DØ-IN2P3 Activités/Demandes année 2000

Slides:



Advertisements
Présentations similaires
1. Introduction: 2. Detecteurs a pied de gerbe (preshower) 3. Le systeme de declenchement EM 4. Application au Run II 1. Introduction: Motivations & upgrade.
Advertisements

Z SILICON DRIFT DETECTOR IN ALICE When a particle crosses the thickness of SDD electrons are released. They drift under the effect of an applied electric.
Expérience D0 au LPNHE Le groupe du LPNHE a rejoint l’expérience D0 le 1/1/98, avec le LAL et le CPPM (rejoints plus tard par L’ISN Grenoble et par l’IPN.
CMS ATLAS LHCb CERN Tier 0 Centre at CERN National Centres Lab a Russia Lab c Uni n Lab b Manno Canada Uni y Uni x Tier3 physics department  Ge  Germany.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
Implication LPNHE-ATLAS dans la R&D SLHC CS LPNHE 2 Octobre 2007.
Jan 2012 Total : 148 personnes + 28 stagiaires LPNHE 1 Laboratoire de Physique Nucléaire et de Hautes Energies CNRS/IN2P3, Univ Pierre et Maric Curie and.
Réunion OPERA 06/04/2010 Florian Brunet. Rappel : Electron WG meeting du 30/03/2010 ◦ Complément sur OpEmuIO Etudes de digits du MC à grands angles A.
The relationship between the different FEB projects The first MainBoard and its Processing DaughterBoard will be developed for 3-in-1, but keeping the.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
Etude du quark top au LHC dans l’expérience ATLAS Bernardo Resende sous la direction d’Emmanuel Monnier 18 avril 2005 Le LHC et ATLAS Physique du quark.
Retour sur l’uniformité du calorimetre “Paradigme” “Par construction” uniformité ee  uniformité.
PERFORMANCE One important issue in networking is the performance of the network—how good is it? We discuss quality of service, an overall measurement.
Activités de l’IPNL en préparation pour le prototype Un d é tecteur de 1 m2 é xsite d é j à IHEP produira les 40 GRPC n é cessaires Mais : 1- Il faut les.
SKIROC status LAL – EUDET France – 05/04/2007. Common DAQ Slice FE FPGA PHY VFE ASIC Dat a Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC Conf/ Clock.
M. Aharrouche page 1 PAF 2007 Mesure de l’asymétrie avant-arrière dans les événements Z  e+e- Mohamed Aharrouche* (LAPP-Annecy ) Introduction Mesure de.
L’Electronique Back-End du Détecteur SciFi
Etat, perspectives et proposition de continuation de D0-France
Etat d’Avancement DØ-IN2P3 Demandes 2001
Etude du signal de la calibration de l'électronique
Statut du détecteur et des projets PP LAL Orsay DØ France 8-9/11/04
Photons Episode 3.
Physical principle Ultrapurification Single pixel detector Electronics
LAL Victor Renaudin & Yasmine Amhis
Acquisition des données
Le point sur notre participation à l’ETD (Electronique, Trigger, DAQ)
IGTMD réunion du 4 Mai 2007 CC IN2P3 Lyon
Etat d’Avancement DØ-IN2P3 Perspectives au Tevatron avant LHC
Proposée par : (hors étudiants):
Proposée par : (hors étudiants):
Utilisation du tracker de CMS au niveau 1 du trigger
Le Démonstrateur version LPC
1 S Transmission Methods in Telecommunication Systems (4 cr) Transmission Channels.
Les nouveautés dans les modèles de Calcul au LHC
Réunion service Instrumentation Activités CMS-Traces
Bienvenue à tous ... Réunion D0-France 2004
D0-France a Grenoble G. Bernardi Merci au LPSC
Strengths and weaknesses of digital filtering Example of ATLAS LAr calorimeter C. de La Taille 11 dec 2009.
Expérience DØ au LPNHE Composition du groupe:
Quantum Computer A New Era of Future Computing Ahmed WAFDI ??????
Recherche et étude de la désintégration du boson de Higgs dans le canal en 4 électrons dans l’expérience ATLAS Fany Dudziak Directeurs de thèse : L. Iconomidou.
Jobs ATLAS sur la grille
Reconstruction of HR1 events taken in test beam
STEREO Objectifs de recherche Equipe Faits marquants
Résumé CB WLCG du 3 février 2005
CRG TM for YETS November 6th 2017.
Scenario d’intégration du pixel alpin
R des 2 jets et HT des evenements
Projets en Physique des Particules en 2010
High-Availability Linux Services And Newtork Administration Bourbita Mahdi 2016.
Présentation pour M. R. Aymar 19 IX 2004
Efficacité des algorithmes
Activités Farès Djama (ATLAS)
General Meeting Pulsed Elements for ThomX
LHC ATLAS CERN Atlas (Air Toroidal Lhc ApparatuS) est une
Heavy flavour Leptonic and SL. Decays
Forum national sur l’IMT de 2004.
Vulnerability Analysis by : Wail Belhouchet Dr Djouad Tarek 1.
Représentant technique Représentant scientifique
Activités du groupe CTF3 au LAPP
<LHCb upgrade: SciFi>
DC04 CMS Objectif Status Planning
beam charge measurements
BRMS Implementation Status Update Template designed by 18-July-2015.
<LHCb upgrade: SciFi>
MESURE DE RESULTATS DES IRR
LCG – France et ALICE Bilan 2006 Planning fevrier 2007
Jour 21 MOT DE PASSE: Déranger - to disturb, bother
IMPROVING PF’s M&E APPROACH AND LEARNING STRATEGY Sylvain N’CHO M&E Manager IPA-Cote d’Ivoire.
M’SILA University Information Communication Sciences and technology
Transcription de la présentation:

DØ-IN2P3 Activités/Demandes année 2000 Situation générale Collisionneur Détecteur Activités DØ IN2P3 Histoire Les groupes Calibration du calorimètre Préparation à l’analyse Participation au démarrage Calcul au CCIN2P3 Demandes Conclusion

Run II “Un Run II Long ” 2 fb-1 fin 2002 9 mois d’arrêt installation du nouveau silicicium ~ 15 fb-1 (ou plus) vers 2006  Higgs ?? Glissement du planning environ 6 mois démarrage début 2001 CDF DØ MI Tevatron MI 1/06/99 succès ! 120 Gev 3x10**13 p 2.9 s cycle time Recycler 8Gev aimants permanents Lumi x 2

Luminosité Avec 2 fb-1 fin 2002 qq milliers ttbar qq centaines t Mesures précises EW masse du top  4 Gev mass W  40 Mev Higgs/Higgs  40% QCD SUSY Exotiques ..ETC ..

Overlapping Interactions Detector upgrades are driven by increased luminosity and decreased crossing times

Combined reach 30% improvement in bb mass resolution over Run I 30 fb-1 15 fb-1 2 fb-1 30% improvement in bb mass resolution over Run I Run II acceptance  1.3 NN improvement 10% sys. error on background would increase L needed by 20-25%

DÆ Upgrade Forward Scintillator + New Electronics, Trig, DAQ New Solenoid, Tracking System SMT, SciFi,Preshowers Shielding Forward Mini-drift chambers Forward Scintillator Central Scintillator + New Electronics, Trig, DAQ

Détecteur de Traces Fiber Tracker Silicon Microstrip Tracker Forward Preshower Silicon Microstrip Tracker Fiber Tracker Solenoid Central Preshower ~0.5 m ~1.3 m All detectors in this volume use SVX II readout

Microvertex Major SMT Subsystems Single Sided Ladder (3 chip) Double Sided 2o Ladder (9 chip) Double Sided 90o Ladder (6 chip) H Disk (SS back-to-back) F Disk (DS) Length of the central region » 100 cm AC coupled double/single sided detectors SVX2e readout 800,000 channels hit resolution : 10 m radiation hard to 1 Mrad

