AUG Risk Analysis.

Slides:



Advertisements
Présentations similaires
Safety at CERN La sécurité au CERN
Advertisements

URGENCE MÉDICALE INCENDIE
EHN1 – visiting point at the OD2013 Ilias Efthymiopoulos, Adrian Fabich, MEF-LE ENMB, 9 th September 2013.
What is the nanotechnology History applications of nanotechnology Conclusion.
Forming questions in French
Les Mots Interrogatifs
Object pronouns How to say “him”, “her”, “it”, “them”
1. Est-ce que Est-ce que, literally translated "is it that," can be placed at the beginning of any affirmative sentence to turn it into a question: Je.
WILF: TO BE ABLE TO GIVE AN OPINION FOR LEVEL 3
7/9/2016Français de base1 Le passé composé Une révision.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
J’habite dans une petite maison. J’habite dans une maison jumellé.
EHN1 Extension Identification of the different phases of the project and safety aspects G. Cumer EN/ACE & B. Raë EN-EA.
An Introduction To Two – Port Networks The University of Tennessee Electrical and Computer Engineering Knoxville, TN wlg.
Traffic Sign Recognition Jacob Carlson Sean St. Onge Advisor: Dr. Thomas L. Stewart.
 Components have ratings  Ratings can be Voltage, Current or Power (Volts, Amps or Watts  If a Current of Power rating is exceeded the component overheats.
SEW Maintenance Series ReplacingaStator SEW-EURODRIVE—Driving the world.
Update on Edge BI pricing January ©2011 SAP AG. All rights reserved.2 Confidential What you told us about the new Edge BI pricing Full Web Intelligence.
EHN1 EXTENSION PROPOSITION EN/EL ECLAIRAGE DE SECURITE ECLAIRAGE MINIMUM ARRET D’URGENCE T. Octave
EHN1 EXTENSION PROPOSITION EN/EL ECLAIRAGE DE SECURITE ECLAIRAGE MINIMUM ARRET D’URGENCE T. Octave
Les questions Grammaire: p
Travaux alimentation électrique SLX8 (3852)
Past Tense (Past Perfect)
Où? d’Unité 3, leçon 6.
Le Verbe Aller au Présent
Infinitive There are 3 groups of REGULAR verbs in French: verbs ending with -ER = 1st group verbs ending with -IR = 2nd group verbs ending with -RE = 3rd.
Speaking Exam Preparation
EHN1_NP : Campagnes de câblage et planning
71th EAs integration and coordination meeting - EHN1 extension
Imparfait v. Passé Composé
EHN1_NP _ 13 juillet 2017 Liste des actions G. Cumer EN/ACE.
70th EAs integration and coordination meeting - EHN1 extension
Une Maison. Une Maison Vous posez des questions Hello, I would like to have more information on this property? How many rooms are there? Is it in a.
How do the characteristics of desert animals help them adapt to their environment?
mercredi, le onze octobre
Réunion service Instrumentation Activités CMS-Traces
J’ai besoin de parler du passe….
Hotel Divisions & Departments. Departments in Rooms Division Front Office is responsible for guest registration and check-out. It includes mail and information.
North area S. Girod, EATM,
French 1st Level The Weather.
Theme One Speaking Questions
There are so many types of sports. For example-: Basketball,volleyball, cricket, badminton, table tennis, football, lawn tennis etc.
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
72th EAs integration and coordination meeting - EHN1 extension
P&ID SYMBOLS. P&IDs Piping and Instrumentation Diagrams or simply P&IDs are the “schematics” used in the field of instrumentation and control (Automation)
Passe Compose Review Gr. 8 lesson.
Imparfait v. Passé Composé
Imparfait v. Passé Composé
Pato et Elly font du sport aussi.
Benchmarking noise policies
Nous allons apprendre…
Nous allons apprendre les fruits!
Smart antennas (also known as adaptive array antennas, digital antenna arrays, multiple antennas and, recently, MIMO) are antenna arrays with smart signal.
8.2 vocabulary Une maison Un appartement Un immeuble.
Question formation In English, you can change a statement into a question by adding a helping verb (auxiliary): does he sing? do we sing? did they sing.
Mardi 30 octobre Français I, II, PreAP/AP
Pato et Elly font du sport aussi.
Les formes et les couleurs
Les Comparaisons.
les formes et les couleurs
Nous allons apprendre des fruits!
Safety Talk EN DSO & EROS
Safety Talk EN DSO & EROS
Les Mots Intérrogatifs
VERB CONJUGATIONS PRESENT TENSE.
Safety Talk EN DSO & EROS
Les opinions Les opinions = Opinions. In this lesson pupils will learn to understand and give their own opinions about singular items.
John 20:19-30 ICEL April 23, 2017.
Safety Talk EN DSO & EROS
IMPROVING PF’s M&E APPROACH AND LEARNING STRATEGY Sylvain N’CHO M&E Manager IPA-Cote d’Ivoire.
Transcription de la présentation:

AUG Risk Analysis

But de la reunion : Prendre en compte: Définir l’emplacement des AUG en fonction des chemins d’évacuation mais aussi des risques et de l’implantation des équipements Définir l’emplacement des points d’éclairage de balisage en fonction des chemins d’évacuation et de l’implantation des équipements Prendre en compte: Ce qui ne doit pas être coupé sur AUG (cheminements dédiés et repérages équipements selon IS5) Combien de chaines AUG sont à implémenter (identification / localisation par les pompiers) fosses – hall cote JURA – hall cote Salève –galerie ? A noter que les AUG dans l’extension doivent avoir la même logique de déclenchement que EHN1 actuel (IS5)

Rappel règles HSE : AUG: The General Emergency Stop (often referred to as AUG, Arrêt d’Urgence Generale) is a level 3 alarm button, which shall cut the electrical power at 18 kV level and inform the fire brigade (see also IS5). It does not trigger the evacuation alarm. The AUG red buttons shall be placed along the corridors about every 25 m, taking into account the AUGs placed on the outside of the PPEs /PPXs (access safety doors of the beam zones), of the ground floor, the first floor, the upper gallery and in the underground galleries of the building. AUL: The AUL shall cut the electrical power of the local area. Such a local area could be a single barrack (e.g. for beam instrumentation (BI) or a clean room or a work shop) or a user’s control room barrack (or group of) together with the associated beam zone(s). The AUL button is placed in the beam zone and the associated barracks. There could be several AUL buttons per barrack group and beam zone (depending on the size). There are also equipment stop button(s), which are not discussed here (e.g. workshops, racks…) and which shall not be confused with an AUL. The AUL only cuts the power of the socket outlets and fixed users’ installations in the respective zone, but does not cut the power of beam line instrumentation (BI) and magnets in there. Latter elements are only stopped using the AUG. BI barracks shall be equipped with their individual AUL.

Rappel règles HSE:

Rappel règles HSE:

Useful documentation IS5: https://edms.cern.ch/ui/file/335742/LAST_RELEASED/IS5_F.pdf IS37: https://edms.cern.ch/ui/file/335802/LAST_RELEASED/IS37_F.pdf Guide de sécurité: Installation éclairage de sécurité : https://edms.cern.ch/document/1167351/3 Safety Systems of the General Infrastructure in SBA: https://edms.cern.ch/document/1365914/1.0