenaires dITER Joint implementation Agreement Chine Corée du Sud Etats-Unis Fédération de Russie Japon Union Européenne + Inde Pays hôte dimplantation.
Formation forestière en Europe Forum forestier lémanique 4 juin 2008 – Collombey (Suisse) Christian SALVIGNOL – Chairman The Joint FAO/UNECE/ILO Experts.
Réseau des Tribunaux référents Network of Pilot Courts 5. Quels indicateurs pour mesurer la qualité de la justice? Which indicators for measuring the quality.
4. Programme de formation pour l'organisation d'enquêtes de satisfaction 47 Member States engaged for Democracy, Human Rights and Rule of Law.
Coopération/Distribution DEA Informatique Nancy. Content 4 Introduction - Overview 4 Coordination of virtual teams : –explicit interaction model –explicit.
ETAT DAVANCEMENT DE LEXECUTION DU RECENSEMENT GENERAL DE LA POPULATION ET DE LHABITATION (RGPH) DE LA GUINEE 3rd DU SYMPOSIM SUR LE DEVELOPPEMENT DES STATISTIQUES.
La Charte de lempowerment The empowerment Charta Eugenia Lodini Università di Bologna.
1 EURODEFENSE 20 mai 2009 May 20th 2009 Site Internet Website Marque communautaire Community Trade Mark Brand EURODEFENSE.
Sickle cell disorders Sickle cell disorders 26 February H00 – 16H00 MUSEE DE LA MEDECINE Campus Erasme Route de Lennik, Brussels 9ème Edition.
Entente Canada-Québec Devenir maître de son apprentissage en classe et hors classe Mastering the learning experience within & beyond the classroom Bruno.
EWCs - CEE - EBR The practice? La pratique? Die Praxis?
14/03/2011 United Nations Environment Programme World Conservation Monitoring Centre CCPAWA Knowledge management: Data portal and mapping tool Gestion.
EFQM 2009: Axes de travail 500 POINTS 500 POINTS Gestion Satisfaction
EUROPEAN ASSOCIATION OF DEVELOPMENT RESEARCH AND TRAINING INSTITUTES ASSOCIATION EUROPÉENNE DES INSTITUTS DE RECHERCHE ET DE FORMATION EN MATIÈRE DE DÉVELOPPEMENT.
AFNOR NF Z – "Online Consumer Reviews
Projet - Edulink - Project AUDIS -African Universities International Dimension Strengthening (2007-9) Informative Seminar Séminaire informatif Leuven,
28th Conference of Directors of Paying agencies Namur, 27 to 29 October 2010 The Belgian Presidency of the Council of the European Union Workshop 2 : Control.
Project C 5 IMPEL ELP implementation support Soutien à la mise en oeuvre du PEL Introduction IMPEL atelier CELV mars hub.
The EMPREINTE Project Juillet - octobre 2004
Centre de compétence 1 Professionalisation of the tourist guides Innoguide tourism – Mercredi 1 er février 2012 – BIP Centre de compétence.
MEDACT Mediterranean, Europe, Development, Actions of Cities and Towns Volet 2 - phase Développement urbain durable Coordination: Ville de Rome.
1 SOLARGE – Enlarging Solar Thermal Systems in Multi-Family Houses, Hotels, Public and Social Buildings in Europe Développer le solaire thermique dans.
Observations from the International Drug Policy Consortium JAMIE BRIDGE SENIOR POLICY AND OPERATIONS MANAGER AU CONFERENCE OF MINISTERS OF DRUG CONTROL.
Une petite lettre à Père Noël…. A. Blondel, G. Prior, S. Borghi,R.Sandström, E.Gschwendtner, A. Cervera, P. Bene, J.-P. Richeux, S. Gilardoni.
Le Standardized Work PSE Trainer-version 3 – sept 2004 Alain Prioul 29 Octobre 2004.
Learn from each other! Implementation bottlenecks, lessons learned and solutions retreat of CTAs and project managers in the Africa region, Maouto,
AFRICAN GROUP ON NATIONAL ACCOUNTS AGNA GROUPE AFRICAIN DE COMPTABILITÉ NATIONALE C RÉATION DU R ÉSEAU AFRICAIN DES COMPTABLES NATIONAUX.
MACROES A MACRoscope for Oceanic Earth System PI : Olivier Aumont, LPO, Brest - 7 participating labs, about 20 researchers involved - The total budget.
VTHD PROJECT (Very High Broadband Network Service): French NGI initiative C. GUILLEMOT FT / BD / FTR&D / RTA
AVEC LE SOUTIEN DE LA COMMISSION EUROPÉENNE WITH SUPPORT OF THE EUROPEAN COMMISSION 1 JUMELAGE/TWINNING BENEVOLAT ET CITOYENNETE INTERCOMMUNALE VOLUNTARY.
1 Journées prospective In2p3 - Irfu Giens 2-5 avril 2012 Crédit CERN Prospective In2p3 – Irfu et stratégie européenne 5/6/2012 S. Loucatos, DSM-Irfu.
depuis, il y a, pendant, pour
A PROJECT CO - FUNDED BY THE EUROPEAN UNION Integrated Management of risks & environment in port cities Progress meeting – Taranto 12th-15th September.
FINANCING Presented by Nathalie Le Denmat, Executive Secretary of the Committee on Local Finance Development – UCLG.
Dossier 2 depuis, il y a, pendant, pour. If you are asking a question about the duration of an action that began in the past and still continues in the.
Netwin is supported by the EU Commission in the framework of the Recite II programme Le projet Netwin est soutenu par la Commission Européenne dans le.
REMOVE EFFECTIVELY YOUR HOME WITH CHEKS ECO-ENERGY Win in quality of life and save on your electicity bills by realizing a renovation of your home.
Transcription de la présentation:

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress and Plans - Year 3 (Oct 07- oct 08) Béatrice COUTURIER Grand Lyon

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 2 WP 1.1 : Planification énergétique et urbaine

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 3 WP 1.1: Planification énergétique et urbaine Résumé du programme de travail prévu sur la période octobre 2007/mars 2008 Etat davancement -Retour dexpérience de la mise en œuvre du référentiel tertiaire sur quelques projets de bureaux -Généralization of the office environmental management guide on all the urban projects leaded by Greater Lyon -Application, from the 01/01/2009, of conditional grants principle (abatement if environmental management instructions are not respected) - Investigation of action plan about existing housing based on the experience of Zaragossa partners. Réalisé En attente désignation nouvel exécutif Approbation du dispositif en oct 2007 Lancé avec les membres du consortium lyonnais State of progress year 3: 6 first months

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 4 Analysis of progress Strong / weak points: Retour dexpérience du référentiel bureaux très positif –Peu de modifications à apporter au document Référentiel va être approuvé très prochainement Plan dactions sur lhabitat existant lancé -Site expérimental validé -Partenaires identifiés -Définition du niveau dexigence -Echange dexpériences avec des associations de copropriétaires en France How to exploit collaboration / networking opportunities - Étudier la réplicabilité de la démarche mise en œuvre sur Valdesparterra dans le contexte français WP 1.1: Planification énergétique et urbaine

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 5 Plans for the next 6 months Concernant le référentiel bureaux: Diffusion très large auprès des aménageurs et constructeurs concernés (2° et 3° trim 2008) Concernant la réhabilitation des logements existants: Recherche de solutions fiscales et financières innovantes (2° et 3° trim 2008) Mise au point du programme de travaux à réaliser sur un échantillon dimmeubles test (2° et 3° trim 2008) Echanges avec les partenaires de Saragosse sur les montages juridiques et financiers susceptibles dêtre dupliqués sur Lyon. WP 1.1: Planification énergétique et urbaine

RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 6 Conclusions Malorie CLERMONT Tel: Contact ENERTECH