Procurement Essentials Training Module 10: Specialist Requirement 1.

Slides:



Advertisements
Présentations similaires
Let’s enjoy making Session 2. Let’s enjoy making: Session 2 Les déménageurs sont arrivés !
Advertisements

SECURITY OF SUPPLY Georges Bouchard GDF SUEZ European Gas Forum 2010 – Madrid, 19th February 2010.
An Introduction To Two – Port Networks The University of Tennessee Electrical and Computer Engineering Knoxville, TN wlg.
IP Multicast Text available on
1 ISO/TC 176/SC 2/N1282 ISO 9001:2008 to ISO 9001:2015 Summary of Changes.
DIFFERENTIATION NO ONE CAN COMPEL A STUDENT TO LEARN. (MEIRIEU)
Template Provided By Genigraphics – Replace This Text With Your Title John Smith, MD 1 ; Jane Doe, PhD 2 ; Frederick Smith, MD, PhD 1,2 1.
Update on Edge BI pricing January ©2011 SAP AG. All rights reserved.2 Confidential What you told us about the new Edge BI pricing Full Web Intelligence.
CNC Turning Module 1: Introduction to CNC Turning.
UNEP / ICCA Workshop TEMA June DG and GHS Classification System.
1. Neal Creative | click & Learn more Neal Creative © TIP │ Use the built-in c olor palette with green and yellow for callouts and accents Neal Creative.
The Basis of the Servqual Model The Gaps The Key Service Dimensions Causes & Solutions to Gaps.
Theme Three Speaking Questions
Business Case Title Company name
How to form questions in French
Reference Document Document de référence
What about discrete point skills?
Infinitive There are 3 groups of REGULAR verbs in French: verbs ending with -ER = 1st group verbs ending with -IR = 2nd group verbs ending with -RE = 3rd.
LES MODULES PLAN DE DEVELOPPEMENT PERSONNEL LEADERSHIP ART ORATOIRE.
La mise en oeuvre du Plan d’Investissement pour l’Europe
Speaking Exam Preparation
Reference Document Document de référence
Cross Cutting Mapping Project
Samples for evaluation from All Charts & Templates Packs for PowerPoint © All-PPT-Templates.comPersonal Use Only – not for distribution. All Rights Reserved.
Reflective verbs or Pronominal verbs
Hotel Divisions & Departments. Departments in Rooms Division Front Office is responsible for guest registration and check-out. It includes mail and information.
Français I – Leçon 6A Structures
Theme One Speaking Questions
Welcome To Waterside Village Community Channel
CRS: Professional Certification April 2013?
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
F RIENDS AND FRIENDSHIP Project by: POPA BIANCA IONELA.
About INTEGRA The Integrated community, probation and prison services radicalisation prevention approach strives to improve the transition process between.
Copyright 2007 – Biz/ed Globalisation.
- 20/02/ TTM key success factor 1 : Work in a project team …. So we must work in a team ! Mark & sales Technology NTW, IT & Device Implementation.
REVISED JUDGING CRITERION: UNDERSTANDING LIVELIHOODS.
Setting SMART Objectives Training. ©SHRM Introduction Of all the functions involved in management, planning is the most important. As the old saying.
1. Financial (Accounting) Statements  Financial or Accounting statements are used for reporting corporate activity. 2 For Stakeholders.
1 ISO/TC 176/SC 2/N1219 ISO 9001:2015 Revision overview - General users July 2014.
Français - couleurs - pays - drapeaux
The Passé Composé In the previous lesson we looked at the formation of the passé composé (perfect tense) with Avoir verbs. In this lesson we will further.
Le soir Objectifs: Talking about what you do in the evening
Qu’est-ce que tu as dans ta trousse?
Les garanties de vie Taxes.
EDHEC OPEN INNOVATION - Season 8 - Company LOGO Business Case Title.
Benchmarking noise policies
Qu’est-ce que tu as dans ta trousse?
Forum national sur l’IMT de 2004.
Definition Division of labour (or specialisation) takes place when a worker specialises in producing a good or a part of a good.
Quelle est la date aujourd’hui?
Understanding Constraints in Primavera P6Primavera P6.
1-1 Introduction to ArcGIS Introductions Who are you? Any GIS background? What do you want to get out of the class?
By:- Israr K. Raja Islamabad, Pakistan. Supply Chain Activities those Affect the Financial Performance Supply chain managers make decisions and use organizational.
QA/QC implementation Is the report the final issue of this task ?
BRMS Implementation Status Update Template designed by 18-July-2015.
POWERPOINT PRESENTATION FOR INTRODUCTION TO THE USE OF SPSS SOFTWARE FOR STATISTICAL ANALISYS BY AMINOU Faozyath UIL/PG2018/1866 JANUARY 2019.
SLIDE TITLE PowerPoint Presentation SUBTITILE HERE.
© by Vista Higher Learning, Inc. All rights reserved.4A.1-1 Point de départ In Leçon 1A, you saw a form of the verb aller (to go) in the expression ça.
Programmation de l'égalité des genres dans l'action humanitaire
William De Angelis EU Cybersecurity strategy N.I.S. Directive C.I.L.E. compliance guidance.
Global Challenge Flashing Wheels Lesson 1.
Dans ma Salle de classe
1 Sensitivity Analysis Introduction to Sensitivity Analysis Introduction to Sensitivity Analysis Graphical Sensitivity Analysis Graphical Sensitivity Analysis.
Laboratory Information Management Systems (LIMS) Lindy A. Brigham Div of Plant Pathology and Microbiology Department of Plant Sciences PLS 595D Regulatory.
Le Passé Composé (Perfect Tense)
Les négatifs et l’interrogation
Presentation plan 1. Our journey in RPL 2. Our methodology
Prepositions of Location
Les Jours de la Semaine ©  Copyright Kapow! 2017.
IMPROVING PF’s M&E APPROACH AND LEARNING STRATEGY Sylvain N’CHO M&E Manager IPA-Cote d’Ivoire.
Transcription de la présentation:

