YETS 2016-2016 preparation S. Girod, EN-MEF EATM 01.07.2015.

Slides:



Advertisements
Présentations similaires
What is the time Mr. Wolf? LObjectif At the end of the lesson, you will be able to: 1.Say quarter past and quarter to the hour.
Advertisements

Fun French Language Club
What is the time Mr. Wolf?.
What is the time Mr. Wolf? LObjectif At the end of the lesson, you will be able to: 1. Ask someone the time in French. 2.Say the time in French: the.
LES VERBES POUVOIR ET VOULOIR Français I, Ch. 6. POUVOIR: TO BE ABLE TO Pouvoir Je peux I am able to, I can Tu peux You are able to, You can Il/Elle/On.
Le comparatif des adjectifs Comparing people and things.
The Botanical Longwood Gardens Le jardin botanique de Philadelphia
Le conditionnel. -ais-ions -ais-iez -ait-aient Les fins.
10/12/2004 SC-RP-SL EDMS nº Radiation Survey of SPS N. Conan, I. Brunner D. Forkel-Wirth (TIS-RP-SL) 10 December 2004.
STTC Accélérateurs AB ABIC (AB Installation Committee) : Merci aux chefs de groupe ST et à leurs représentants pour la qualité des présentations effectuées.
TDC2/TCC2 Réunion de chantier
TDC2/TCC2 Réunion de chantier
Removal procedure: work dose planning optimization TAN study group : Meeting #5 16/11/2012.
Quelle heure est-il? Objectives: telling the time Using the pronouns ils and elles.
The value chain and added-value networks
Are you Muslim, and under 40?
John Constable Né le11 juin 1776 à East Bergholt, Suffolk –mort le 31 mars 1837 à Londres, peintre paysagiste britannique du XIXe siècle. Ses ciels.
S. EVRARD, EN-MEF TDC2-TCC2 consolidation status report to EATM In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
EA section, 10 Juin 2005A.Fabich1 Expérience nToF11: La cible « jet de mercure » A.Fabich CERN AB-ATB Juin 2005.
Les normes: Communications 1.2: Understanding the written and spoken language Comparisons 4.1: Understanding language through comparisons.
XTAX repair Réunions de chantier. Activités S11 Montage bunker (Transport) Déconnexions hydrauliques Déconnexions électriques Equipment bunker (Abou)
I Activité de R&D: vers une cavité RF équipée 'made in France' Construire une cavité ILC Eacc = 40 MV/m Q0 = 2e10 équipée et testée en cryostat vertical.
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014.
J-B. Lallement, B. Mikulec
Ch. VUITTON BE-BI mai Les moniteurs dans le SPS Instruments BI. Ex : -Ligne TDC2/TCC2 - Zone d’extraction (LSS2) Nos interventions. Documentation.
TBM implantation in CLEX 1 TaskDurationDate 1Remove the safety barriers0.5 days1.06 2Preparation of the storage tables inside CLEX0.5 days1.06 3Radioprotection.
SPS LS1 Planning meeting (No.24) 13/11/13 David Mcfarlane
Le bilan d’une banque en 2008 The balance sheet of a bank in 2008.
L’Heure To ask what time it is in French, say: – Quelle heure est-il? To respond, say: – Il est... heure(s). – Ex: 02h00 Il est deux heures. 04h00 Il est.
Hydraulic Engineering. Water Hammer Phenomenon in pipelines.
Les cibles de la Zone Nord TCC2: T2-T4-T6 -Etat moyen (pannes rares) -Zone tres radioactive TCC8: T8-T10 -Etat assez bon (pannes rares) -Zone faiblement.
EN LS1 CV/ACCESS/Cabling Work co-activities February 5th, 2013 R. Brown/S. Mataguez EN/MEJ/INJ LS1 CV/ACCESS/Cabling Work co-activities EDMS
Meeting 2015#13 Linac4 Coordination of Installation Schedule follow-up EDMS J. Coupard EN-MEF1 week 28.
East Area Upgrade LS2 Meeting #2 07/05/2015. Upgrade des équipements faisceau EquipementResponsableObjectif LS2/commentaires CollimateurAbou Ebn RahmounRemplacement.
Remaining LHCb related tasks during LS1 with DT involvement LHCb/DT meeting, May 19, 2014.
Formation RSSO : Mise en oeuvre du principe ALARA
Atlas Pixel Services Quarter Panel Reproduction Erik Richards November 11th 2010.
EN-CV Progress EHN1 Extension Project
S. EVRARD, Latest news from TCC2/TDC2. Outline 2 - Sébastien EVRARD  2013 schedule  New vacuum leak under investigation  Cable and cable tray re-routing.
S. Grau & AS Team 9/15/2015 EDMS XETS coordination meeting 2.
LINAC3 INSTRUMENTATION STATUS S. Sadovich – 29 Apr 2015 S.Sadovich on behalf of F.Roncarolo 29 Apr
Activités CV Consolidation NA pour YETS2015, EYETS2016 et YETS2017 Jani Lehtinen – 24/09/ Activités CV - Consolidation NA pour YETS2015, EYETS2016.
Journees de prospective LAL/ Seillac 2012
CTF3 recovery from fire 1 CTF3 Committee G.Geschonke.
1 1. Linac4 – 2012 Progress New 2.8MW klystron H- source DTL CCDTL RFQ.
26 November 2007D.LACARRERE1 UX85 B – COOLING PIPES (Mixed & Chilled Water) Radiography (Se75) - Localization 29 welds to be inspected.
TT2 Infrastructure upgrade 22 sptembre2015 Christophe Mutin.
LIU – D UMP EN LSS5 (M ODIFICATIONS EN LSS5 ET LSS1). ICL M EETING 4 NOVEMBRE 2015 Frédéric Galleazzi EN/MEF/INT EDMS :
TT2 consolidation Partie câblage DC P. Lelong / EN-EL-FC.
Proton beams status EAST_Irrad: OK (Operation arrêtée le 15 novembre) EAST_North: OK (Operation arrêtée le 15 novembre) TOF: OK (Operation arrêtée le 15.
Nouvelles d’ATF2 au Japon Suite à une réunion ATF2 qui s’est tenue la semaine dernière au Japon (8 heures de décalage horaire!) A.Jeremie-17/01/12- service.
NA YETS: schedule week by week S. Evrard.
DISMANTLING OF WATER COOLED CABLES IN BA5 OF SPS Georgi Minchev Georgiev EN-EL-CF 08/10/2015.
TITLE Business PowerPoint Templates PowerPoint note pad template.
LIU and EL activities De-cabling strategy from EYETS to LS2 in PSB, SPS and PS Meeting 18 May 2016 Injector De-cabling Project G. CUMER, EN-ACE-OSS.
Decabling Project Overview Mandate, organisation, general planning, coordination, safety LS2 COMMITTEE – 3 rd meeting, 27 May 2016 G. Cumer, EN/ACE/OSS.
Programme LAViSta côté LAPP A.Jeremie 12 décembre 2007 J.P.Baud, B.Bolzon, L.Brunetti, G.Gaillard, N.Geffroy, J.Tassan.
Pronouncing the sounds / ɛ / and /e/ in French Bon départ, French beginners Unit 4.4.
SPS préparation travaux LS2
Frédéric Galleazzi EN/ACE/INT
Interventions BE-BI LS2
Injectors de-cabling Project EYETS 2017_ Consignations SPS pour le projet de-câblage 23 novembre 2016 G. Cumer, EN/ACE/OSS.
Preparation of the EIROFORUM presentation Lisbon
Interventions BE-BI EYETS 2016/17
North area S. Girod, EATM,
The consequences of the.
nTOF air and concrete activation
Safety Talk EN DSO & EROS
Ouvrir, Offrir, Couvrir, Souffrir, Découvrir
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 26/06/2019.
Transcription de la présentation:

