La présentation est en train de télécharger. S'il vous plaît, attendez

La présentation est en train de télécharger. S'il vous plaît, attendez

1 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL April 2008.

Présentations similaires


Présentation au sujet: "1 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL April 2008."— Transcription de la présentation:

1 1 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL April 2008

2 2 April 2008 – Tango Meeting – A.Buteau Our problems are changing

3 3 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 What do we have to manage today The Accelerator which is in routine operation About 10 beamlines which have external users and are also in routine operation About 5 beamlines which are in the installation or commissioning phases

4 4 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 The challenges are now different New features are requested by Machine and Beamlines But They should not impact production system !! How to keep things extensible, flexible but robust How to solve the « Open/Close paradigm » ?

5 5 April 2008 – Tango Meeting – A.Buteau How to keep things manageable ?

6 6 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Our vision to keep things manageable are still the same Standardize software !! At the component level Device GUI Components GUI applications Process (or sequence) component Let Machine or Beamline assemble themself the components Through GlobalSCREEN fot GUI construction Or Through Passerelle for Process oriented task

7 7 April 2008 – Tango Meeting – A.Buteau Niveau 1 Niveau 2 Java applications : salsa Process & calculation devices Device Chooch Device ISPyB Device Equipment and subsystem devices Hardware access devices Device TANGO Devices Séquence EScan Séquence xxx BossaNova Intégration dans GBS: des applications java Des composants métiers Passerelle : moteur dexécution des séquences mambo Niveau 3 Device DNA

8 8 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 How to fiabilize software components Have as many users of them as possible ! The same version of all software components are installed everywhre at SOLEIL during each shutdown It helps us on the support side See figures later

9 9 April 2008 – Tango Meeting – A.Buteau Successes and difficulties

10 10 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Successes Standardisation at the Dservers is a success Many Dservers shared between Machine and BL or between Bls About 250 Dservers are in production Standardisation of application is in many cases a real success For example SALSA is used on 90% of the Beamlines And by the way NeXus file format is now a de facto standard for data file format at SOLEIL Idem for MAMBO, BENSIKIN, etc..

11 11 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Successes Standardisation at GUI Components level Almost 40 GlobalSCREEN application routinely used With a «standardized » look and feel

12 12 April 2008 – Tango Meeting – A.Buteau Application standardisation

13 13 April 2008 – Tango Meeting – A.Buteau Interventions Astreintes ICA (hors heures ouvrables) pendant le Run 1 En moyenne: 2, 25 interventions par semaine Contre 3,25 interventions par semaine en janvier et 4,5 interventions/semaine au run de décembre A noter que 4 interventions sur 9 sont en réalité des problèmes équipements et pas informatiques

14 14 April 2008 – Tango Meeting – A.Buteau Interventions Permanence ICA (pendant heures ouvrables) pendant le Run 2 En moyenne: 6,6 interventions par semaine

15 15 April 2008 – Tango Meeting – A.Buteau What are we doing ?

16 16 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Difficulties Project management, coordination, project management, coordination, … Phasing our development with Beamline or Machine test periods

17 17 April 2008 – Tango Meeting – A.Buteau The next phase : Integration at high level

18 18 April 2008 – Tango Meeting – A.Buteau Application intégrée : Exemple sur TEMPO Réglage de léchantillon Acquisition pour les expériences de Photo-emission Résonnante Suivi des données en cours de stockage Supervision et contrôle des équipements

19 19 April 2008 – Tango Meeting – A.Buteau Application intégrée : Exemple sur TEMPO Configuration de la séquence dacquisition Suivi du déroulement de lacquisition Visualisation des données en cours dacquisition


Télécharger ppt "1 April 2008 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL April 2008."

Présentations similaires


Annonces Google