Procurement Essentials Training Module 10: Specialist Requirement 1

Procurement Essentials Training Modules 0. Procurement for Non- Procurement 1.Procurement Guidance 2.Procurement Standards 3.Sourcing Pipelines 4.Sourcing Thresholds and Process 5.Procurement Committees 6.Supplier Evaluation & Negotiation 7.Sourcing Outcomes 8.Purchasing 9.Supplier Management 10. Specialist Requirement Module 10 – Specialist Requirements 2

Learning Objectives This training module covers the following learning objectives: 3 Understand key specialist requirements in the following categories Constructions Pharmaceuticals Gift in Kind Cash Transfer Programs Food Emergency Travel Module 10 – Specialist Requirements

Specialist Requirements - Construction All construction should comply with the process standards set out in the SCI Construction Policy, Standard Benchmarks and Tools (OneNet) SCI Construction Policy, Standard Benchmarks and Tools ProcessDescription EI Tender Tender Package Communicates Design Specification Site Constraints Pre-Tender Clarification Meeting Details of project outlined Q&A E2 Competitive Bid Analysis Criteria of Assessment Human Financial Physical resources Evaluation Weighted scoring included in tender documents Scoring mechanism applied in fair and transparent way Module 10 – Specialist Requirements 4

Specialist Requirements - Construction All construction should comply with the process standards set out in the SCI Construction Policy, Standard Benchmarks and Tools (OneNet) SCI Construction Policy, Standard Benchmarks and Tools ProcessDescription E3 Contract Documentation International Construction Standard Form Standard Contract Available on OneNet Local Standard Contract Standard contract in local context Use ahead of standard SCI Form G2 Final Payment, Retention The final payment and holding of retention is a controlled process that ensures that quality is satisfactory to all formal stakeholders before payment is made Module 10 – Specialist Requirements 5

Specialist Requirements - Pharmaceuticals & GIK The specific requirements of planning, sourcing, managing and using health care commodities can be found in the Save the Children Pharmacy HandbookPharmacy Handbook ProcessDescription Quality Product quality takes primacy over all procurement decisions Compromising quality may result in: Sickness, injury or death Reputational damage Legal implications Financial penalty Gift in Kind (GIK) GIK donations (pharmacy) of healthcare should be carefully considered to assess their appropriateness and Quality GIKs are are managed by SCI Awards and Finance Managements systems. They are reported in accordance with donor requirements GIK focal person in country shall register, track and report on all items received in GIK tracker. Module 10 – Specialist Requirements 6

