PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.

Slides:



Advertisements
Présentations similaires
Les noms des partenaires ____________________________________ ____________________________________ Partie A: Notre thème est: ______________________________.
Advertisements

Section HE-HH. Section HE-HH Heavy Handling in Meyrin 2013 LS1 a commencé en printemps PS: rénovation système de ventilation (désamiantage), échange.
Girls and Boys, Women and Men - respecting differences, promoting equality and sharing responsibility Filles et garçons, femmes et hommes - respecter les.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 20, 2014.
Réunion PH-DT-EM1 15 novembre 2011 Nouvelles du CERN / département / groupe, stockages matériel PH-DT [Antti] Tour de table [tous]
PH SPace Overview Board Space POlicy Board A. Petrilli, October 20, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, May 19, 2011.
PH SPace Overview Board Space POlicy Board A. Petrilli, March 31, 2011.
1 DEP PH «SPOB» SPACE POLICY BOARD 20 octobre 2010.
PH SPace Overview Board Space POlicy Board A.Petrilli, January 30, 2014.
PH SPace Overview Board Space POlicy Board A. Petrilli, August 25, 2011.
PH SPace Overview Board Space POlicy Board A.Petrilli, March 28, 2013.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 20, 2012.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 28, 2012.
Unité 2 La vie courante Leçon 3 Bon appétit
Core Module 10 Advocacy: Engaging the Public Association des conseils scolaires des écoles publiques de l’Ontario (ACÉPO) Association franco-ontarienne.
PH SPace Overview Board Space POlicy Board A.Petrilli, May 15, 2014.
Your Main Point Your Sub Points Use the word bank to complete your warm up!!! Sous Sur Derriere Devant Autour À gauche À droite.
PH SPace Overview Board Space POlicy Board A. Petrilli, June 23, 2011.
EBP-BIOSOC 4-5 June 2009 introduction. Objectives of the meeting Scientific discussions : presentation of results and agreement on major findings (back.
1 avril 2003ST Workshop 2003 Thoiry1 L’ AOC informatisé: C.Jacot, E.Sanchez-Corral, L. Symons un moyen de prévention et de management Avec la complicité.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 19, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 26, 2013.
Faith and Light International Formation Session 2010 Energizing Meetings
Adéquation « recherche appliquée et activités d ’apprentissage et de formation» par Jean Barbeau, directeur général Cégep de Saint-Hyacinthe en collaboration.
Tier1 at the CC-IN2P3 March Current state at the CC-IN2P3 storage, computation, network...
Paris, 13rd June th INTERNATIONAL PARIS AIR SHOW - LE BOURGET A RECORD-BREAKING EVENT A RECORD--BREAKING EVENT 1,926 exhibitors from 41 countries.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 13, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 18, 2013.
ÉCOLE POLYTECHNIQUE CONCOURS 2010 Workshop NSERC scholarship application 23 avril 2015 École Polytechnique.
Pile-Face 1. Parlez en français! (Full sentences) 2. One person should not dominate the conversation 3. Speak the entire time The goal: Practice! Get better.
Slide 1 of SOCIAL ACTIVITIES REGISTRATION PLEASE NOTE THAT REGISTRATION FOR THE VARIOUS SOCIAL ACTIVITIES FOR THE COMING MONTHS WILL TAKE.
Unité 2 La vie courante Leçon 3 Bon appétit. Thème et Objectifs Everyday life in France In this unit, you will learn how to get along in France. You will.
PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012.
EU Joint Programming: Belgium Expert meeting on EU Joint Programming April 26th 2013.
Your team’s name. Préselection file You have just downloaded the preselection file: it’s the first step for you to win the challenge! In this file, you.
PH SPace Overview Board Space POlicy Board A.Petrilli, September 18, 2014.
Welcome everyone.
Réparations de l’église Saint-Thomas-d’Aquin Présentation aux paroissiens Le 30 juin, 2011.
Slide 1 of Slide 2 of 35.
Slide 1 of Slide 2 of 37.
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
PH SPace Overview Board Space POlicy Board A.Petrilli, November 15, 2012.
Site report et IT Facilities. Site report : à retenir GPFS est toujours (de plus en plus utilisé) Les interconnects entre stockage et « calcul » sont.
Write your answer in French
PH SPace Overview Board Space POlicy Board A.Petrilli, June 25, 2015.
PH SPace Overview Board Space POlicy Board A.Petrilli, June 27, 2013.
Fais-moi une description de ton collège
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
EN-CV Progress EHN1 Extension Project
1 THE GESTRANS PROJECT Taking into account changing alluvial channels in flood risk assessment N° ANR-09-RISK-004/GESTRANS.
Flash-on-flash-off! You will see some French text in a minute but it will only be on the board for a minute then it will disappear.
Principes fondamentaux et meilleures pratiques de conception de laboratoire Alger, Algérie SAND P. Sandia National Laboratories est un laboratoire.
Agenda Introduction & Actions follow-up New projects
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
CCP Report CSR 15 February CSR meeting Mandate CSR Advisory body to the SCC Oversees all matters regarding restaurants/cafeterias/vending machines.
Status Report Bat  Sous-sol B13, S-011, S-018, S-022, S-043, S-049 : Réseau informatique, terminé Reste peinture antistatique et faux-plafond au.
Jean-Samy AZIZ Equipe technique ERETES 10/02/2016 Assistance technique et renforcement des capacités INSEE Technical Assistance and Capacity Building.
10 février 2016 Informatique et Réseaux – Domaine de responsabilités.
PH SPace Overview Board Space POlicy Board A. Petrilli, December 15, 2011.
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
French web site for the Linear Collider Some news to start the discussion… (  Question mark in red)
Merci de remplir le formulaire et de le renvoyer à avant le 16 mai 2016 Please complete and send to
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
Ministère de la Santé Activité de communication dans un projet H2020 Définition, enjeux de la communication d’un projet européen et usage des réseaux sociaux.
Résumé CB WLCG du 3 février 2005
Transcription de la présentation:

PH SPace Overview Board Space POlicy Board A.Petrilli, December 20, 2012

Agenda

Introduction  Agenda + minutes approval  News  GTPE, 04/12/2012  New projects  AWAKE  Short Base Line Neutrino Facility  Extension Rest. 3  Control Room East Hall (B157)  New cryo components storage between B895 and B892  Slides available if interested  Report from D. Campi on ED discussion  Building 34 preliminary ideas

Dates for SPOB in 2013  Thursday 14th of February in 1/1-025  Thursday 21st of March in 304/1-001  Thursday 16th of May in 304/1-001  Thursday 27th of June in 1/1-025  Thursday 26th of September in 1/1-025  Thursday 21st of October in 1/1-025  Thursday 19th of December in 1/1-025

Status Report  Bat  Travaux couloirs B14, Terminé, à refaire rampe d’accès suite aux dégâts des eaux, en cours  Sous-sol B13 : Peinture couloir, Terminé  En charge de GS : Finition de passage de dalles coupe- feu, modification des réseaux d’écoulement, installation d’une cloison coupe-feu et étanche + finitions. Début des travaux au 13 S-002 et locaux tech. Semaine 2.  Rénovation hall d’entrée : Reste finitions et exposition.  Rénovation amphithéâtre : Terminé.  Bat 185&610. Stockages  Réparation du SAS d’entrée.  Installation échelles de stockage, 185/610, Terminé.

Status Report  Bat 4. Sous-sol, rassemblement DAQ  Nettoyage et suppression des chemins de câbles en amiante impossible pour le moment. Installation portes coupe-feux aux 2 extrémités du couloir, début janvier  Bat , salle de réunion  Reste vidéo-conférence, programmée début janvier 2013  Bat 42, 4 salles de réunion  Reste vidéo-conférence, tables et chaises livrées et installées, salles réservables dans INDICO. Octobre-décembre 2013, démolition locaux banque, GS (travaux en horaires décalés mais risque de gène tout de même)

Space Requests - Offices Demandes de locaux en cours – PH:  1 Labo pour BASE experiment, équipements spéciaux + 2 bureaux  bureaux pour 6 pers m 2 pour des labos, R. Landua  1 bureau pour ATLAS (vers 582), en cours  2 labos pour LHCb autour du 13-14, attente fin de travaux 13/S  7 bureaux pour ALICE au 161  Accord de DIRAC pour libérer 7 bureaux au 585 au bénéfice de TOTEM, avant fin 2012, Terminé

Space Requests - Offices Demandes de locaux en cours – PH:  Un bureau demandé aux alentours du bât. 4 pour les assistants du DSO, celui proposé ne convenait pas  Un bureau demandé au 32 pour libérer de la place pour SFT.  1 Labo de 100 m 2, ATLAS, pour remplacer 251/1 (DT), souhaite l’atelier de RDC pour stockage.  1 bureau demandé pour PANDA (RD22)  1 bureau + 1 labo demandés pour AD-7 (GBAR)

Space Requests - Offices Demandes ou échanges – autres départements :  1 burotel du 51/R prêté à DG, 10/2013  TE souhaite récupérer 1 vestiaire au 180/1-Z09, donne en échange le 180/1-Y25, en attente.  510 R-033 (ancien courrier) à dispo de DG pour installer la banque du 23/09/2013 au 31 mai Suite au travaux de février 2013 pour futur installation de la banque, à dispo de HR de mars à mai 2013.