Barrel/Disk Module 6 Barrels (12cm) with 4 layers each 12 F-Disks Layers 1 and 3 à (rf,90o) 50 & 153.5 mm pitch, 2.1cm wide Layers 2 and 4 à (rf,2o) 50 & 62.5 mm pitch, 3.4cm wide 12 F-Disks small diameter (2.5 < r < 10 cm) 12 wedges per disk 50 & 62.5 mm pitch ±150 stereo

Silicon Microstrip Tracker H Disks F Disks 4 H-disks (large diameter : 9.5 <r< 20 cm) 40 mm strip pitch, ± 7.5° stereo Track reconstruction to h = 3.5 Hit Distribution in SMT (no H disk included) Barrel+Fdisk Barrel

Fiber Tracker Fiber Cylinders (8 layers) 20<r<50cm full coverage to h =1.7 All layers have axial doublets Alternate u or v stereo doublet layers provide tracking with fast response, and good resolution low mass (».06X0 ) to minimize multiple scattering 50 mm precision for fiber location radiation hard

Fiber Layout Scint Fibers Fiber Ribbons Readout stereo axial stereo 830mm Æ, multiclad 1.6-2.5m active length 10m clear waveguide to photodetector rad hard (100 krad) (10yr @ 20cm @1032) Fiber Ribbons 8 axial doublets 8 stereo doublets (2o pitch) Readout 77,000 channels VLPC readout run at low temp (9 oK) fast pickoff for trigger SVXII readout side view axial stereo end view axial stereo

Performance Momentum resolution determine sign of charge dPT/PT2 = 0.002 (Silicon+Fiber tracker) determine sign of charge expected tracking efficiency ³95% measure x,y primary interaction vertex with a resolution of 15 mm measure z of interaction of vertex with a precision of 50 mm resolve multiple interaction vertices

Performances Mesure le parmètre d’impact des traces r-f resolution »15mm z resolution » 50 m Association des traces avec un grand paramètre d’impact aux jets de b Reconstruction des vertex secondaires resolution : 40 m (x,y); 150 m (z) efficacité tagging b-quarks » 50% Tagging semileptonique des jets de b efficacité de tagging des muons de bas Pt » 50% efficacité de tagging des électrons de bas Pt ..à déterminer (ISN-LAL)

Muon System Bottom B/C Scint A-f Scint PDTs Forward Trigger Scint Completely new forward muon system for Run II Bottom B/C Scint A-f Scint PDTs Forward Trigger Scint Tracker (MDTs) Shielding

Muon Trigger Detectors Central Trigger Counters Bottom scintillator counters “Cosmic Cap” f coverage ® 85% A-f counters (Dh ´ Df = 0.2 ´ 4.5o) Between calorimeter & A-layer PDTs Identify and trigger on low pT muons Forward Triggering (1 < |h| < 2) 3 layers to reduce combinatorics 1 < |h| < 2 A,B,C-layers Segmentation: Dh´Df = 0.1´ 4.5o 4608 counters

Trigger Capabilities What Kinds of Objects Will Be Available for Run II Triggering? L1: towers,tracks,Et,some correlations L2&L3: e,m,j,t,Et,correlations For L=2x1032cm-2 s-1 ( Bunch Crossings at 132 ns; Deadtime: < 5% ) : 7 MHz input rate Data Framework Data Log L1 4.2 ms L2 100ms L3 48+ ms 7 kHz 1000 Hz 50 Hz 128 terms 128 terms 48 nodes

Detector/L1/L2 Components L1 Trigger L2 Trigger 7 MHz 5-10 kHz 1000 Hz L1CAL CAL L2Cal FPS CPS L2PS L1 CTT Global L2 CFT L2CFT SMT L2STT L1 Muon L2 Muon Muon L2FW:Combined objects (e, m, j) FPD L1FPD L1FW: towers, tracks, correlations