Specialist Requirements - Cash Transfer Programs The Global Service Provider FWA & Cash Transfer Programming (CTP) Manual must be consulted prior to engaging any supplier ProcessDescription Global Cash Transfer Solution (GCTS) SCI has preselected Country, Regional and Global network of leading providers as part of its Global cash transfer solution to deliver cash in most markets Exceptions If a GCTS provider is not available to cover program needs then the exceptions approval process is described in the CTP Manual must be followed The service fee (not including the cash handled) is the threshold value used for deciding on the appropriate Sourcing Procedure- with additional checks Module 10 – Specialist Requirements 7

Specialist Requirements - Food/ Emergency Food related procurements is managed in accordance with Commodity Management Tool Kit and Food Manual. For Emergency situations we will have new Guidelines to be followed. ProcessDescription Food Manual and Tool kit Food related procurements and operations should be managed in accordance with specific guidelines as stated in Commodity Management Tool Kit and Food Manual. Module 10 – Specialist Requirements 8 Emergency Emergency Procurement Guidelines to be followed ( in process by subject matter expert).

Specialist Requirements Travel The procurement of Travel has specialist requirements due to risk management and SCI’s duty of care to our staff it is current owned by Global Safety and Security (GSS). Module 10 – Specialist Requirements 9 Process Description Travel Sourcing of flights, lodgings and hotels that require a Procurement Committee, the business owner (a mandatory Committee role) must be a representative from the Safety and Security team All sourced hotels must pass a Security Risk Assessment prior to use. The requisitioning / approval of all international business trips must have an approved Travel Authorisation Request (TAR) prior to travel. The Travel Policy is owned by GSS and its compliance is managed by the Global Travel Manager.

Are the following statements true or false?Instructions: Using Skype for Business, answer each question on the right Each question is a “true or false” question – type in True or False in the text box to answer. 1 2 Type ‘True’ or ‘False’ then press enter 11 3 There are different tools and templates for dealing with construction related activities Gifts in Kind are always appropriate and accepted when concerning medical and pharmaceutical supplies All employees must use existing framework agreements for CTP where applicable Module 10: Checkpoint Straw Poll TRUE FALSE TRUE Module 10 – Specialist Requirements

All construction requirements should comply with the process standards set out in the SCI Construction Policy, Standard Benchmarks and Tools (OneNet) The specific requirements of planning, sourcing, managing and using health care commodities can be found in the Save the Children Pharmacy HandbookPharmacy Handbook All employees must use existing framework agreements, contracts and Procurement with preferred suppliers when dealing with Cash Transfer Programs Food related procurements and operations should be managed in accordance with specific guidelines as stated in Commodity Management Tool Kit and Food Manual. Key messages to remember Module 10 – Specialist Requirements 11

Learning Objectives 12 You have now been trained in the governance sections of the Procurement Manual. You can now: Understand the special requirements for key categories Understand where to find specific requirements/standards for key categories Module 10 – Specialist Requirements

Module 10 – Difference between old and new Manual AreaCurrent Procedure New ProcedureRationale Construction, Pharmacy, CTP Same section with some revisions in contents Revised by subject matter expertSimplify and accelerate approvals align with donor expectations FoodSame section with some revisions in contents Food section is revised by subject matter expert. GIK is same as before Simplify and accelerate approvals EmergencyNot existing beforeEmergency Guidelines to be followed for Procurement. ( New and under process of development) Simplify and accelerate approvals TravelExisting before as a standalone document inserted linkages with Procurement Insert reference towards Travel policy and roles in Procurement Simplify and accelerate approvals Bonding requirements Not existing beforeNew area inserted to secure SCI risk exposure & requirements by USAID Reduce Fraud /Align with donor expectations Specialist Requirements Module 10 – Specialist Requirements 14