© UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August.

Slides:



Advertisements
Présentations similaires
INTERNATIONAL ENTREPRENEURSHIP Pasqualino Mare, Projectmanager KC Handel 4 Novembre 2008 Paris,
Advertisements

T. GOUINSUMPA-MED Delegation22/09/ Auteur ou Service2 décembre 2002 Thierry GOUIN Lyon, September 22 nd, 2010 DECENTRALIZATION and ORGANIZATION of.
PROGRAMME DE COOPERATION PROFESSIONELLE PONT – EST – OUEST PROGRAMME OF COOPERATION BETWEEN EAST AND WEST EUROPE BILAN DE TROIS ANNEES DE TRAVAIL THREE.
OUR LAND – OUR WEALTH, OUR FUTURE, IN OUR HANDS Second Regional Preparation Workshop for the GEF Strategic Investment Program for Sustainable Land Management.
LInnovation Participative chez Solvay Club de lIris 24 novembre 2004 Robert Vincent - Competence Centre Organizational Development & TQM.
Click to edit Master title style Soccuper de notre personnel Investir dans leur développement professionnel Leur donner confiance en lavenir Look after.
GERPISA Eleventh International Colloquium June 11-13, 2003 Paris The Origins and the Limits of the Productive Models Diversity Research questions and research.
Département fédéral de lintérieur DFI Office fédéral de la statistique OFS Implementing the economic classification revision (NACE / ISIC) in the Business.
Le sondage LibQUAL à HEC Montréal Une première expérience réussie qui sintègre au processus de planification stratégique de la bibliothèque Le sondage.
Workshop/Atelier No. 3 Integrated Solid Waste Management and Resources Efficiency Towards Sustainable Development Gestion intégrée des déchets solides.
AFRICAN DEVELOPMENT BANK BANQUE AFRICAINE DE DEVELOPMENT
Copyright © 2010 Systematic Présentation des enjeux Europe et International 1 Jean-Luc Beylat, Vice-Président International Systematic.
1 AID AND THE BUDGETARY GAP : THE CASE OF MALI Abdoulaye TOURE Director General du Budget.
The implementation of the « Trames Vertes et Bleues » The example of the « biological corridors contracts » Alain CHABROLLE Vice –President « Health-Environment »
Facts & Figures Duration2005 – 2007 Budget 2,3 Mio. ProgrammeEFRE, Interreg IIIB Alpine Space Focus Gender Mainstreaming in administrations Gender Planning.
ClimDev-Africa 11 May ISACIP VIGIRISC RAZAFINDRAKOTO Léon Guy.
1 La bibliométrie pour l'évaluation stratégique des institutions de recherche : usages et limites Indicators for strategic positioning of the research.
© UMS 2414 RIATE 2010 European Observation Network for Territorial Development and Cohesion Calls for Proposals and Expression of Interests (24/01/2011.
Agri-ProFocus /IPER Atelier de réflexion et de plannification IPER 9 & 10 Décember 2010 Lapproche APF-IPER ! Hedwig Bruggeman.
Revenir aux basiques !. 1 Revenir aux basiques Processus Nécessité daméliorer la Maîtrise les Offres et Projets: lanalyse des causes racines montre un.
© 2009 IBM Corporation IBM Institute for Business Value Le Nouveau Visage du DSI Étude IBM Global Chief Information Officer Study.
SESSION1. INTRODUCTION. Bienvenue Dominique Di Biase.
