SNDICE SuperNova Direct Illumination Calibration Experiment.

Slides:



Advertisements
Présentations similaires
Futur Proche au negatif By: Ruth & Louis. When you are not going to do something, then you put ne in front of the verb vais (meaning going) and pas after.
Advertisements

Systems of Equations. A system of equations is a set of equations that have the same variables. A solution for the system is an assignment of variables.
Mission X Superfli Emily Roberts Cette présentation sera écrit en français avec sous-titres anglais violet de couleur. This presentation will be written.
Assessment and the new secondary curriculum S. Barfoot.
Proposition for a new policy for MAPMT Gain Control Sylvie Dagoret-Campagne LAL EUSO-BALLOON 8th Progress meeting1.
Laboratoire de Bioinformatique des Génomes et des Réseaux Université Libre de Bruxelles, Belgique Introduction Statistics.
Title of topic © 2011 wheresjenny.com Each and Every when to use ?
Belgian Breast Meeting Senator F. Roelants du Vivier 13th october.
Information Theory and Radar Waveform Design Mark R. bell September 1993 Sofia FENNI.
La bimodalité des galaxies « Les galaxies dans leur contexte cosmologique » David Elbaz Service d'Astrophysique - CEA Saclay Tel:
SOLAR ORBITER: Extreme Ultraviolet Imager 12 avril 2005 PNST, IAP.
© Copyright Showeet.com S OCIAL M EDIA T HINKING.
Learning Objectives: To be able to say what you and other people are going to do using the NEAR FUTURE tense.
C’est combien ? Les euros
Français II Le projet – Le voyage en France.   You are writing a travel/photo journal in order to keep track of your great trip to the cities of France.
Français III projet cinématique (votre film). les critères Create a 3 minute film with a 1 minute introduction. The introduction must explain briefly.
Modèles et observations Confidence in the validity of a finding is based on the type, amount, quality, and consistency of evidence (e.g., data, mechanistic.
Jet/Met Feb G. Bernardi LPNHE - Paris News and Views - Update de la Run Sel. - Plans pour l’analyse - Status du budget - AOB (conf., ecoles etc..)
M.Lintz, Laser ranging OHP Colloq.23-27/09/ work on absolute laser ranging of long distances at laboratoire ARTEMIS two posters: µm scale accuracy,
Formation de la précipitation
ANR RADIA (ex-RADEC) Desintegrations radiative des particules belles.
This was painted by one of our excellent art students.
French II Chapter 5 Review. Relative Pronouns: qui means “who” for people means “which” “that” for places and things replaces a noun or phrase which is.
FREE HEALTH CARE AND RISK OF MORTALITY ON UNDER 5 YEARS OLD CHILDREEN IN BURKINA FASO : EVIDENCE FROM SAPONE HDSS By Malik LANKOANDE Msc Demography Projet.
Pile-Face 1. Parlez en français! (Full sentences) 2. One person should not dominate the conversation 3. Speak the entire time The goal: Practice! Get better.
Development of a framework supporting collaborative global design based on a study into differing professional cultures Author: Steven GowersHost Supervisor:
1 Ce document est la propriété d ’EADS CCR ; il ne peut être communiqué à des tiers et/ou reproduit sans l’autorisation préalable écrite d ’EADS CCR et.
Lucia - LAPP Phi* meeting - 3 novembre Correcting back to the electrons after FSR So far C Z defined w.r.t. electrons before FSR Z status = 3 and.
Techniques de l’eau et calcul des réseaux le calcul hydrologique proprement dit Michel Verbanck 2012.
Carte test et prototype SAM. Prototype SAM Echantillonnage Principe de l'échantillonneur – bloqueur (Sample & Hold)
La mémoire(1): Comment bien travailler
Your team’s name. Préselection file You have just downloaded the preselection file: it’s the first step for you to win the challenge! In this file, you.
Modèles d’interaction et scénarios
Welcome everyone.
Slide 1 of Slide 2 of 35.
Répétez! Bonjour!. Je m’appelle ________. Et toi ? Tu t’appelles comment? Répétez!
VOICI UNE LISTE DE MOTS FLASH! LIS LES AUSSI VITE QUE TU LIS TON NOM Mots de haute fréquence pour la Deuxième année – un Power Point pour pratiquer et.
On conjugue! [Avoir et Etre] It is very important to learn and practise using the conjugations of verbs in French.
1. Check how B would address A. If A says “I am thirsty”, what would B say in repeating the problem? B would change the subject pronoun to
General description General description of the tasks to be accomplished Each Muon Station is composed of two parts: one on the Cryo side (US), the other.
NAME: Abdul Saleem Mir Enrollment Number: 49/2010 7th ELECTRICAL
ASPIC Front-end CCD Readout Circuit For LSST camera
Write your answer in French
EDHEC OPEN INNOVATION 2016 #OpenInno 2016 [Bus. Case title – Company] Company LOGO.
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
-Transporter specifications sent for comments to Markus and Jean-Louis -We would like to have a mecanum transporter -Feedback from SEAQX: -For the same.
FINANCING Presented by Nathalie Le Denmat, Executive Secretary of the Committee on Local Finance Development – UCLG.
Fabien Plassard December 4 th European Organization for Nuclear Research ILC BDS MEETING 04/12/2014 ILC BDS MEETING Optics Design and Beam Dynamics Modeling.
OBJECT PRONOUNS WITH THE PASSÉ COMPOSÉ Page 122. Placement  With all object pronouns, placement is the same. DirectIndirectPlaces De+ nouns or ideas.
Negative sentences Questions
1 Comité de Direction12 octobre 2007 Liquor BARRY CALLEBAUT CANADA ST-HYACINTHE January 2011.
Ocean currents:.
09/09/2008Projet PMM2-N.Dumont Dayot1 Motivations Finalité du démonstrateur Partenaires Electronique frontale Travail au LAPP Conclusion Projet PMM² Photomultiplicateurs.
Echauffement: mardi, le vingt-quatre janvier, deux mille douze Translate the following sentences into French: 1. We go to the store.  Nous allons au magasin.
Integral Field Spectrograph Opto-mechanical design of the demonstrator PIERRE KARST, JEAN-LUC GIMENEZ, DANIEL LABAT, FRANCOISE RIVIERE CPPM(CNRS),FRANCE.
QA-QC Meeting Cosmic Bench 11 January Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead.
UNITÉ II: LEÇON 6 PARTIE B: LES MOIS ET LA DATE. LES MOIS DE L’ANNÉE janvier January.
Resource allocation: what can we learn from HPC? 20 janvier 2011 Vincent Breton Crédit: Catherine Le Louarn.
SNDICE SuperNova Direct Illumination Calibration Experiment.
1 Activité faisceau longue distance: développement prototype de détecteur 5 juillet 2013 programme de R&D sur la technologie LAr pour détecteur lointain.
Jean-Charles VANEL 05/04/2007 Introduction –Un point rapide sur le prototype physique Approvisionnement en wafer Montage à DESY Beam test au CERN –Eudet.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
Electronic Instrumentation Lecturer Touseef Yaqoob1 Sensors and Instrumentation Sensors and Instrumentation.
 Components have ratings  Ratings can be Voltage, Current or Power (Volts, Amps or Watts  If a Current of Power rating is exceeded the component overheats.
IP Multicast Text available on
Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics Statistics & Econometrics.
Résumé CB WLCG du 3 février 2005
Quiz What are the different Copper cable types ? How is STP better than UTP ? What type of cable should we use between : Router-Switch, PC-Router, Hub-Switch.
Quelle est la date aujourd’hui?
Manometer lower pressure higher pressure P1P1 PaPa height 750 mm Hg 130 mm higher pressure 880 mm Hg P a = h = +- lower pressure 620 mm Hg.
Transcription de la présentation:

SNDICE SuperNova Direct Illumination Calibration Experiment

SNDICE Calibration Instrumentale de Megacam Installation au CFHT fin 2007 (durée > 1 an) Collaborateurs : –P. Bailly, E. Barrelet, W. Bertoli, C. Evrard, J-F Huppert, C. Juramy (  2006), H. Lebolo, K. Schahmaneche, R. Sefri, A. Vallereau, D. Vincent, Coût total  125 k€

Revue SNDICE 13 Novembre 2006 Conseil scientifique 24 Novembre 2006CSP 12 Décembre 2006

Illumination Directe source de LEDs calibrée (LPNHE ) Monitoring du telescope Echantillonage de R( ) Design simple

Banc de test actuel

Mesures prévues sur le banc de test LEDs : –Obtenir une lumière stable avec contrôle du courant et du photocourant dans photodiodes de contrôle –Relations entre tension, courant, température, et puissance lumineuse émise –Distribution spectrale –Distribution spatiale : Integral Radiometric Calibration CLAP : –Mesure et amplification de signaux qq fA/cm 2 –cross-calibration avec photodiode calibrée NIST, via la calibration des LEDs  Prototype d’une carte avec 8 voies (Janvier 2007)

Workpackages  Électronique de contrôle et acquisition  Asic  Tête de LEDs  Banc de calibration

Schéma du dispositif (Cooled Large Area Photodiode) (LEDs source)

