The implementation of the « Trames Vertes et Bleues » The example of the « biological corridors contracts » Alain CHABROLLE Vice –President « Health-Environment »

Slides:



Advertisements
Présentations similaires
INTERNATIONAL ENTREPRENEURSHIP Pasqualino Mare, Projectmanager KC Handel 4 Novembre 2008 Paris,
Advertisements

Digital geospatial public domain ?
1 Project supported by the European Commission ECREIN Platform in Rhône-Alpes (RA) Analysis of instruments and actions to support eco-innovation and eco-investment.
What is your connection to the REAL network and why is the REAL Network important to your association? ?
GINIE Data Policy workshop France F. Salgé G. Bertrand Y. Riallant.
OUR LAND – OUR WEALTH, OUR FUTURE, IN OUR HANDS Second Regional Preparation Workshop for the GEF Strategic Investment Program for Sustainable Land Management.
Council of Europe Seminar on Counterfeit Medicines September 05 1 Aim of the seminar Is there a problem? Yes Do we need action?Yes Is there commitment?Yes.
The French Platform : a public-private partnership
Un risque « oublié » dans l’Océan Indien: le tsunami
Le sondage LibQUAL à HEC Montréal Une première expérience réussie qui sintègre au processus de planification stratégique de la bibliothèque Le sondage.
KS2 Yr6 French – Lesson 80 Places in town.
Branche Développement Cnet La communication de ce document est soumise à autorisation du Cnet © France Télécom - (Nom du fichier) - D1 - 11/01/2014 Diffusion.
© UMS 2414 RIATE 2010 European Observation Network for Territorial Development and Cohesion Calls for Proposals and Expression of Interests (24/01/2011.
Communications pour le Voyage détude à Strasbourg (29-31 mars 2009) / Information about the study trip to Strasbourg (29th-31st March 2009) Château de.
Revenir aux basiques !. 1 Revenir aux basiques Processus Nécessité daméliorer la Maîtrise les Offres et Projets: lanalyse des causes racines montre un.
La formation des questions Reflect a bit… Reflect a bit… Pourquoi est-il important de poser les questions? Pourquoi est-il important de poser les questions?
La formation des questions Reflect a bit… Reflect a bit… Pourquoi est-il important de poser les questions? Pourquoi est-il important de poser les questions?
French 3 & 4 October 17, When I was teaching in France, most of my students had all of their classes with the same group of people. How would this.
1 Initiatives involving the social partners in Europe on climate change and employment policies Denmark : The experience of the Lindoe Offshore Renewable.
ICZM experience in Tunisia: preliminary results and lessons learned from the SMAP III- Tunisia project Alessandra Pomé WWF Mediterranean Programme Office.
Infrastructures Working Group Meeting - Brussels, 13 October Comments on the TMN-T first proposal Commentaires sur la première proposition du RTM-T.
Approche systémique en Manche Channel systemic approach Chantier MANCHE Une approche intégrée à large échelle ______ CHANNEL programme A large scale integrated.
2014 CIPAC/FAO/WHO Meeting Liège, Belgium 17 – 26 June 2014
Le rôle des adultes pour lélève acteur Adult role for the student actor Eugenia Lodini Università di Bologna Italy.
Le niveau de vie des étudiants en Europe The standard of living of the students in Europe Observatoire de la vie étudiante / France Padoue Ronan.
Defence Research and Development Canada Recherche et développement pour la défense Canada Canada 11-1.
CGDD/SOeS/ Sous-Direction de linformation environnementale / Bureau de léconomie, des risques et des perceptions de lenvironnement Club Risques du 30 mars.
Core Module 9 Family and Community Engagement Association des conseils scolaires des écoles publiques de lOntario (ACÉPO) Association franco-ontarienne.
EUROPEAN ASSOCIATION OF DEVELOPMENT RESEARCH AND TRAINING INSTITUTES ASSOCIATION EUROPÉENNE DES INSTITUTS DE RECHERCHE ET DE FORMATION EN MATIÈRE DE DÉVELOPPEMENT.
AFNOR NF Z – "Online Consumer Reviews
ALAI 2001, New York The protection of technological measures and the exceptions and limitations to copyright M e François Lajeunesse Avocat principal/Senior.
The EMPREINTE Project Juillet - octobre 2004
Plateformes de la KIC - climat. | 26 September 2012 | Slide 2 Agriculture and water/ Precision agriculture (1) Vision 2020 Fabienne Trolard Water storage.
Bienvenue à la classe de français!
ATELIER RÉGIONAL ACRN 2013 « Utiliser les processus REDD et FLEGT pour garantir les droits communautaires aux forêts et à la terre en Afrique : Leçons.
Integrated Coastal Area Management
Astroparticle Physics European Coordination between European Funding Agencies: France, Germany, Italy, United Kingdom, The Netherlands, Spain, Greece,