Silicon Track Trigger Device Functionality Physics benefits correlates hits in silicon detector at the the L2 trigger to the CFT trigger tracks Fast track fit (SMT+CFT) improve momentum resolution impact parameter determination Correlate high impact parameter tracks to b-jet tracks Physics benefits High PT physics top physics Associated Higgs production Z® bb (calibration) New particle searches (e.g. pT® bb) B-physics

D0 solenoid installed

New Tools: charged particle tracking

Fiber Tracker Status Ribbon Mounting-3B COMPLETE !

FPS picture Not just a working detector…... but also beautiful to look at…...

Forward Muon Trigger Pixel octant from A Layer Lab F production facility Picture of first complete & cabled Need to build 48 octants; total 4608 counters

Planning installation Courtesy of kotcher Dernières contraintes Si et ECS (bouchon SUD calo) Blindage Démarrage 3 semaines après installation du détecteur dans le faisceau

Planning FNAL

D0 Schedule Summary Critical path – reviewing to see how we can help

D0 Installation & Commissioning

D0 Schedule Summary Trigger not on critical path for roll-in, available for commissioning in collision hall L2 commissioned 9/20/00

Schedule Meetings Joint meetings between BD/CDF/D0 to provide input to Lab management on schedule Beams Division (8/31/99) Mostly single beam engineering run 4/15/00-8/15/00 Could (?) start collider running 10/1/00 D0 (9/14/99) No commissioning run Rolled in & hooked up 2/2/01 CDF (9/21/99) Strongly push commissioning run (w/o Si) – 7/21/00-9/25/00 Rolled-in & hooked up: aggressive 11/10/00; “realistic” 1/31/01 Lab (1/1/99) – Draft till 10/15/99 BD engineering run 5/1/00-7/31/00 Commissioning Run 8/15/00-10/31/00 Roll in 11/1/00-2/28/01 Run II 3/1/01 -> …

Commissioning Run Present proposal is to commission with cosmic rays and not roll-in for 8/15/00 commissioning run With present schedule (Si installed 9/19/00) => ~6 wk delay in final start Only a partial detector available on 8/15 No silicon, ½ fibers instrumented, no ECS, no end iron Commission the hardware with cosmic rays Serious effort - shifts Have full access during commissioning phase Commission as systems come on-line Go in with partial detector? Do not need/want to make final decision now (next year?) Wait => schedule will be better understood Costs vs benefits of engineering run need to be better understood There is nothing we would do differently now in either case

Reviews Late Dec/ early Jan Director’s review – 1 day Focus on installation/ commissioning and Online & DAQ They haven’t heard much about this, want to understand this is under control Spring 00 – Operations review Operations plan Manpower/resources MOU’s w/ universities & Fermilab

Histoire Perspectives physique de tout premier plan DØ-IN2P3 lettre du 27/10/97 Perspectives physique de tout premier plan Préparation au LHC (cf physiciens américains CDF ou DØ sur ATLAS ou CMS) Thèses Physicien(ne)s venant de groupes différents Participation concentrée =impact=(accès aux données)

Groupes DØ-IN2P3 CPPM Marseille  ISN Grenoble  Arnaud Duperrin Eric Kajfasz (Fermilab) Elemér Nagy Sylvain Négroni (thèse) Mossadek Talby ISN Grenoble  Yannick Arnoud Auguste Besson (thèse) Sabine Crépé Pavel Demine (thèse) Nirmalya Parua (visiteur étranger) Gérard Sajot Assistance Technique Jean-Claude Durand (informatique)

Groupes DØ-IN2P3 LAL Orsay  (départ de P. Bambade) Abdel Abdesselam (thèse) Laurent Duflot Jean-Francois Grivaz Michel Jaffré Pierre Pétroff Melissa Ridel (thèse) Assistance technique Guy Le Meur informatique Francois Touze “ “ Yves Jacquier électronique Gisèle Martin “ “ Pierre Imbert “ “ Patrick Cornebise “ “