INTERNATIONAL PERSPECTIVE ON THE PROTECTION OF WINE APPELLATIONS.
1 Initiatives involving the social partners in Europe on climate change and employment policies Denmark : The experience of the Lindoe Offshore Renewable.
AFTLD MEETING APRIL 2008 JOHANNESBURG ADMINISTRATION OF.ML Dr Alioune B. Traor é : administrative contact for ;ML.
Status report SOLEIL April 2008
Réseau des Tribunaux référents Network of Pilot Courts 5. Quels indicateurs pour mesurer la qualité de la justice? Which indicators for measuring the quality.
Naturopea Circonscription de Schoelcher Ecole de Plateau Didier Vendredi 16 mars 2012.
Coopération/Distribution DEA Informatique Nancy. Content 4 Introduction - Overview 4 Coordination of virtual teams : –explicit interaction model –explicit.
2iE contribution to development in Africa. A strong worldwide attractivity on-site learning: applications from 36 countries e-learning : applications.
La Charte de lempowerment The empowerment Charta Eugenia Lodini Università di Bologna.
Mise en œuvre du plan dactions pour développer et promouvoir la Fédération Internationale des Confréries Bachiques Implementation.
Présentation du programme de travail Workshop contents and objectives 23 mars 2010 / 23 March 2010 Denis RAMBAUD-MEASSON Secrétariat du CLUB-ER CLUB-ER.
Entente Canada-Québec Devenir maître de son apprentissage en classe et hors classe Mastering the learning experience within & beyond the classroom Bruno.
Approche systémique en Manche Channel systemic approach Chantier MANCHE Une approche intégrée à large échelle ______ CHANNEL programme A large scale integrated.
By Espérance Habindavyi and Janvier Nkunzebose Mombasa, th August,2013.
1 of 46 2 of 46 UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS.
Etienne and Beverly Wenger-Trayner Learning in a network Becoming a community of practice across countries Etienne Wenger-Trayner Lomé, Togo June/juin.
European Program C OMENIUS Survey – Questionnaire Survey – Questionnaire Renewable energy in its regional context, ways out of the energy crisis Energie.
* Google Confidential and Proprietary Khaled KOUBAA Public Policy & Gov't Relations Manager - North Africa Google, Inc. Research, Innovation and Entrepreneurship.
DELF Le 12 au 15 avril POURQUOI DELF? Official French language diplomas (DELF-DALF) - Why take the DELF and the DALF ? The Diplôme dEtudes en Langue.
Assessment and the new secondary curriculum S. Barfoot.
1 of of 40 UPDATE UPDATE ON TV ANTENNAS SINCE LAST BOARD MEETING SINCE LAST BOARD MEETING HELD ON FEBRUARY 25, 2010, YOUR BOARD HAS MADE MORE PROGRESS.
EUROPEAN ASSOCIATION OF DEVELOPMENT RESEARCH AND TRAINING INSTITUTES ASSOCIATION EUROPÉENNE DES INSTITUTS DE RECHERCHE ET DE FORMATION EN MATIÈRE DE DÉVELOPPEMENT.
AFNOR NF Z – "Online Consumer Reviews
Projet - Edulink - Project AUDIS -African Universities International Dimension Strengthening (2007-9) Informative Seminar Séminaire informatif Leuven,
28th Conference of Directors of Paying agencies Namur, 27 to 29 October 2010 The Belgian Presidency of the Council of the European Union Workshop 2 : Control.
