HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.

Slides:



Advertisements
Présentations similaires
How to play Divide class into 2 teams Teams take in turns to pick a number, read the word aloud & identify the word class and decide if they want to keep.
Advertisements

Le verbe faire au présent
REPLIES TO INQURIES=REPONSES A DES DEMANDES. Replies to inquiries 1.We acknowledge receipt of your letter dated 7 july. 1.We acknowledge receipt of your.
Mesures d'association: La corrélation par paire Mitchell Brown Université d'Auburn This material is distributed under an Attribution-NonCommercial-ShareAlike.
Français 1b OPT Benchmark Oral Exam Begins Tuesday, May 29, 2012.
0 X 00 X X X 2 is your birthday? BACK portable - grand.
L’ensemble microcanonique
Civil engineering for LIU – PS
Finger Rhyme 6 Summer Term Module 6 Culturethèque-ifru2013 May not be copied for commercial purposes.
Finger Rhyme 4 Spring Term Module 4 Culturethèque-ifru2013 May not be copied for commercial purposes.
Slide 1 of 39 Waterside Village Fête ses 20 ans.
CEOS.fr C OMPORTEMENT ET E VALUATION DES O UVRAGES S PECIAUX vis-à-vis de la f issuration et du r etrait CEOS.fr C OMPORTEMENT ET E VALUATION DES O UVRAGES.
© Copyright Showeet.com S OCIAL M EDIA T HINKING.
Un Sourire ... Texte original en français : Raoul Follereau
Energy optimization in a manufacturing plant Journée GOThA Ordonnancement avec contraintes d’énergie et/ou de ressources périssables LAAS-CNRS Toulouse.
ASTRID BREUER Le passé compose avec le verbe être.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
C’est combien ? Les euros
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
Français III projet cinématique (votre film). les critères Create a 3 minute film with a 1 minute introduction. The introduction must explain briefly.
Building 867 Controlled facility for the repair of radiated material 1 Betty Magnin TE-MPE-EMRadWG 05/12/12.
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting Update on Q1 TAS REGION (18 to 22m), layouts.
LHCb VELO DELPHI. ? Requires space will be of the order of 120m 2. DELPHI equipment will probably not be used before LHCb.
Objectifs Today we will work on:  Days of the week  Months of the year  Exchanging simple spoken and written information in French Activité  Completez.
THE ADJECTIVES: BEAU, NOUVEAU AND VIEUX 1.
Questions: -W-W-W-What are their main tasks? - What skills should laboratory technicians have? (quote at least 6) -W-W-W-Why is it important for a lab.
L’environnement WALT: To be able to produce an environmental campaign poster WILF: A range of complex phrases and tenses for grade C+ 13/04/2017.
L’Heure To ask what time it is in French, say: – Quelle heure est-il? To respond, say: – Il est... heure(s). – Ex: 02h00 Il est deux heures. 04h00 Il est.
2 Le verbe « être » au pluriel Les normes: Communication 1.2 Comparisons 4.1 Les questions essentielles: - What are the plural subject pronouns in French?
MPE Workshop 14/12/2010 Building 867 A controlled facility for the repair of radiated material Betty Magnin TE-MPE-EM 1.
GCSE Speaking Assessment Presentation Based Discussion In your first GCSE Speaking Assessment, you are being interviewed by your French friend for their.
Les pronoms sujets Singular subject pronouns. Les normes: Communication 1.2 Comparisons 4.2  Les questions essentielles:  What is a subject pronoun?
Hydraulic Engineering. Water Hammer Phenomenon in pipelines.
La Francophonie et le temps... Countries where French is spoken and the weather...
Let’s enjoy making Session 4. Let’s enjoy making: Session 4 Le matériel.
10 STRINGS FOR YOU.
Slide 1 of Slide 2 of 35.
LO: To be able to talk about global issues in French.
Slide 1 of Slide 2 of 37.
New Generation, Natural Gas, Natural Growth, Propositions pour le projet GICAN NFI / navire souteur GNL
Les pronoms démonstratifs
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
© Crown copyright 2011, Department for Education These materials have been designed to be reproduced for internal circulation, research and teaching or.
Agence fédérale pour la Sécurité de la Chaîne alimentaire 1 Problems in the valorization of cattle feet in slaughterhouses Federal Agency for the Safety.
EN-CV Progress EHN1 Extension Project
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
Journees de prospective LAL/ Seillac 2012
Bienvenue! Instructions: Take out your “smiley face paper” and study your notes for two minutes. We will be reviewing all of the vocabulary today for body.
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
Airport Region Conference 20 Novembre 2015
PASSÉ COMPOSÉ WITH ÊTRE
Gilles OLIVIER Orsay, le 18 février CRYOMODULE ESS ELLIPTIQUES CRYOMODULE ESS CAVITES ELLIPTIQUES Réunion CEA / IPNO ORSAY, le 18 février 2015 Unité.
ROBERT REICH “Inequality For All”. → Born in 1946 ROBERT REICH → is an American political economist, professor, author → He served in the administrations.
Je vends ma bicyclette … verte
Negative sentences Questions
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
Put these phrases into 4 categories, and decide on a title for each category. There may be more than one possible answer! boire de l’eau manger des fruits.
Template Provided By Genigraphics – Replace This Text With Your Title John Smith, MD 1 ; Jane Doe, PhD 2 ; Frederick Smith, MD, PhD 1,2 1.
Les pronoms démonstratifs
The nation now known as The Democratic Republic of Congo was at one time the personal property of the King of Belgium.
Mon enfance Quand tu étais petit, tu étais comment?
mercredi, le treize septembre
mardi, le douze septembre
Le verbe « être » au pluriel
What’s the weather like?
Lequel The Last Part.
Use inversion to form questions.
Transcription de la présentation:

HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014

For memory: Scientific Motivation  To test equipment under the worst case conditions it may encounter in case of full beam impact  To validate the diluting materials used in TPSG4  To demonstrate the MSE is properly protected by TPSG4  To benchmark advanced numerical simulations HiRadMat Operations meeting 5/3/2014

Test setup overview Beam HiRadMat Operations meeting 5/3/2014 TPSG4 MSE

The real deal! HiRadMat Operations meeting 5/3/2014

Mise en stand-by avant démontage Accès restreintIsolation circuit HRMT/circuit TPSG4 : fermeture vannes ¼ tour coté mur Vidange pression circuit : ouverture vanne ¼ tour sur panneau MSE (prise échantillon eau pour analyse RP). Résultat : 2483 Bq/L le 10/12/12 (limite exemption : < Bq/L). TE-ABT RP HiRadMat Operations meeting 5/3/2014 Test pression bobine MSE Groupe pompage primaire mobile + détecteur Rack alimentation VPI déporté vers TJ7 Azote/Hélium Pompe primaire Connexion sur vanne équerre TPSG4 Pompage primaire Détection globale fuites Connexion vannes équerres sur sorties bobines MSE (côté paroi) + pompage avec pompe primaire Mise sous pression bobine MSE 20 bar Helium Détection fuites sur détecteur TE-VSC TE-ABT Mise en place blocs aciers Pont avec système automatique, blocs acier 220kg, 430kg, chandelles Mode Remote, en premier, MSE puis TPSG4 Attention à l’élingage du système automatique (au plus court) Installation de chandelles sous les « paniers » blocs avant l’opération. 1 bloc 430kg dans MSE 1 bloc 430kg + 1 demi-bloc 220kg dans TPSG4 EN-HE Démontage Tanks TPSG4/MSE Bouteille azote, flexibles, soupape de sécurité tarée 0.4 bar MAX., outillage Pont roulant, crochets adaptés Remorque 4x1.25x0.5m 5T MAFI SPS pour MSE Remorque 3.5x1.25x0.5m 10T MAFI SPS TPSG4 Ouverture collier bride, entrée azote sans surpression pour éviter poussières dans l’atmosphère sur MSE uniquement (les poussières restent dans le TPSG4). compression soufflet TPSG4, (inspection visuelle intérieur TPSG4 et MSE) mise en place de tap fermeture provisoire (alu+plastique) sur TPSG4 + arrêt azote sur MSE+ fermeture tap MSE. ajout 2 blocs acier gris sur MSE coté pied fixe dans panier (déplacer le cadre hydraulique – clé BTR) ajout 5 blocs acier gris sur TPSG4 coté pied fixe dans panier Crochets sur TPSG4 : SPSXMHA-0001/0014 (standard crochets table) Crochets sur MSE : SPSXMHA-0001 pied fixe/ SPSXMHA ? crochet bloc latéral sur pied double Crans: 7 depuis l’extrémité palonnier pont roulant TPSG4 (entraxe crochet : 2700mm) Crans : 7 depuis l’intérieur palonnier pont MSE (entraxe crochet : 1800mm) Décollage/levage des pieds de leurs supports Dépose sur remorque adaptée + châssis transport du TPSG4 et du MSE (dans cet ordre) TE-VSC TE-ABT Manutention TransportPont avec crochets adaptés Transfert TPSG4 vers remorque adaptée après fermeture bride sur soufflet + blocage position VPI Transfert MSE vers remorque adaptée après fermeture bride Remontée TNC vers SD/PM18 pour transfert sur camion EN-HE RP Transport Démontage châssis support Pont, crochets adaptés SPSXMHA— 0039/0038 Position crochets châssis table A : décaler au maximum coté amont /entraxe : 1700mm Position crochets châssis table B/C : 6 crans depuis l’intérieur / entraxe : 1700 mm Dépose sur palettes avec carrelets bois EN-HE Transfert TNC-TJ7-BA7-867/955Même conditions que l’allerPalonniers, fiche de transfert, pieds spéciaux transports, arrimageTransport, RP Transfert TNC/955 Rack accumulateur (garder le mano.), flexibles, enrouleurs, brides DN65, câbles HT/signal Diamond detectors 867/955ReconditionnementRéutilisation de composants pour rénovation et fiche identification des déchets radioactifsTE-ABT, RP Phase Post-Irradiation et Démontage Dismantling procedure mentioned in the safety file of HRMT#6, presented during safety review of 28/9/2012.

RP Analysis HiRadMat Operations meeting 5/3/2014 Planned Cooling period Max. residual dose contact [Sv/h] Max. residual dose 40 cm [Sv/h] 1 hour E-2 1 day1.7E-2 1.5E-3 1 week6.0E-3 5.4E-4 1 month1.3E-3 1.2E-4 4 month2.0E-5 Estimated dose (06/2012) Real dose (11/2012) TPSG4 MSE

Proposed planning April 2014 Week 14: leak test of MSE in TNL (20bar He). Week 15: removal equipment from TNL: – MSE -> blg 955 – TPSG4 -> blg 867 – hydraulics rack and electronics and frames -> blg 955 Wk 16: removal of TPSG4 from vacuum vessel in bunker of blg 867 for visual inspection. Wk 17: planning of repair of TPSG4 (worst case), insertion of TPSG4 in tank to be stored in blg 955. HiRadMat Operations meeting 5/3/2014

Radioprotection related issues WDP, to be done still IMPACT, to be created for HRMT. A separate one for 867? Specific RP requirements for bunker? HiRadMat Operations meeting 5/3/2014

Thank you for your attention. HiRadMat Operations meeting 5/3/2014