INVESTMENT CLIMATEDEVELOPMENT IMPACT EVALUATION INITIATIVE Piloting the Entreprenant Status: In search of a successful formalization model BENIN Impact.
Et Carnaval. What does Mardi Gras mean? Mardi Tuesday GrasFat So the meaning is « Fat Tuesday » ! Mardi Gras is the French for « Shrove Tuesday » or «
Le Baromètre Zone Cours : un environnement pour la micro-évaluation de ressources pédagogiques* Jacques Raynauld Olivier Gerbé HEC Montréal, MATI Montréal.
To be able to say what I think about different jobs for level 3.
AFRICAN GROUP ON NATIONAL ACCOUNTS AGNA GROUPE AFRICAIN DE COMPTABILITÉ NATIONALE C RÉATION DU R ÉSEAU AFRICAIN DES COMPTABLES NATIONAUX.
1 Intégration régionale et transports Regional Integration and Transport Programme de travail 2005 Work Program 2005.
The political ecnomy of tourism development in Tolagnaro (Madagascar) Utilization of natural resources in the struggle against poverty Bruno Sarrasin Professeur.
Qu’est-ce que tu portes? Je porte un tee-shirt rouge.
APEEE Association des Parents d‘Elèves de l’Ecole Européenne Réunion des représentants de classe Meeting of Class representatives 7 novembre November.
INTERNATIONAL CIVIL DEFENCE ORGANIZATION ‘Protection of the population, property and the environment’ AUDITS & ADVICES AUDITS & CONSEILS
VTHD PROJECT (Very High Broadband Network Service): French NGI initiative C. GUILLEMOT FT / BD / FTR&D / RTA
AVEC LE SOUTIEN DE LA COMMISSION EUROPÉENNE WITH SUPPORT OF THE EUROPEAN COMMISSION 1 JUMELAGE/TWINNING BENEVOLAT ET CITOYENNETE INTERCOMMUNALE VOLUNTARY.
The new or evolving “access right” Le nouveau “droit d’accès aux oeuvres” Alain Strowel Professeur Facultés Saint-Louis et Université de Liège, Avocat,
Leçon 25.
La Grammaire: Indefinite articles and plural of nouns Page 24.
A KEY INSTRUMENT FOR DECENTRALISATION
Belgian Breast Meeting Senator F. Roelants du Vivier 13th october.
Adolescents - supporting their transition to adulthood Adolescents - soutenir la transition vers l’âge adulte.
Unité 2 La vie courante Leçon 3 Bon appétit. Thème et Objectifs Everyday life in France In this unit, you will learn how to get along in France. You will.
Marseille, 22 November 2007 MINISTRY OF ECONOMY & FINANCE
Unité 2 La vie courante Leçon 3 Bon appétit. Thème et Objectifs Everyday life in France In this unit, you will learn how to get along in France. You will.
Commencez Écrivez ta date d’anniversaire et faites la queue en ordre des mois de l’année. [Write your birth date in French on a card and line up according.
Welcome everyone.
Passé, présent et futur lundi huit octobre WALT Recognise the past, present and future WILF Work at text level (NC Level 6)
Session : Modele plan d’action Template Action Plan
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
Airport Region Conference 20 Novembre 2015
French 1 Chapter 2 Grammar 2
République Démocratique du Congo Ministère des Finances Comité Technique de suivi et évaluation des Réformes (CTR) DRC National REDD+ Fund Linkages between.
La procédure d’élaboration des rapports: but et avantages
IMPORTANT JULY 31st THE START OF SEAL COATING TO LAST DAYS. LOOK FOR UPDATES AT THE GATE AND NOTICES ON CARS WHEN YOUR AREA WILL BE CLOSED.
Transcription de la présentation:

The implementation of the « Trames Vertes et Bleues » The example of the « biological corridors contracts » Alain CHABROLLE Vice –President « Health-Environment » Rhône-Alpes Region

