Télécharger la présentation
La présentation est en train de télécharger. S'il vous plaît, attendez
Publié parAlain Robert Modifié depuis plus de 9 années
1
FAIR platforms Mats Wilhelmsson Meeting 12 May 2015
2
Design & building strategy Since last year (end 2013), we have a mechanical building contract in place in EN/MEF which supports the Accelerators and the experimental areas with mechanical structures. (existed before in another group) Workshop building 904
3
A cost estimate was produced by M Arnaud, the person in charge of this support activity, based on a preliminary layout:
4
Structures fixes TypeNombreDimensionsHauteurSurfaceNotes 116300x10008007.4 m2 212950x463080013.6m2 312450x463580011.3m2 417000x105080011.3m2 532350x200023004.7m2Certaines parties sont amovibles / Trappe Valvebox 643650x200031007.3m2Certaines parties sont amovibles 7115000x90050013.5m2Chassis racks 834200x9005003.8m2Chassis racks 928000x8009006.4m2Support cannes de mesures au sol ou sur passerelle H=800mm Structures mobiles TypeNombreDimensionsHauteurSurfaceNotes 10310000x260080026m2Bouge de 4m / Trouver un système pour passer sur tuyaux cryo. 1133000x29508005.8m2Bouge de 4m / Trouver un système pour passer sur tuyaux cryo. Escaliers TypeNombreHauteurNotes 1243100 1362300Angles differents 1431500Angles differents 1519800 FAIR / Types de structures
5
Development of the design
7
Next stages When the integration models are freezed (when ?) the models will be transformed into construction drawings Approval of the construction file Procurement of material Pre-fabrication in our workshop (building 904) Assembly in building 180. Commissioning and adjustements
8
EVM
Présentations similaires
© 2024 SlidePlayer.fr Inc.
All rights reserved.