Groupes DØ-IN2P3 LPNHE Paris  Ursula Bassler Frédéric Machefert (ATER) Bob Olivier (thèse) Grégorio Bernardi (disponibilité 1 an) Frédéric Fleuret (post doc LBL 1-2 ans) Didier Lacour (10%) Assistance technique Jean-Francois Huppert informatique Evelyne Lebreton “ “ Philippe Bailly électronique Hervé Lebollo “ “ Alain Vallereau “ “

DØ France Responsabilités partagées au niveau français entre IN2P3 et Saclay soft et physique Réunions communes DØ France (2 par an) Préparation à l’analyse (4 par an) nombreuses réunions informelles

France (Saclay - IN2P3) Physics (top ,SUSY) In2P3 Saclay Calorimeter Tracker Muons detector calib e-id Jets/Et miss B field param. Reconstruction Full MC PMCS Physics (top ,SUSY)

Calorimeter Electronics New bunch structure = new electronics Shorter shaping time required to reduce pile-up Replace shaping circuits (BLS=baseline subtractor) with one matched to 400ns Analog delay required to pipeline signal until trigger is formed Use 48 element deep switched capacitor array (SCA) SCA analog del >2usec, alternate new low noise preamp & driver Trig. sum Bank 0 Calib SCA (48 deep) SCA (48 deep) Filter/ Shaper x1 Preamp/ Driver Output Buffer BLS SCA Detc. x8 SCA (48 deep) SCA (48 deep) Bank 1 Additional buffering for L2 & L3 Replace cables for impedence match Shorter shaping 400ns

Calibration Run II LAL/LPNHE

Calibration  Calibration online (Ursula Bassler/Hervé Lebollo) LAL Conception et réalisation des pulsers “à la ATLAS” + fanouts actifs LPNHE Conception et réalisation de la carte de contrôle Réalisation et programmation carte VME/pulseur Soft online (avec Stony Brook) soft de contrôle des pulsers/database .. Status et Planning Cables courant installés et équipés Montage fanouts actifs mi-Novembre Installation du système de contrôle début Décembre Mise en service printemps 2000 A faire : équipement du End Cap Sud calo et de l’ICD courant 2000 ..

Fanout actif Signal calib vers preamp Câble courant Commandes Switch (pulse)

Calibration

Calibration

Calibration  Demande de DØ réalisation mini cellule test pureté Argon Cellule test à l’extérieur du cryostat mini cryostat cellule identique à celle construite pour le module0 de l’accordéon (ISN-Mayence) espace argon liquide entre 2 électrodes avec source d’Américium et électronique de lecture A faire Etat cellule Run I: récupération du mini cryostat ? Consulter ISN (fait) et Mayence merci ATLAS ! ISN Grenoble (Gérard Sajot) prendrait la responsabilité de fournir cette mini cellule

Calibration offline Calibration off-line du calorimètre EM (CPPM Marseille) Z e étude pour ATLAS  DØ Elemér Nagy et Sylvain Négroni (thèse) Calibration avec les traces (LPNHE +...)

Détecteur de vertex Activité d’ Eric Kajfasz (CPPM) Responsable de la production et des tests du microvertex (800000 canaux et qq 2 millions de connexions !) 98/99 missions longues durées IN2P3 y2k et au delà Fermilab Travail très apprécié du management Besoin de physiciens pour les tests (aide au démarrage de l’expérience) Participation aux algorithmes de reconstruction de vertex au niveau trigger 3 Travail commencé par Eric Renfort CPPM participation à l’identification des b’s important pour SUSY