Objectives of the corridor Contracts Bauges-Chartreuse Chartreuse-Belledonne Grésivaudan Franco-valdo-genevois Saint Etienne Métropole Bièvre Valloire Trièves Pilat Massif Central Support local actors in the implementation of concrete projects aiming at preserving or restoring the ecological connectivity of a territory

The corridor Contracts La mise en œuvre de la Trame Verte et Bleue L’exemple des Contrats « corridors biologiques » The corridor Contracts a necessary preliminary study phase preparing the redaction of a 5-years action plan

Une nécessaire phase d’étude préalable Cartographie du territoire à une échelle minimum de 1/25 000 ème : Réservoirs de biodiversité Corridors existants ou à créer Points de conflit Futurs projets d’aménagement… Diagnostic et analyse des enjeux Rédaction d’un plan d’action pluriannuel Dans un cadre concerté Portée par une collectivité ou une association Approche globale : espaces naturels remarquables + nature ordinaire Échelle intercommunale Cartographie du territoire à une échelle minimum de 1/25 000 ème : Réservoirs de biodiversité Corridors existants ou à créer Points de conflit Futurs projets d’aménagement… Cartographie affinée

Action plan organized in 4 sections: Integration of « ecological connectivity » issues in regulatory documents, Work of preservation or restoration of the connectivity, Complementary studies and action monitoring programs, Communication, pedagogy and project animation,

Governance Steering Committee Other partners Head structure Region Water Agency DDT DREAL Scientists Other partners Collectivité Head structure Nature protection associations Equipment provider (rail, electricity…) Hunters, fishermen Sub-regional authorities Agriculture Chambers Implementation Agriculture and land planning Communication Commissions thématiques 1 structure porteuse unique : collectivité Assure le suivi administratif et financier du contrat, Coordonne le déroulement des actions, Anime le comité de pilotage. 1 comité de pilotage Regroupe les acteurs représentatifs, Valide la déclinaison annuelle du programme d’actions, apprécie son exécution et veille à l’atteinte des objectifs Fait le lien avec les autres procédures en cours.

Action examples Integration in urban planning documents

In this frame, Saint-Etienne Metropolitain area will offer the towns 4 days of expertise in order to help them integrate the corridors in their Urban Local Plans Les communes libres dans le choix du zonage permettant de décliner ces corridors dans leur PLU. Objectif : pas protéger strictement les zones naturelles identifiées mais d’aller vers un respect et une prise en compte des dynamiques biologiques d’un territoire. Saint-Etienne Métropole mettra à disposition des communes quatre jours d’expertises destinés à faciliter l'intégration des corridors dans leurs Plans Locaux d'Urbanisme. Le chef de projet « corridors biologiques » organisera une (ou plusieurs) réunion(s) de travail, avec les élus, le bureau d’étude, le CREN, la FRAPNA, EPURES. En amont de la révision du PLU, une expertise naturaliste pourra être réalisée par la FRAPNA.

Action examples Integration in urban planning documents Complementary studies

Objective: make sure that the passage point of fauna in 4 identified corridors between massifs are functional Follow-up of conflict points Functionality of identified passage points Redaction and hierarchization of action proposals Support to project design, implementation and realization - Suivi des points de conflits : travail sur les points de passage des quatre corridors et recensés par une étude précédente (ASCONIT) . Les cadavres issus de collision seront récoltés par les gestionnaires d'infrastructures, principalement la DIR, avec géoréférencement. De plus, le linéaire des quatre corridors sera prospecté afin d' identifier de nouveaux points de passages, - Fonctionnalité des points de passages identifiés : Nous réaliserons l'installation de pièges photographiques (35 à 40 pièges photographiques). - Rédaction d'une synthèse avec analyse de la fonctionnalité et des enjeux - Rédaction de propositions d'actions avec hiérarchisation : - Assistance à la conception, à la mise en place et à la réalisation : Cette mission comprendra, des rencontres avec les gestionnaires d'infrastructures afin préparer un pré-cahier des charges définissant les travaux, et un accompagnement dans la conception des mesures de franchissabilité puis, dans un deuxième temps de les assister pour la mise en place et la réalisation.

Action examples Integration in urban planning documents Complementary studies Infrastructure works

Natural restoration of watercourses MAET Wildflowers meadows Restoration of wetlands

Action examples Integration in urban planning documents Complementary studies Infrastructure works Engineering, communication, pedagogy

Operational phase: vigilance points Role of the head structure/support of implementing bodies ERDF financing Land planning Communication coordination

Conclusion « City Map » Thank you for your attention! http://biodiversite.rhonealpes.fr