Jean-Noel Guillossou Responsable du Programme SSATP Priorités stratégiques du SSATP Réunion annuelle, décembre 2012.
Project C 5 IMPEL ELP implementation support Soutien à la mise en oeuvre du PEL Introduction IMPEL atelier CELV mars hub.
Centre de compétence 1 Professionalisation of the tourist guides Innoguide tourism – Mercredi 1 er février 2012 – BIP Centre de compétence.
ATELIER RÉGIONAL ACRN 2013 « Utiliser les processus REDD et FLEGT pour garantir les droits communautaires aux forêts et à la terre en Afrique : Leçons.
Observations from the International Drug Policy Consortium JAMIE BRIDGE SENIOR POLICY AND OPERATIONS MANAGER AU CONFERENCE OF MINISTERS OF DRUG CONTROL.
International Union for Pure and Applied Physics - IUPAP to help the worldwide development of physics, to foster international cooperation.
Seite 1 Présentation Guinée Réunion Task Force CQ/SQI, Eschborn CONCOURS QUALITE IN GUINEA Context and perennity Dr Mohamed Lamine.
INVESTMENT CLIMATEDEVELOPMENT IMPACT EVALUATION INITIATIVE Piloting the Entreprenant Status: In search of a successful formalization model BENIN Impact.
Limplantation dun parc naturel marin en Martinique et le développement écotouristique : quels impacts pour les populations locales By Stéphanie Clarke.
Learn from each other! Implementation bottlenecks, lessons learned and solutions retreat of CTAs and project managers in the Africa region, Maouto,
1 Diffusion du savoir et mobilisation des connaissances Bilan de la réunion des partenaires du Domaine Justice, Police et Sécurité à Ottawa (14 novembre.
AFRICAN GROUP ON NATIONAL ACCOUNTS AGNA GROUPE AFRICAIN DE COMPTABILITÉ NATIONALE C RÉATION DU R ÉSEAU AFRICAIN DES COMPTABLES NATIONAUX.
AFRICAN GROUP ON NATIONAL ACCOUNTS AGNA GROUPE AFRICAIN DE COMPTABILITÉ NATIONALE A SSISTANCE TECHNIQUE AUX PAYS AFRICAINS EN RETARD DANS.
1 Intégration régionale et transports Regional Integration and Transport Programme de travail 2005 Work Program 2005.
Project C 5 IMPEL ELP implementation support Soutien à la mise en oeuvre du PEL Suivi et évaluation atelier CELV mars hub ELP implementation.
Regional office for Africa (RAF) Ongoing projects regarding trade in meat and livestock in West and Central Africa Methodological Workshop and launch Promoting.
INTERNATIONAL CIVIL DEFENCE ORGANIZATION ‘Protection of the population, property and the environment’ AUDITS & ADVICES AUDITS & CONSEILS
8th International Conference on psychosocial and economic aspects of HIV infection
2010 CAADP A FRICA F ORUM M EETING THE C HALLENGES OF C LIMATE C HANGE S TRATEGIES OF S MALLHOLDER FARMERS TO ACHIEVE F OOD S ECURITY AND I NCOME G ROWTH.
Better dialogue on statistics for better development results Un meilleur dialogue sur les statistiques pour de meilleurs résultats de développement Bamako,
Développer durablement les capacités nationales NTI en minimisant les coûts (Sustainable low cost approach to ICT and e-commerce capacity building ) 3ème.
Session : Modele plan d’action Template Action Plan
CONFERENCE STRATEGIQUE REGIONALE
Transcription de la présentation:

© UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August 2010, Yaounde, Cameroon Mr Claude Defoundoux, Africa Regional Programme Manager

© UPU 2010 – All rights reserved Mise en œuvre du plan pour le développement postal en Afrique 29 e session de lUPAP, 2-3 août 2010 YAOUNDE, CAMEROUN Claude Defoundoux, Chef du Programme régional pour lAfrique

© UPU 2010 – All rights reserved Results of the PDR 2006–2008 at a glance –6.13% increase in the number of post offices – 17 countries adopted the IPDP reform process – 28 countries participating in continuous testing – Significant improvement in exchanges with industrialized countries. English-speaking countries are measuring their exchanges (58.5% in J+5): outcome of global quality of service project for SAPOA countries – 17 countries have IPS and 23 countries have IPS Light (compared with 25 in 2005) – Increasingly diverse range of postal services provided. 63% of postal revenue generated by letter post (compared with 67% in 2005) – 19 countries connected to IFS network. Pilot project bringing together six West African countries: extension of service in rural areas (agreement between UPU and IFAD) – Post consolidated its presence in parcels segment in 2008, enjoying a 15.91% year-on-year increase in domestic volumes – 64% of operators offer Internet access points, 36% online services, and 21% a domestic hybrid mail service

© UPU 2010 – All rights reserved Les résultats du PDR en un clic Augmentation des bureaux de poste de 6.13%. 17 pays ont adopté le processus de réforme PIDEP. 28 pays participent au contrôle continu ; amélioration notable des échanges avec les pays industrialisés. Les pays anglophones mesurent les échanges entre eux (58.2% à j+5): résultat projet Approche globale QS en faveur des pays de la SAPOA. 17 pays ont IPS et 23 IPS-Light, contre 25 en Loffre postale est de plus en plus diversifiée (63% des revenus des postes, contre 67% en 2005, sont générés par les lettres). 19 pays sont connectés au réseau IFS. Un projet pilote à regroupe 6 pays de lAfrique de lOuest: extension du service dans les zones rurales (Accord signé entre lUPU et le FIDA). Le trafic intérieur des colis postaux a évolué de 15.91% en 2008 par rapport à 2007 dénotant dune vigueur nouvelle de la poste sur ce marché. 64% des opérateurs offrent des points daccès à Internet; 36% offrent des services en ligne et 21% offrent le courrier hybride en interne.

© UPU 2010 – All rights reserved A strategic vision: The Nairobi Postal Strategy A framework for UPU development cooperation activities The postal sector – an essential component of the global economy

© UPU 2010 – All rights reserved UNE VISION STRATEGIQUE: LA STRATEGIE POSTALE DE NAIROBI Un cadre pour les activités de la coopération au développement de lUPU Le secteur postal – un composant essentiel de léconomie mondiale

© UPU 2010 – All rights reserved Priorities of 2009–2012 RDP for Africa Postal sector reform Harmonization of postal regulations and legislation for the sustainable development of the sector Improvement in quality of service Development of electronic and financial networks and diversification of products and services Development of human resources

© UPU 2010 – All rights reserved Priorités du PDR pour lAfrique Réforme du secteur postal Harmonisation des législations et des réglementations postales pour le développement durable du secteur Amélioration de la qualité de service Développement du réseau électronique et financier et diversification des produits et services Développement des ressources humaines

© UPU 2010 – All rights reserved A tool for implementing the NPS Annex 6 A COMMON PLATFORM FOR ALL PLAYERS, ALLOWING THEM TO HAVE THE SAME OBJECTIVES AND PRIORITIES AND TO MAKE BETTER USE OF RESOURCES A COMMON PLATFORM FOR ALL PLAYERS, ALLOWING THEM TO HAVE THE SAME OBJECTIVES AND PRIORITIES AND TO MAKE BETTER USE OF RESOURCES

© UPU 2010 – All rights reserved Un outil pour la mise oeuvre de la SPN Annex 6 UNE PLATE-FORME COMMUNE À TOUS LES ACTEURS POUR UNE ADHÉSION AUX MÊMES OBJECTIFS, LE PARTAGE DES MÊMES PRIORITÉS ET UNE MEILLEURE UTILISATION DES RESSOURCES UNE PLATE-FORME COMMUNE À TOUS LES ACTEURS POUR UNE ADHÉSION AUX MÊMES OBJECTIFS, LE PARTAGE DES MÊMES PRIORITÉS ET UNE MEILLEURE UTILISATION DES RESSOURCES

© UPU 2010 – All rights reserved Projects being implemented Global approach to quality of service management: o Project for Central Africa (two workshops held) o Project for English-speaking West African countries (two workshops held) o Project for Eastern African countries (one workshop held) Intra/inter-regional surface mail transport: o Continuation of SAPOA project o Extension of ECOWAS project o Projects for Eastern and Central Africa – feasibility study Addressing projects: o Project for English-speaking countries: expertise on addressing and postcodes; monitoring of progress o Joint project with COMESA: awareness-raising, training of experts and exchange of experiences 1Improving quality of service