YETS preparation S. Girod, EN-MEF EATM

North Area H2 & H4 alignment (Survey) H8: démontage blanche VLE, redistribution des quadrupoles PR 534 in EHN1 (EN-HE) TDC2 AHU control upgrade (EN-CV) BA82 chilled water pipes (EN-CV) Collimator consolidation to be continued (EN-MEF): LIGNEELEMENTPOSITIONETATCOMMENTAIRE MAINTENANCE TCC2 H4XCSH Ruban instable sur les guidesPrevoir remplacement shuntdown 2015 TT81 H4 XCSV Ruban abiméMettre capuchon, Prevoir maintenance shutdown 2015 TT82 H6 XCSV Point dur dans la mécaniqueRemise à neuf de la mecanique shuntdown 2015 EHN1 H2 H2 XCSH Ruban abiméPrevoir remplacement ruban shuntdown 2015 EHN1 H8 H8 XCSH Ruban instable sur les guidesPrevoir remplacement guide&ruban shuntdown 2015 TCC8&ECN3 TT84-M2

East Area 5 MTV’s  BTV’s (BE-BI)

AD BHN34 magnet refurbishment Vacuum ion pumps replacement BCCCA maintenance/upgrade ELENA magnet DC cable pulling campaign Installation of the AD extraction line towards ELENA (open shielding in sector 1, line 7000) Pursue ELENA hardware installation G-Bar shielding installation (if funded) and LINAC installation

nTOF Filter box installation in horizontal beam line

HiRadMat Not yet defined

AWAKE