La présentation est en train de télécharger. S'il vous plaît, attendez

La présentation est en train de télécharger. S'il vous plaît, attendez

FAIR platforms Mats Wilhelmsson Meeting 12 May 2015.

Présentations similaires


Présentation au sujet: "FAIR platforms Mats Wilhelmsson Meeting 12 May 2015."— Transcription de la présentation:

1 FAIR platforms Mats Wilhelmsson Meeting 12 May 2015

2 Design & building strategy Since last year (end 2013), we have a mechanical building contract in place in EN/MEF which supports the Accelerators and the experimental areas with mechanical structures. (existed before in another group) Workshop building 904

3 A cost estimate was produced by M Arnaud, the person in charge of this support activity, based on a preliminary layout:

4 Structures fixes TypeNombreDimensionsHauteurSurfaceNotes 116300x10008007.4 m2 212950x463080013.6m2 312450x463580011.3m2 417000x105080011.3m2 532350x200023004.7m2Certaines parties sont amovibles / Trappe Valvebox 643650x200031007.3m2Certaines parties sont amovibles 7115000x90050013.5m2Chassis racks 834200x9005003.8m2Chassis racks 928000x8009006.4m2Support cannes de mesures au sol ou sur passerelle H=800mm Structures mobiles TypeNombreDimensionsHauteurSurfaceNotes 10310000x260080026m2Bouge de 4m / Trouver un système pour passer sur tuyaux cryo. 1133000x29508005.8m2Bouge de 4m / Trouver un système pour passer sur tuyaux cryo. Escaliers TypeNombreHauteurNotes 1243100 1362300Angles differents 1431500Angles differents 1519800 FAIR / Types de structures

5 Development of the design

6

7 Next stages When the integration models are freezed (when ?) the models will be transformed into construction drawings Approval of the construction file Procurement of material Pre-fabrication in our workshop (building 904) Assembly in building 180. Commissioning and adjustements

8 EVM


Télécharger ppt "FAIR platforms Mats Wilhelmsson Meeting 12 May 2015."

Présentations similaires


Annonces Google