Préparation à l’Analyse  Les français participent à plusieurs groupes de travail Gros effort  C++ (merci aux informaticiens !) Participation importante dans : Jet et Et (LAL-LPNHE) (Laurent Duflot co-convener) Algorithmes de jets Run I  C++ + améliorations Algorithmes “à la Aleph”  energy flow association traces-cellules (tracking) Et (+LBL) résolution cellules chaudes (nouvel algorithme)

Préparation à l’Analyse Identification des électrons (ISN-LAL) (Michel Jaffré co-convener) Technique de la matrice H (2) Likelihood Monte Carlo “rapide” PMCS (CPPM) (Elemér Nagy convener DØ France groupe de travail DØ)

Préparation à l’Analyse Analyse Run I SUSY avec R-parité violée (CPPM) extension du domaine d’exclusion soumis à publication + note DØ Participation mesure masse W à l’avant note DØ (LPNHE) Recherche du sTop en 4-corps (LPNHE) note DØ (thèse Bob Olivier)

Participation au Démarrage Participation des groupes DØ-IN2P3 Calibration (prioritée) Electronique FE du calorimètre hardware avec calib software: logiciel de test de qualification de l’électronique avec le système des pulseurs. Tests Silicium (E. Kajfasz) Avant montage sur détecteur période test électronique FE calo Mise en marche cellule test Argon

Calcul au CCIN2P3  ferme PC’s uniquement MoU FNAL/IN2P3 point 3 p 1 Cf note (E. Lebreton,Michel Jaffré,PP) “Demande de Ressources au CCIN2P3” MoU FNAL/IN2P3 point 3 p 1 “Participation in the detector Monte Carlo simulation” CCIN2P3 = $250K Installation soft MCC+Analyse (Michel Jaffré) Organisation de la prod (Evelyne Lebreton) (Michel Jaffré) Participation MCC99_2 150K evts en deux mois Participation MCC99_3 MCC99_2x20 en 2000 Analyse + MC “rapide” (crucial)  code sous LINUX (PC)  ferme PC’s uniquement

Calcul au CCIN2P3  Banc de test pour LHC Situation actuelle MCC99_2 volume des données/an = 250 TB (facteur 3 à 4 < LHC seulement) échange des données système de gestion des bandes et des fichiers HPSS ? CASTOR .. Database (crucial pour l’analyse)  Situation actuelle MCC99_2 pas satisfaisante 3000 evts /semaine il en faudrait 1500/jour .. démarrage ? Pas assez de CPU ! Aucun représentant dans la commission informatique ..communication ?? Bonne collaboration entre Fermilab et le CCIN2P3 Bon link 10Mb 20 Mb (Cern-Chicago) merci CMS-Fermilab !!  MoU (à la Babar) Fermilab/CCIN2P3

Bilan des Activités Nombre de thèses : 6 Nombreuses Responsabilités (14 physicien(ne)s) Sujets: Susy avec R ou R nouvelles thèses an 2000 Nombreuses Responsabilités Calibration, jets, e-id, PMCS Génération MC à Lyon comités GCM, MCC99, SSC (élection spokes) 4 voix IB notes DØ présentations à des conférences

Demandes 2000  Calcul Missions Mini cellule mesure pureté Argon CPU  à Lyon Missions missions “techniques IN2P3” en 2000 Calibration Démarrage expérience missions “physique”  nb physicien(ne)s  responsabilités Missions KF Physique Technique CPPM 300 100 ISN 350 100 LAL 450 200 LPNHE 300 200 Mini cellule mesure pureté Argon si mini cryostat 120 KF si cryostat à constuire 200 KF

Conclusion Année 2000 cruciale Besoin de renforcer les groupes Calibration: fin installation et tests Participation démarrage expérience Production MCC Préparation de l’analyse Besoin de renforcer les groupes visiteurs étrangers (venant de DØ) grand bénéfice ex: ISN comparé aux autres expériences grand déficit en ve (un seul à Grenoble) transfert d’autres manips Besoin de participation d’autres groupes Tevatron passage “obligé” (pour la physique) entre le LEP et le LHC