Carte électronique principale Précision visée : < 1 ‰ Sources de courant des LEDs : 20 DACs 12-bit, 20 switches, un temps de pose commun Lecture du courant des photodiodes : LCA, multiplexeur, ADC 16-bit Alimentations pour : DACs, ADCs, LCAs, polarisation des photodiodes FPGA Ethernet : XiLinks Virtex 4 pour la programmation du FPGA to LED source DACs to computer LCAs MuxADC FPGA

Photodiode refroidie (CLAP : Cooled Large Area Photodiode)  Mesure redondante  qq fA/cm 2  refroidissement (Peltier)  “grande” surface  besoin d’un LCA (Low Current Amplifier) SNDICE – LCA

LCA : schéma SNDICE – LCA

ASIC (R&D SNAP)  préampli de courant  ampli de tension double gain SNDICE – LCA

SNDICE – Tête de LEDs Specifications 1. LEDs module  Design of the LEDs module as much for the test bench as for the installation on the telescope Requirements (although specifications are not precisely defined yet) : Number of LED : between 20 and 24 (to cover spectral bandwidth from UV to NIR)  surface mount form factor LED with flat top 1 control photodiode associated with every LED  could be edge-illuminated photodiode ? Baffling against stray light  1st mask to get rid of rim reflection so that we have an almost point-like light source  2 nd mask acting as a diaphragm to get a cone shape light with an angle of 3° Constraints from climate and weather environnement at CFHT Space requirements to stay outside telescope and camera field of view Interface with telescope structure for fastening Equipped with a sight system and tilt-and-swivel mechanism to adjust the optical axis toward the camera

SNDICE – Tête de LEDs Fixation and positionning of the LEDs  our previous experience : home-made mechanical positionning, LED glued Requirements  better to use industrial electronic means and solder LED directly on an PCB ?

SNDICE – Banc de calibration  2nd step : calibrate the LEDs by using the NIST calibrated photodiode The aim is to define a 3D map of the light field and measure light homogeneity for each LED within an useful area  we need to move either the light source or the light receiver relatively to each other with 3 degrees of freedom  The distance between source and receiver would range from 1m to 2.5m to get adequate illumination  3rd step : calibrate the Hamamatsu photodiode with the then calibrated LEDs We need to increase the distance between source and receiver to lower illumination In order to come close to working conditions on the telescope, this distance should be around the focal plane distance of Megaprime (~13.5 m)  extension of the optical bench  4th step : design for the lay out of the calibrating system on the Megaprime instrument  1st step : test of LEDs and photodiodes to choose the right ones  prototypes of LEDs module

SNDICE – Banc de calibration LEDs module Photodiodes 1 NIST calibrated photodiode (high illumination sensitivity) 1 Hamamatsu cooled photodiode (low illumination sensitivity) Optical bench Black box (not drawn)

SNDICE – Banc de calibration Specifications 2. Optical bench Motorized translation along the optical axis (Z) scanning 1m to 2.5m from the LEDs module precision : 0.5 mm (enough to be precise better than 0.1% related to the distance) XY motorized translation system scanning an area around 20x20 cm² precision : 0.5 mm Tilt-and-swivel system to align LEDs and photodiodes precision : fraction of milli radian existing granit rail existing XY translation system ? Carriage guided by 4 rollers along aluminium profil motor driven by synchronous belt repeatability +/- 0.1 mm Black box - Feedthrough for power and signal cables - Opening on one side to « extend » the bench up to 14m

Schedule (1)

Schedule (2)

Schedule (3)

Manpower 3.4 h*ans 2.4 h*ans 0.2 h*ans Total = 8.9 h*ans 2.9 h*ans

Cost

DICE Group Review Findings (Paris Nov 13, K. Gilmore invited) Photometric calibration is indeed a key issue of current and future wide field surveys Quantify the scientific gain Direct illumination with LEDs is a very appealing concept Key features (stability and control, LED light emission properties, …) to be validated on test/calibration bench Get results from «Dome illumination with a tunable laser » experiment at CTIO (C. Stubbs) Cost estimate found ok - Technical team found strong Problem with the leaving of C. Juramy in Jan 07 Go forward: immediately - do test/calibration bench validation measurements - start discussing implementation with CFHT

Risques (1) Accord du CFHT ? –Courrier au CFHT cet été –Une visioconférence fin Novembre –23-11: CFHT prêt à collaborer à cette étude –Envoi d’un proposal au CFHT le –Une visioconférence avant la fin de l’année –…

Risques (2) Choix des leds –Mesures sur le banc test en cours –…

Risques (3) Ressources –Budget réaliste –Manpower ITA, pas de problème –Départ de Claire Juramy fin Décembre Mesure sur banc test Analyse

Conclusions  Peu de problème, mais:  Encore beaucoup de mesures, de tests et de simulation à faire : MANPOWER côté physiciens  Si validé : calibration pour des expériences ultérieures (LSST, satellites,…)