Bank works

Space Requests - Offices Divers :  Ateliers du 892 R-A02 et A04 à vider, terminé mais à rénover  Bat 275, 3 projets : EDU, CMS, ATLAS  6 bureaux libérés par AMS-RE1 au 32-4 destinés à CMS, Déménagement en cours, 4 bureaux sont prêts, toujours 2 bureaux en attente.  , local INEO vers 879, En attente  275, source ISOLDE vers 115: devis pour construire le laboratoire chez GS. Déménagement reporté à fin  892 R- entrée principale, réaménagement du hall en cours, attente du nouveau photocopieur pour faire les derniers changements.

Space Requests - Storage  PH-DT demande plus d’espace de stockage au Bat 168.  50 palettes de fibres optiques, pour débarrasser le 191-SS et 904 (PH-ESE). En attente de la part de PH-ESE, temps de stockage : indéfini  Stockage du matériel AMS dans le hall 867 qui doit être déplacé pour GIF++. Il faut trouver une place pour 2 pièces encombrantes(6,5x3,5x4 et 8x5x4), suivi par GS  Récupération d’ISR8 : En attente de contact de R. Girardot.  Stockage au 185 des aimants DIRAC + un autre (62T), DT.  Stockage de 36 caisses (350 kg/caisse) de cristaux, ALICE. Résolu -> BA5 début janvier  Stockage de 2 pièces (6T et 4T) pour W. Klempt (calorimètre CLIC-CALICE)

IdeaLab

Hosting New Ideas and Innovation Markus Nordberg Marzio Nessi - With consulting help from Chris Thomas (BE-ASR) and Aalto University Design Factory

Basic Idea Purpose: Co-innovate jointly with CERN experiments, industry and young researchers new technologies for both internal (CERN) and external (societal) needs. Offer simple prototyping and testing facilities. Host students, young researchers paid by EU. Make it an appealing VIP-visit itinerary Focus: detector-related sensor, instrumentation, computing and related infrastructure projects benefiting experiments and health, energy, sustainable materials and ICT Method: Facilitate ATLAB and CMS(Lab?) upgrade activities, involving the experts from experiments, students, and industrial partners. Expand as need arises. Proceed in stages – could help to host a wider DRDC-type of R&D initiative (?) Philosophy: Open, accessible, “Common R&D playground” Financing: EU-funding, private contributions

Basic Requirements LARGE Open (Hall) Space Needs to have a catchy name. Building number is not enough. Entrance that strikes “Wow, there’s something exciting happening here.” (for VIP visitors) Meeting rooms/areas Presentation/event space for approx. 50 people Café area (kitchen?) Workshop space Visitor info + attractions, but not disturbing the people working there

Basic Requirements 2: Open (Hall) Space Accessible (location important) Flexible (preferably big open space with basic infra) Scalable (cost-effective, fast to set up) For collaboration and co-creation (needs of primary users are #1).

Basic Requirements 3 Also required: Reserved space for each project Hotdesk (“ad-hoc”) working space... but also silent working space is needed Teleconferencing/ individual phone/ conf booths Limited storage for small material Fun/Play/Game area (recreation, relaxation area) Mandatory social utilities etc.

Capacity Requirements Initial phase, ~ 5 projects for ATLAB and 2 for CMS project personnel, including Marie Curie Fellows and related personnel from CERN and experiments of which 5-25 daily users Special events and visitors peak usage approx. 2 x 550 m2 space needed for both ATLAB and CMSLab

Possible to renovate some existing hall space ?

A Hall with Containers ?

Not so Unusual... See Group8 (Geneva)

A Possible Basic Design per 500m2 module

Discussion and decisions  Status of 2012 works being finalized  List of works needed for 2013 and beyond

Works Done/Started in 2012

Consolidation works

Consolidation works

Technical Space Plan 10Y  Requested from 4 LHC experiments and DT group  Received ALICE, DT and LHCb  CMS near completion (a few days)  ATLAS  Attach to the agenda?

AoB