© UPU 2010 – All rights reserved Des projets en cours: 1. Améliorer la Qualité de service Transport du courrier intra/inter régional par voie terrestre : o Continuation du projet SAPOA; o Extension du projet des pays de la CEDEAO o Etude de faisabilité des projets pour lAfrique de lEst et du Centre Approche globale pour la gestion de la qualité de service: o Projet pour lAfrique centrale (2 ateliers organisés) o Projet pour lAfrique anglophone de louest (2 ateliers organisés) o Projet pour lAfrique de lEst (1 atelier organisé) Des projet pour ladressage: o Projet pour les pays anglophones: expertise pour adressage et codes postaux; suivi des progrès réalisés o Projet commun avec COMESA: sensibilisation, formation dexperts, échange dexpériences

© UPU 2010 – All rights reserved Projects being implemented E-connectivity oTechnopost Africa: exchange of best practices on the use of ICTs and development of e-commerce by African Posts, particularly in rural areas oE-Post project – currently being implemented by AUC, PAPU, ITU & RASCOM Development of financial services oProject for the development of postal payment services in Central Africa (first workshop held at Libreville, Gabon) oProject currently being formulated for countries of Eastern and Southern Africa 2Developing the electronic and financial network

© UPU 2010 – All rights reserved Des projets en cours: 2. Développer le réseau électronique et financier E-connectivité : oTechnopost Africa: échange de bonnes prati- ques sur lutilisation des TIC et le dévelop- pement du commerce électronique dans les postes africaines, notamment dans les zones rurales. o Projet E-Post: un projet en cours de formulation dun commun accord avec lUPAP Développement des services financiers o Un projet pour le développement des SPP en Afrique centrale (1 er atelier organisé à Libreville, Gabon) o Un projet en cours de formulation pour les pays de lAfrique de lEst et des pays dAfrique australe

© UPU 2010 – All rights reserved Developing human resources oTraining: UPU Trainpost system adopted by several countries oTraining accompanying implementation of each project Projects being implemented 3Developing HR 4Harmonizing legislation Harmonization of postal regulations and legislation for the sustainable development of the sector oImplementation of 2008 Cairo Declaration and Action Plan (issued by Ministers responsible for ICTs): coordination meeting for the functioning of the regional steering groups (Addis Ababa, June 2010)

© UPU 2010 – All rights reserved Développement des Resources humaines o Formation: Le système Trainspost de lUPU partagé par plusieurs pays projet o Formation accompagnant la conduite de chaque projet Harmonisation des législations et réglementations postales pour le développement durable du secteur oImplementation de la Déclaration et le Plan daction des Ministres des TIC du Caire 2008: réunion de concertation pour le fonctionnement des Groupes régionaux de pilotage à Addis Ababa (juin 2010) Des projets en cours: 3. Développer les RH 4. Harmoniser les législations

© UPU 2010 – All rights reserved Performance indicators Overview of results Global indicators for measuring the impact of the RDP on the region Performance indicators Expertise: RPCs Training: 40 countries connected Equipment: trucks for transport Indicators relating to the formulation and launch of the RDP Number of projects formulated by area of activity: two (on average) Number of co-financed projects: three Number of projects receiving external funding: three Number of projects launched: Ten

© UPU 2010 – All rights reserved Indicateurs de performance Résultats en bref! INDICATEURS GLOBAUX DE MESURE DE LIMPACT DU PDR SUR LA RÉGION INDICATEURS DE RÉALISATION Expertise: CPR Formation: 40 pays connectés/1387 h Équipement Équipement: Trucks pour transport INDICATEURS RELATIFS À LA FORMULATION ET AU LANCEMENT DU PDR Nombre de projets formulés par domaine dactivité: 2 en moyenne Nombre de projets cofinancés: 3 Nombre de projets ayant obtenu des financements externes: 3 Nombre de projets initiés: 10

© UPU 2010 – All rights reserved Thank you!

© UPU 2010 – All rights reserved MERCI